Uglješa Srbislav Bugarić

Dr. Uglješa Srbislav Bugarić

University of Belgrade - Faculty of Mechanical Engineering, Belgrade, Beograd, Serbia
orcid

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 March 2022 in Mathematics
Verified
Journal Article
Open access
PDF file
SDStevan Djenadic
Stevan Djenadic
Milos TanasijevicMilos Tanasijevic
Milos Tanasijevic
PJPredrag Jovančić
Predrag Jovančić
DIDragan Ignjatovic
Dragan Ignjatovic
DPDejan Petrović
Dejan Petrović
UBUglješa Srbislav Bugarić
Uglješa Srbislav Bugarić
The risk assessment of engineering systems represents an important part of the quality of service and dependability. The existing methods for risk evaluation use crisp sets for rating partial indicators’ proposition and their cumulative products as an overall indicator. In this paper, existing FMEA and FMECA methods have been improved using the fuzzy expert system for calculating the risk priority number. The application of fuzzy logic allows the use of linguistic descriptions for risk analysis. In this way, the state of the system in terms of risks and consequences is better described. The settings of the fuzzy systems are based on the application of two multi-criteria decision-making methods. The AHP method was used to define the mutual relationship of the impact of partial indicators (occurrence, severity, and detectability) on risk. In this way, subjectivity in risk assessment is reduced. In the composition of the fuzzy model, the TOPSIS method is introduced to reduce the dissipation of results, which contributes to the accuracy of the outcome. This contributes to the accuracy of the results. The results were verified through a case study of a complex engineering system—bucket-wheel excavators. The risk was observed from the aspect of the danger of damage and the danger of downtime. The initial information for weak points of ES is defined according to historical damage events and statistics of downtime. Expert knowledge was used for weak points grading in the model. Additional model verification was performed using similar methods, using the same input data. The innovative model, presented in the paper, shows that it is possible to correct different weights of risk indicators. The obtained results show less dispersion compared with other existing methods. Weak points with increased risk have been located, and an algorithm has been proposed for risk-based maintenance application and implementation.

21 December 2022 in Engineering Applications of Artificial Intelligence
Verified
Journal Article
Closed access
APAndrija Petrović
Andrija Petrović
MNMladen Nikolić
Mladen Nikolić
UBUglješa Srbislav Bugarić
Uglješa Srbislav Bugarić
Boris DelibašićBoris Delibašić
Boris Delibašić
PLPietro Lio
Pietro Lio

24 October 2019 in Energies
Verified
Journal Article
Open access
PDF file
SDStevan Djenadic
Stevan Djenadic
DIDragan Ignjatovic
Dragan Ignjatovic
Milos TanasijevicMilos Tanasijevic
Milos Tanasijevic
UBUglješa Srbislav Bugarić
Uglješa Srbislav Bugarić
IJIvan Jankovic
Ivan Jankovic
TŠTomislav Šubaranović
Tomislav Šubaranović
Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the coefficient of time use of the machine. This approach is not good enough because it does not go into the structure of the availability itself and requires a high level of IT support in system monitoring. In this sense, this paper will use the fuzzy theory and the corresponding analytic hierarchy process (AHP) multi-criteria analysis to present a conceptual and mathematical model for the assessment of availability based on expert judgment. The model will be shown in the case study (on the example) of bulldozers working in the open-pit lignite mine.

4 October 2012 in SIMULATION
Verified
Journal Article
Closed access
UBUglješa Srbislav Bugarić
Uglješa Srbislav Bugarić
DPDusan B Petrovic
Dusan B Petrovic
ZJZorana V Jeli
Zorana V Jeli
DPDragan V Petrovic
Dragan V Petrovic
This paper analyses the capacity of a bulk cargo unloading river terminal, i.e. the existing terminal configuration with two unloading devices (operation without a help strategy and under a complete help strategy between unloading devices) and the predicted future terminal configuration with three unloading devices operating under a partial help strategy. The optimization procedure to determine unloading terminal optimal utilization, for each terminal configuration and operation strategy (existing and future situation) is also shown, due to the fact that ports (terminals) operation under an optimal capacity provides prompt accommodation of vessels with the minimum port waiting time and maximum use of berth facilities. For the purpose of a comprehensive analysis, three different river terminal simulation models have been developed due to the number of unloading devices and their operation strategy. Some of the obtained results have been applied and verified on the existing system.

1 January 2022 in FME Transactions
Verified
Journal Article
Open access
PDF file
RJRadiša Jovanović
Radiša Jovanović
UBUglješa Srbislav Bugarić
Uglješa Srbislav Bugarić
MVMitra V. Vesović
Mitra V. Vesović
NPNatalija B. Perišić
Natalija B. Perišić
This paper presents the proportional-derivative fuzzy controller for trajectory tracking of the gripping mechanism with two degrees of freedom. Aiming to achieve movement of the gripping mechanism without sudden starting and stopping, a polynomial velocity profile is utilized. The African vultures optimization, as one of the latest metaheuristic algorithms, is used to obtain the optimal input/output scaling gains of the proposed fuzzy controller according to the selected fitness function. The results obtained by this algorithm are compared with the other three new and popular metaheuristic algorithms: the whale optimization, the ant lion optimization and the sine cosine algorithm. Moreover, a simulation study was done for the defined initial position and for the scenario where there is a certain deviation because the gripping mechanism is not at its original initial position. Finally, the robustness of the controller is tested for the case when the masses of the segments increase three times. The results revealed that the suggested controller was capable of dealing with nonlinearities of the gripping mechanism, initial position and parameter changes. The movement of the gripping mechanism is smooth and follows the defined trajectory.

1 January 2020 in Mining and Metallurgy Engineering Bor
Verified
Journal Article
Open access
PDF file
UBUglješa Srbislav Bugarić
Uglješa Srbislav Bugarić
Milos TanasijevicMilos Tanasijevic
Milos Tanasijevic
MGMiljan Gomilanović
Miljan Gomilanović
APAndrija Petrović
Andrija Petrović
MIMiloš Ilić
Miloš Ilić
Rotary excavators as the basic machines at the open pits of lignite operate in very difficult working conditions, where they are constantly expected to be highly productive, reliable, available and safe as the production carriers. Determining the availability as well as the duration and number of failures using the analytical methods allows to analyze the key influencing factors on their occurrence and values of these parameters and to determine the essential elements of system maintenance and management in order to optimize them.