Arshad Alhasnawi

Prof. Dr. Arshad Alhasnawi

Al-Muthanna University
orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 March 2024 in Current Plant Biology
Verified
Journal Article
Open access
NPNandang Permadi
Nandang Permadi
SASulistya Ika Akbari
Sulistya Ika Akbari
Dedat PrismantoroDedat Prismantoro
Dedat Prismantoro
NINastiti Nur Indriyani
Nastiti Nur Indriyani
MNMohamad Nurzaman
Mohamad Nurzaman
EJEuis Julaeha
Euis Julaeha

25 September 2023 in Information
Verified
Journal Article
Open access
PDF file
Bilal Naji AlhasnawiBilal Naji Alhasnawi
Bilal Naji Alhasnawi
BJBasil H. Jasim
Basil H. Jasim
AJAli M. Jasim*
Ali M. Jasim*
Vladimír BurešVladimír Bureš
Vladimír Bureš
AAArshad Alhasnawi
Arshad Alhasnawi
Bishoy E. SedhomBishoy E. Sedhom
Bishoy E. Sedhom
The electrical demand and generation in power systems is currently the biggest source of uncertainty for an electricity provider. For a dependable and financially advantageous electricity system, demand response (DR) success as a result of household appliance energy management has attracted significant attention. Due to fluctuating electricity rates and usage trends, determining the best schedule for apartment appliances can be difficult. As a result of this context, the Improved Cockroach Swarm Optimization Algorithm (ICSOA) is combined with the Innovative Apartments Appliance Scheduling (IAAS) framework. Using the proposed technique, the cost of electricity reduction, user comfort maximization, and peak-to-average ratio reduction are analyzed for apartment appliances. The proposed framework is evaluated by comparing it with BFOA and W/O scheduling cases. In comparison to the W/O scheduling case, the BFOA method lowered energy costs by 17.75%, but the ICSA approach reduced energy cost by 46.085%. According to the results, the created ICSA algorithm performed better than the BFOA and W/O scheduling situations in terms of the stated objectives and was advantageous to both utilities and consumers.

4 July 2024 in Energy Strategy Reviews
Verified
Journal Article
Open access
BABilal Naji Alhasnawi
Bilal Naji Alhasnawi
BJBasil H. Jasim
Basil H. Jasim
AAArshad Alhasnawi
Arshad Alhasnawi
FHFiras Faeq K. Hussain
Firas Faeq K. Hussain
Raad Z. HomodRaad Z. Homod
Raad Z. Homod
BSBishoy E. Sedhom
Bishoy E. Sedhom

7 June 2022 in IET Renewable Power Generation
Verified
Journal Article
Open access
BABilal Naji Alhasnawi
Bilal Naji Alhasnawi
BJBasil H. Jasim
Basil H. Jasim
RMRiyadh Mansoor
Riyadh Mansoor
AAArshad Alhasnawi
Arshad Alhasnawi
ZRZain‐Aldeen S. A Rahman
Zain‐Aldeen S. A Rahman
PSPieruigi Siano
Pieruigi Siano
The steady increase in the energy demand and the growing carbon footprint has forced electricity‐based utilities to shift from their use of non‐renewable energy sources to renewable energy sources. Furthermore, there has been an increase in the integration of renewable energy sources in the electric grid. Hence, one needs to manage the energy consumption needs of the consumers, more effectively. Consumers can connect all the devices and houses to the internet by using Internet of Things (IoT) technology. In this study, the researchers have developed and proposed a novel 2‐stage hybrid method that schedules the power consumption of the houses possessing a distributed energy generation and storage system. Stage 1 modeled the non‐identical Home Energy Management Systems (HEMSs) that can contain the DGS like WT and PV. The HEMS organise the controllable appliances after taking into consideration the user preferences, electricity prices and the amount of energy produced /stored. The set of optimal consumption schedules for every HEMS was estimated using a BPSO and BSA. On the other hand, Stage 2 includes a Multi‐Agent‐System (MAS) based on the IoT. The system comprises two portions: software and hardware. The hardware comprises the Base Station Unit (BSU) and many Terminal Units (TUs).

1 April 2023 in Horticulturae
Verified
Journal Article
Open access
PDF file
Nandang PermadiNandang Permadi
Nandang Permadi
MNMohamad Nurzaman
Mohamad Nurzaman
AAArshad Alhasnawi
Arshad Alhasnawi
Febri DoniFebri Doni
Febri Doni
EJEuis Julaeha
Euis Julaeha
Browning and contamination are regarded as the main constraints in the plant tissue culture of Musa spp. that can hinder the success of plant propagation in vitro. Browning is caused by enzymatic reactions due to explant injury, while microbial contamination is caused by phyllospheric, rhizospheric, and endophytic microorganisms that reside on, in, and inside the plants. When not properly addressed, they can cause decreased regenerative ability, decreased callus growth, inhibited adventitious shoot growth, and even tissue death. To overcome the browning problem, various attempts have been made in vitro, e.g., immersing the explants in an anti-browning solution, incorporating anti-browning compounds into the medium, and manipulating cultural practices. Correspondingly, to control the problem of contamination, efforts have been made, for example, using various methods, such as thermotherapy, chemotherapy, and cryotherapy, and chemical agents, such as disinfectants, antiseptics, and nanoparticles. This review aims to investigate and provide a comprehensive understanding of the causes of browning and contamination as well as the many approaches used to control browning and contamination problems in Musa spp. tissue cultures.

13 November 2022 in Energies
Verified
Journal Article
Open access
PDF file
Bilal Naji AlhasnawiBilal Naji Alhasnawi
Bilal Naji Alhasnawi
BJBasil H. Jasim
Basil H. Jasim
AAArshad Alhasnawi
Arshad Alhasnawi
Bishoy E. SedhomBishoy E. Sedhom
Bishoy E. Sedhom
AJAli M. Jasim*
Ali M. Jasim*
PSPierluigi Siano
Pierluigi Siano
In this study, an improved artificial intelligence algorithms augmented Internet of Things (IoT)-based maximum power point tracking (MPPT) for photovoltaic (PV) system has been proposed. This will facilitate preventive maintenance, fault detection, and historical analysis of the plant in addition to real-time monitoring. Further, the simulation results validate the improved performance of the suggested method. To demonstrate the superiority of the proposed MPPT algorithm over current methods, such as cuckoo search algorithms and the incremental conductance approach, a performance comparison is offered. The outcomes demonstrate the suggested algorithm’s capability to track the Global Maximum Power Point (GMPP) with quicker convergence and less power oscillations than before. The results clearly show that the artificial intelligence algorithm-based MPPT is capable of tracking the GMPP with an average efficiency of 88%, and an average tracking time of 0.029 s, proving both its viability and effectiveness.