Djalma Mosqueira Falcao

Prof. Djalma Mosqueira Falcao

Electrical Engineering, Federal University of Rio de Janeiro, Rio de Janeiro, Brazil
orcid

Research Focus & Metrics

Academic Career Length

26Years (2001-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2001
Verified
Conference Paper
Closed access
Djalma Mosqueira FalcaoDjalma Mosqueira Falcao
Djalma Mosqueira Falcao
HHH.O. Henriques
H.O. Henriques
Estimates of the active and reactive load at certain load points, at regular intervals in the daily load cycle, is a fundamental information for operational planning and real-time control of distribution systems. The load estimation problem is a difficult one owing to the lack of accurate information regarding individual consumer load. Usually, only monthly kWh consumption, used for billing purposes, is available. This paper describes the conceptual basis and preliminary results of a load estimation project current under way based on actual data from a Brazilian distribution company. The project is based on the application of neural network and fuzzy set techniques to generate standard load curves for classes of consumers based on their monthly energy consumption and a large data base of load curves obtained from measurement campaigns. The load estimator uses these curves to adjust the individual load at the specified load points.

8 April 2024 in Energies
Verified
Journal Article
Open access
PDF file
DHDany Huamannahui Huanca
Dany Huamannahui Huanca
Djalma Mosqueira FalcaoDjalma Mosqueira Falcao
Djalma Mosqueira Falcao
Murilo Eduardo Casteroba BentoMurilo Eduardo Casteroba Bento
Murilo Eduardo Casteroba Bento
To meet future load projection with the integration of renewable sources, the transmission system must be planned optimally. Thus, this paper introduces a comparative analysis and comprehensive methodology for transmission expansion planning (TEP), incorporating the combined effects of wind power, losses, N-1 contingency, a FACTS, and storage in a flexible environment. Specifically, the optimal placement of the FACTS, known as series capacitive compensation (SCC) devices, is used. The intraday constraints associated with wind power and energy storage are represented by the methodology of typical days jointly with the load scenarios light, heavy, and medium. The TEP problem is formulated as a mixed-integer nonlinear programming (MINLP) problem through a DC model and is solved using a specialized genetic algorithm. This algorithm is also used to determine the optimal placement of SCC devices and storage systems in expansion planning. The proposed methodology is then used to perform a comparison of the effect of the different technologies on the robustness and cost of the final solution of the TEP problem. Three test systems were used to perform the comparative analyses, namely the Garver system, the IEEE-24 system, and a real-world Colombian power system of 93 buses. The results indicate that energy storage and SCC devices lead to a decrease in transmission requirements and overall investment, enabling the effective integration of wind farms.

1 March 2009
Verified
Conference Paper
Closed access
WAWaltencir S. Andrade
Waltencir S. Andrade
Carmen L.T. BorgesCarmen L.T. Borges
Carmen L.T. Borges
Djalma Mosqueira FalcaoDjalma Mosqueira Falcao
Djalma Mosqueira Falcao
This paper presents a methodology for integrated reliability evaluation of distribution and sub-transmission systems with the presence of distributed generation (DG) based on different energy sources. The methodology considers the possibility of DG connection at the High Voltage (HV) and Medium Voltage (MV) buses of the distribution substation, as well as along the MV distribution network. The uncertainty of energy availability of time varying energy sources, such as the wind generation, and the chronological variation of the loads are included in the methodology. The network representation includes the main protection and reconfiguration devices, such as breakers, manual switches, automatic sectionalizers, reclosers and fuses. Some operative polices in relation to DG, such as islanded operation, protection schemes for network failures, etc. are analyzed, as well as load shedding prioritization and load transfer between feeders. The system reliability evaluation is based on Sequential Monte Carlo Simulation. The reliability indexes calculated are the load point average failure rate (lambdaL) and the annual outage time (UL) and the system indices SAIFI, SAIDI, EENS and ECOST. Results for the RBTS system and for an actual Brazilian distribution network are presented.

6 April 2006
Verified
Conference Paper
Closed access
GVGanesh Kumar Venayagamoorthy
Ganesh Kumar Venayagamoorthy
YVY. del Valle
Y. del Valle
SMSalman Mohagheghi
Salman Mohagheghi
WQWei Qiao
Wei Qiao
SRS. Ray
S. Ray
TATatiana Assis
Tatiana Assis
Flexible AC transmission systems (FACTS) devices are power electronics based shunt or series devices that are connected to the power network and can improve the system performance and the quality of supply. Application of three types of FACTS devices, a STATCOM, a SCRC and a UPFC, is studied in a 45 bus multimachine power system, as part of the Brazilian power system. The system is exposed to various transient and dynamic disturbances, and the performance of the system reinforced with the FACTS devices is compared with the original system. Simulation results are provided that indicate the effectiveness of these FACTS devices in the overall system behaviour

1 October 2007
Verified
Conference Paper
Closed access
TAT.M.L. Assis
T.M.L. Assis
ANA.R. Nunes
A.R. Nunes
Djalma Mosqueira FalcaoDjalma Mosqueira Falcao
Djalma Mosqueira Falcao
This paper presents a methodology to estimate voltage stability margin using artificial neural networks (ANN). During the training process, a quasi-steady-state (QSS) simulator is used, so the slow dynamic devices, which are important in the voltage stability assessment, are adequately modelled. The results obtained for a test system have shown the potential benefits of the proposed methodology and the importance of considering slow dynamic aspects when the voltage stability margin is to be calculated.

13 November 2024 in Energies
Verified
Journal Article
Open access
PDF file
Djalma Mosqueira FalcaoDjalma Mosqueira Falcao
Djalma Mosqueira Falcao
TSTao Sun
Tao Sun
GTGlauco N Taranto
Glauco N Taranto
TPThiago J. Masseran A. Parreiras
Thiago J. Masseran A. Parreiras
Murilo Eduardo Casteroba BentoMurilo Eduardo Casteroba Bento
Murilo Eduardo Casteroba Bento
RBRoberto Brandao
Roberto Brandao
This paper presents the preliminary results of studies aiming to use a battery energy storage system (BESS) in the Brazilian transmission system. The main objective of the BESS is to solve congestion problems caused mainly by the large increase in variable renewable generation in certain system areas. The studies were conducted based on actual forecasted system scenarios using a full representation of the electric grid available from the Brazilian system operator data base. In this work, only the steady-state modeling was considered as this may be the first stage in the assessment of a new technology. A qualitative economic comparison of the BESS application with other possible solutions to the congestion problems is also included.