Mubarak Al Alawi

Dr. Mubarak Al Alawi


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2023 in Heliyon
Verified
Journal Article
Open access
MSMohammed Al Shaaili
Mohammed Al Shaaili
Mubarak Al AlawiMubarak Al Alawi
Mubarak Al Alawi
RERonald Ekyalimpa
Ronald Ekyalimpa
BMBader Al Mawli
Bader Al Mawli
AAAbdullah Al-Mamun
Abdullah Al-Mamun
MSMohammed Al Shahri
Mohammed Al Shahri
The strategic role of near-miss data in safety management is undeniably vital. This data provides early warnings of potential accidents, thus serving as a proactive tool for recognizing weak points in safety management and preventing disasters. Reinforcing this premise, an investigation was launched to delve into the classification and analysis of near-miss accident data, aiming to augment safety prevention knowledge in the Nama Water Services (NWS) Company. The study engaged in comprehensive activities, including gathering near-miss reports, engaging with HSE personnel, formulating a standardized near-miss data form, and analyzing the collected data. Additionally, it proposed a structured guideline for identifying, analyzing, and classifying near-miss incidents, hinging on various parameters like types of hazards, operations, time of occurrence, and project segments. The findings highlighted that the construction projects involving pipelines and reservoirs experienced the most incidents, predominantly occurring during weekday mornings and afternoons. Major hazards included falls from scaffolds, falls within trenches, and lax housekeeping. Most notably, the operations most frequently associated with near-miss incidents were excavation, lifting, and loading. A deep dive into the root causes revealed that poor supervision, inadequacies in the safe work system, insufficient control measures, and inadequate training were the primary culprits. Furthermore, the study indicated that workers and equipment bore the brunt of these incidents.

21 August 2021 in Asian Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
Mubarak Al AlawiMubarak Al Alawi
Mubarak Al Alawi
Maintaining a stable productivity rate in a construction project is a challenge. Many external and internal factors influence it. Delay in payment is one of the factors representing the project cash flow and mirrors the company’s financial stability status. This study explores the delay in payments effects on the construction productivity of the small and medium construction companies in Oman. Also, it ranks the delay in payment among other productivity factors. Sixty-five small and medium construction companies registered in Oman Tender Board participated in the questionnaire survey. The results showed that delay in payment significantly affects the financial stability of the companies. The delay in payment was ranked third out of 21 influencing productivity factors. The results were compared with a previous study that covered large construction companies in Oman. It was found that the rank of delay in payment in the small and medium construction is significantly higher than what was found in large companies.

8 July 2022 in Asian Journal of Civil Engineering
Verified
Journal Article
Closed access
PDF file
SHSaid Al Hamadani
Said Al Hamadani
Mubarak Al AlawiMubarak Al Alawi
Mubarak Al Alawi
ANAli Al Nuaimi
Ali Al Nuaimi

8 April 2025 in The Journal of Engineering Research
Verified
Journal Article
Open access
PDF file
Mubarak Al AlawiMubarak Al Alawi
Mubarak Al Alawi
AAAmwaj Al Abdali
Amwaj Al Abdali
MSMohammed Al Shahri
Mohammed Al Shahri
SAShadi Altawil
Shadi Altawil
Construction projects are unique and influenced by many external and internal factors hindering the efficiencies of operations. Different construction companies may have different influencing productivity factors depending on the company’s scale. Large construction companies have better resource management systems than the construction small and medium enterprises (SME). The construction SMEs work in small scale projects, and the amount and type of the required resources are different from the large construction companies. Therefore, identifying the factors affecting construction productivity is essential to determine the best action to avoid any unforeseen productivity reduction. This study aims to rank the most influencing productivity factors in small and medium construction (SME) companies. A questionnaire survey was used to collect data from small and medium construction companies registered in Oman Tender Board. The relative importance index (RII) was used to evaluate the responses. Sixty-five companies out of the 207 targeted population participated in the survey. It was found that - incomplete drawings and drawing omissions, poor site condition and management, delay in payment, unavailability of proper tools and equipment, and workers absenteeism and turnover were found as the top factors that influence construction productivity.

4 February 2025 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
AFAli Fares
Ali Fares
AEAshraf Elazouni
Ashraf Elazouni
SASameh Al-Shihabi
Sameh Al-Shihabi
Mubarak Al AlawiMubarak Al Alawi
Mubarak Al Alawi
Purpose: In the construction industry, cash flow issues can impact both contractors and owners. Although finance-based scheduling (FBS) models were developed to control contractors’ cash flow, researchers completely disregarded cash flow management for owners’ portfolios. Therefore, FBS is once again introduced in this study from the perspective of the owners of portfolios. Design/methodology/approach: For the FBS problem of portfolio owners (FBS-PO), a mixed integer linear program (MILP) model is developed. The purpose is to ensure that owners’ cash inflows are greater than cash outflows while minimizing the sum of weighted extensions of the projects in portfolios. Owing to the difficulties encountered in solving the proposed MILP model, genetic algorithm (GA) and particle swarm optimization (PSO) meta-heuristics are used. To ensure the feasibility of the solutions, a special serial schedule generation heuristic was developed in conjunction with the random key method for chromosome representation. Findings: The GA produced higher-quality solutions compared to PSO, though it required more processing time. The GA has proven to be a far better choice than the MILP exact solver for bigger portfolios. Additionally, there is a linear correlation between the number of activities in portfolios and the amount of computational time required for the GA to converge. Originality/value: This paper introduces the new research domain of FBS from the owners’ perspective (FBS-PO). In order to establish the FBS-PO as a stand-alone domain, a critical review of the FBS studies in the literature was conducted. In addition, the goals, characteristics, implementation and challenges of the FBS heuristics are benchmarked against those of the special serial schedule generation heuristic developed for the FBS-PO problem.

1 October 2020 in Data in Brief
Verified
Journal Article
Open access
Mubarak Al AlawiMubarak Al Alawi
Mubarak Al Alawi
ABAhmed Bouferguene
Ahmed Bouferguene
YMYasser Mohamed
Yasser Mohamed
The construction of industrial projects involves fabricating and installing massive quantities of pipelines. The design data of pipelines is complex, usually unique for each project and not easily available to researchers and the public for confidentiality reasons. As a result, an industrial pipelines data generator able to realistically simulate pipelines structures will lessen the dependence on real-life data. This article describes an industrial pipelines data generator that was developed using topological and physical properties of pipelines from real industrial projects. This generator can simulate the properties (the type of component, length, diameter, running direction, and the connectivity relationships between components) of real industrial pipelines. Its application in construction engineering and management research, more specifically in the experimental analysis of an optimization algorithm, was described by the authors in previous work [1]. The data generator can be used to develop benchmark problem instances for optimization problems and for simulation studies of construction operations in industrial projects.