Eduardo Caro

Dr. Eduardo Caro

Universidad Politécnica de Madrid
orcid

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 September 2009 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
Eduardo CaroEduardo Caro
Eduardo Caro
ACAntonio J Conejo
Antonio J Conejo
RMRoberto Mínguez
Roberto Mínguez
State estimation measurements within a substation are routinely considered Gaussian and independent. In this paper, the questionable independence assumption is dropped and a statistical procedure is proposed to estimate the measurement variance-covariance matrix. The well-known weighted least squares technique for estimation is then modified to take into account measurement dependencies. Two case studies are analyzed and conclusions duly drawn.

14 July 2011 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
Hrvoje PandzicHrvoje Pandzic
Hrvoje Pandzic
ACAntonio J Conejo
Antonio J Conejo
Igor KuzleIgor Kuzle
Igor Kuzle
Eduardo CaroEduardo Caro
Eduardo Caro
Within a yearly horizon, a transmission system operator needs to schedule the maintenance outages of the set of transmission lines due for maintenance. Facing this task, two conflicting objectives arise: on one hand, the transmission system adequacy should be preserved as much as possible, and, on the other hand, market operation should be altered in the least possible manner. To address this scheduling problem, a bilevel model is proposed whose upper-level problem schedules line maintenance outages pursuing maximum transmission capacity margin. This upper-level problem is constrained by a set of lower-level problems that represent the clearing of the market for all the time periods considered within the yearly planning horizon. This bilevel model is conveniently converted into a nonlinear mathematical program with equilibrium constraints (MPEC) that can be recast as a mixed-integer linear programming problem solvable with currently available branch-and-cut techniques.

20 June 2011 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
Eduardo CaroEduardo Caro
Eduardo Caro
ACAntonio J Conejo
Antonio J Conejo
RMRoberto Mínguez
Roberto Mínguez
This paper proposes a decentralized state-estimation approach that relies on an elaborated instance of the Lagrangian relaxation decomposition technique. The proposed algorithm does not require a central coordinator but just to moderate interchanges of information among neighboring regions, and exploits the structure of the problem to achieve a fast and accurate convergence. Additionally, a decentralized bad measurement identification procedure is developed, which is efficient and robust in terms of identifying bad measurements within regions and in border tie-lines. The accuracy and efficiency of the proposed procedures are assessed by a large number of simulations, which allows drawing statistically sound conclusions.

9 June 2011 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
Eduardo CaroEduardo Caro
Eduardo Caro
ACAntonio J Conejo
Antonio J Conejo
RMRoberto Mínguez
Roberto Mínguez
MZMarija Zima
Marija Zima
GAGöran Andersson
Göran Andersson
This paper analyzes the multiple bad data originated by a gross error in any voltage or current transformer of the measurement equipment. Considering the statistical correlations among measurements, an identification algorithm based on the largest normalized residual test is specifically designed to deal with multiple bad data. Two case studies are analyzed and conclusions duly drawn.

8 December 2009 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
Eduardo CaroEduardo Caro
Eduardo Caro
ACAntonio J Conejo
Antonio J Conejo
AAAli Abur
Ali Abur
This paper presents a procedure to identify the on/off statuses of breakers at substations throughout a power network. It is intended as a structural data preprocessor prior to running a state estimator. The procedure relies on a dc model of power lines and busbars, and requires the solution of a well-behaved mixed-integer quadratic programming problem. The proposed procedure is illustrated using a simple example and a realistic case study.

6 June 2012 in IET Generation, Transmission & Distribution
Verified
Journal Article
Closed access
Eduardo CaroEduardo Caro
Eduardo Caro
ACAntonio J Conejo
Antonio J Conejo
Although the weighted least of squares technique is an efficient and well-established power system state-estimation procedure, a number of alternative estimation approaches have been proposed in the technical literature. This study presents and compares the most-common estimators formulating them as mathematical programming problems. The numerical accuracy and computational efficiency of the different estimators are analysed using an illustrative case study.