1 January 2021 in Journal of Manufacturing Systems
1 December 2016 in Expert Systems with Applications
1 January 2011 in CIRP Annals
15 September 2006 in International Journal of Production Research
The assemble-to-order strategy delays the final assembly operations of a product until a customer order is received. The modules used in the final assembly operation result in a large product diversity. This production strategy reduces the customer waiting time for the product. As the lead-time is short, any product rework may violate the delivery time. Since quality tests can be performed on the stocked modules without impacting the assembly schedule, the quality of the final assembly operations should be the focus. The data-mining approach presented in this paper uses the production data to determine the sequence of assemblies that minimizes the risk of producing faulty products. The extracted knowledge plays an important role in sequencing modules and forming product families that minimize the cost of production faults. The concepts introduced in the paper are illustrated with numerical examples.
2 July 2007 in IEEE Transactions on Automation Science and Engineering
The assemble-to-order (ATO) production strategy considers a tradeoff between the size of a product portfolio and the assembly lead time. The concept of modular design is often used in support of the ATO strategy. Modular design impacts the assembly of products and the supply chain, in particular, the storage, transport, and production are affected by the selected modular structure. The demand for products in a product family impacts the cost of the supply chain. Based on the demand patterns, a mix of modules and their stock are determined by solving an integer programming model. This model cannot be optimally solved due to its high computational complexity and, therefore, two heuristic algorithms are proposed. A simulated annealing algorithm improves on the previously generated solutions. The computational results reported in this paper show that significant savings could be realized by optimizing the composition of modules. The best performance is obtained by a simulated annealing combined with a heuristic approach.
1 January 2019 in Procedia Manufacturing