TID and displacement damage effects are studied for vertical and lateral power MOSFETs in five different technologies in view of the development of radiation-tolerant fully integrated DC-DC converters. Investigation is pushed to the very high level of radiation expected for an upgrade to the LHC experiments. TID induces threshold voltage shifts and, in n-channel transistors, source-drain leakage currents. Wide variability in the magnitude of these effects is observed. Displacement damage increases the on-resistance of both vertical and lateral high-voltage transistors. In the latter case, degradation at high particle fluence might lead to a distortion of the output characteristics curve. HBD techniques to limit or eliminate the radiation-induced leakage currents are successfully applied to these high-voltage transistors, but have to be used carefully to avoid consequences on the breakdown voltage.
The upgrade of the LHC experiments at CERN brings new challenges in the design and integration of the detectors. Among them and to achieve the required channel density, the power distribution to the front-end electronics of the trackers has to be implemented in a more efficient and compact manner. This paper proposes a new powering scheme for the trackers based on the use of custom on-board DC-DC converters. The converters are designed to tolerate high levels of radiation and intense magnetic fields present in the experiments.
Reliability and safety of critical industrial processes depend on EMC of electronic equipments for ensuring signals integrity. Increasing complexity and quantity of power converters in industrial facilities state the challenge for efficient and fast testing for EMC compliance. This paper proposes a novel combination of EMC testing equipment for pre-compliance testing when EMC test sites are either unavailable or not appropriately priced for the given application. The proposed methods use modern data acquisition and processing equipment to allow a rapid development of hardware and software for in-house or out-in-the-field pre-compliance testing.