Asma Ladj

Dr. Asma Ladj

orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2021 in Journal of Manufacturing Systems
Verified
Journal Article
Closed access
ALAsma Ladj
Asma Ladj
ZWZhiqiang Wang
Zhiqiang Wang
OMOussama Meski
Oussama Meski
FBFarouk Belkadi
Farouk Belkadi
MRMathieu Ritou
Mathieu Ritou
CCCatherine Da Cunha
Catherine Da Cunha

1 January 2017 in Procedia Computer Science
Verified
Journal Article
Open access
ALAsma Ladj
Asma Ladj
FTFatima Benbouzid-Si Tayeb
Fatima Benbouzid-Si Tayeb
CVChristophe Varnier
Christophe Varnier
ADAli Ayoub Dridi
Ali Ayoub Dridi
NSNacer Selmane
Nacer Selmane

1 January 2016 in IFAC-PapersOnLine
Verified
Journal Article
Closed access
ALAsma Ladj
Asma Ladj
CVC. Varnier
C. Varnier
FTF. Benbouzid-Si Tayeb
F. Benbouzid-Si Tayeb

22 October 2019 in IEEE Engineering Management Review
Verified
Journal Article
Closed access
OMOussama Meski
Oussama Meski
FBFarouk Belkadi
Farouk Belkadi
FLFlorent Laroche
Florent Laroche
ALAsma Ladj
Asma Ladj
BFBenoit Furet
Benoit Furet

21 November 2016
Verified
Conference Paper
Closed access
ALAsma Ladj
Asma Ladj
FTFatima Benbouzid-Si Tayeb
Fatima Benbouzid-Si Tayeb
CVChristophe Varnier
Christophe Varnier
Recently, Prognostics and Health Management (PHM) reveals to be a key feature for industrials as it should improve manufacturing system availability and allow avoiding downtime as well as inopportune maintenance spending. In this context, we investigate the problem of scheduling several jobs on a single machine subjected to predictive maintenance based on PHM. We propose a new hybrid genetic immune algorithm, called IPro-HGIA, which incorporates an emulation of GA with artificial immune system, to create an integrated prognostic based scheduling for planning both production and predictive maintenance interventions under the total interventions cost minimization criterion. Furthermore, we use the principals of vaccination and receptor editing in order to strengthen search ability. Computational results show the efficiency of our hybrid scheme.

1 September 2018
Verified
Conference Paper
Closed access
ALAsma Ladj
Asma Ladj
FTFatima Benbouzid-Si Tayeb
Fatima Benbouzid-Si Tayeb
CVChristophe Varnier
Christophe Varnier
We tackle in this paper the Permutation Flow-shop Scheduling Problem (PFSP) with predictive maintenance interventions. The objective is to propose an integrated model that coordinates production schedule and predictive maintenance planning so that the total time to complete the schedule after predictive maintenance insertion is minimized. Predictive maintenance interventions are scheduled based on Prognostics and Health Management (PHM) results using a new proposed heuristic. To jointly establish an integrated scheduling of production jobs and predictive maintenance actions, we propose a tailored genetic algorithm incorporating properly designed operators. Computational experiments carried out on Taillard well known benchmarks, to which we add both PHM and maintenance data, show the efficiency of the newly proposed maintenance planning heuristic and genetic algorithm.