Purpose: In the construction industry, cash flow issues can impact both contractors and owners. Although finance-based scheduling (FBS) models were developed to control contractors’ cash flow, researchers completely disregarded cash flow management for owners’ portfolios. Therefore, FBS is once again introduced in this study from the perspective of the owners of portfolios. Design/methodology/approach: For the FBS problem of portfolio owners (FBS-PO), a mixed integer linear program (MILP) model is developed. The purpose is to ensure that owners’ cash inflows are greater than cash outflows while minimizing the sum of weighted extensions of the projects in portfolios. Owing to the difficulties encountered in solving the proposed MILP model, genetic algorithm (GA) and particle swarm optimization (PSO) meta-heuristics are used. To ensure the feasibility of the solutions, a special serial schedule generation heuristic was developed in conjunction with the random key method for chromosome representation. Findings: The GA produced higher-quality solutions compared to PSO, though it required more processing time. The GA has proven to be a far better choice than the MILP exact solver for bigger portfolios. Additionally, there is a linear correlation between the number of activities in portfolios and the amount of computational time required for the GA to converge. Originality/value: This paper introduces the new research domain of FBS from the owners’ perspective (FBS-PO). In order to establish the FBS-PO as a stand-alone domain, a critical review of the FBS studies in the literature was conducted. In addition, the goals, characteristics, implementation and challenges of the FBS heuristics are benchmarked against those of the special serial schedule generation heuristic developed for the FBS-PO problem.
Construction contractors often rely on external funding to manage financial deficits caused by irregular cash inflows and outflows. To address these cash flow challenges, contractors typically adjust the start times of project activities to prevent shortages while minimizing the overall project duration. However, in severe cases, operations may need to halt if cash flow issues cannot be adequately resolved. This study introduces an alternative strategy to prevent cash shortages by allowing for the temporary suspension of activities, known as activity splitting. In this approach, operations are paused to conserve cash and then resumed when sufficient funds become available. The potential benefit of this method is illustrated through a simple, four-activity project. Extending the application to more complex projects with a set of splittable activities—each having different cash requirements, durations, and associated splitting costs—the challenge lies in identifying the optimal activities to split and determining the precise suspension and resumption times, all while minimizing or avoiding project delays and additional costs. To address this, we present a novel mixed-integer linear programming (MILP) model that optimizes the scheduling and splitting of activities to minimize project duration without breaching financial constraints. The MILP model effectively identifies the best trade-off between activity splitting and project extension, taking into account the financial and cost implications of the contractor’s constraints. This is demonstrated through a case study that considers different scenarios related to splitting costs and financial limitations.
1 March 1997 in Journal of Construction Engineering and Management
Steel silos are widespread around the world, and are used for storing different materials, including cement, fertilizers, grains, and raw materials. Building a new silo provides a fairly big storage capacity within a short period of time. There are many types of steel silos, including field-welded silos, bolted silos, bolted silos with corrugated steel sheets, and silos (with small capacities) completely fabricated in shops. This paper presents a new method of construction that has been used in Egypt to build bolted silos with corrugated steel sheets. This method mainly features inverting the traditional sequence of field tasks, such that the building operation starts with the uppermost part of the structure and proceeds to the lowermost part. The method requires that the completed parts of the structure be lifted up, using specially devised tripod-mounted hoists, so that building operations always take place at grade. The new method is described in this paper in detail, along with the problems encountered during field operations. In addition, the merits, in terms of the basics of construction management, are discussed. They are cost, schedule, quality, and safety. Finally, this paper presents a new method that offers substantial opportunity for enhancing constructability of steel silos during field operations.