Due to the accelerated growth of electricity demand, the scarcity of primary resources to produce electricity, and technological advances in recent years, electricity companies must face and solve these challenges in the best possible way, and for that, the Transmission Network Expansion Planning (TNEP) plays a crucial role, since the decisions taken in longterm planning determine the optimal form of expansion of the networks, to respond to these needs of electricity demands. On the other hand, there is also the tendency to leave the TNEP problem more efficient, robust, and closer to what happens in real electrical networks. For these reasons, this article proposes a methodology to solve the TNEP problem considering active power losses. The problem is formulated as a mixed-integer nonlinear programming (MINLP) problem. The Chu-Beasley Genetic Algorithm (CBGA) is used to transform the MINLP problem into a linear programming (LP) problem. Furthermore, the Villasana Garver constructive heuristic (VGCH) algorithm is used to make the investment proposals made by the AGCB feasible. To measure the efficiency and effectiveness of the proposed methodology several tests are performed on the 6- bus Garver system, the IEEE 24-bus test system, and the South Brazilian 46-bus test system
To meet future load projection with the integration of renewable sources, the transmission system must be planned optimally. Thus, this paper introduces a comparative analysis and comprehensive methodology for transmission expansion planning (TEP), incorporating the combined effects of wind power, losses, N-1 contingency, a FACTS, and storage in a flexible environment. Specifically, the optimal placement of the FACTS, known as series capacitive compensation (SCC) devices, is used. The intraday constraints associated with wind power and energy storage are represented by the methodology of typical days jointly with the load scenarios light, heavy, and medium. The TEP problem is formulated as a mixed-integer nonlinear programming (MINLP) problem through a DC model and is solved using a specialized genetic algorithm. This algorithm is also used to determine the optimal placement of SCC devices and storage systems in expansion planning. The proposed methodology is then used to perform a comparison of the effect of the different technologies on the robustness and cost of the final solution of the TEP problem. Three test systems were used to perform the comparative analyses, namely the Garver system, the IEEE-24 system, and a real-world Colombian power system of 93 buses. The results indicate that energy storage and SCC devices lead to a decrease in transmission requirements and overall investment, enabling the effective integration of wind farms.
This paper presents the preliminary results of studies aiming to use a battery energy storage system (BESS) in the Brazilian transmission system. The main objective of the BESS is to solve congestion problems caused mainly by the large increase in variable renewable generation in certain system areas. The studies were conducted based on actual forecasted system scenarios using a full representation of the electric grid available from the Brazilian system operator data base. In this work, only the steady-state modeling was considered as this may be the first stage in the assessment of a new technology. A qualitative economic comparison of the BESS application with other possible solutions to the congestion problems is also included.
3 April 2024 in Journal of Electrical Engineering & Technology
This paper presents a modeling and solution approach to the static and multistage transmission network expansion planning problem considering series capacitive compensation and active power losses. The transmission network expansion planning is formulated as a mixed integer nonlinear programming problem and solved through a highly efficient genetic algorithm. Furthermore, the Villasana Garver’s constructive heuristic algorithm is implemented to render the configurations of the genetic algorithm feasible. The installation of series capacitive compensation devices is carried out with the aim of modifying the reactance of the original circuit. The linearization of active power losses is done through piecewise linear functions. The proposed model was implemented in C++ language programming. To show the applicability and effectiveness of the proposed methodology several tests are performed on the 6-bus Garver system, the IEEE 24-bus test system, and the South Brazilian 46-bus test system, presenting costs reductions in their multi-stage expansion planning of 7.4%, 4.65% and 1.74%, respectively.
The growing penetration of centralized and distributed solar photovoltaic (PV) generation has introduced significant operational challenges in power systems, most notably the “duck curve” phenomenon, which is characterized by steep net load ramp-up at dusk. This issue has become increasingly evident worldwide, including in Brazil, where solar PV capacity is expanding rapidly. In this context, this paper proposes optimization-based strategies for dispatching Battery Energy Storage Systems (BESS) to smooth the duck curve, using real data from the state of Minas Gerais, Brazil. Three distinct optimization objectives are investigated: load derivative compensation, variable generation compensation, and average load tracking. Energetic and electric analyses were performed using the real data. For the evaluated Minas Gerais case study, both analyses indicate that the BESS operation based on load derivative compensation provides the most effective reduction in load ramps among the three strategies investigated.