Evelyn AiLin TEO

Prof. Evelyn AiLin TEO

Research Director

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2018 in Journal of Management in Engineering
Verified
Journal Article
Closed access
LLLonghui Liao
Longhui Liao
Evelyn AiLin TEOEvelyn AiLin TEO
Evelyn AiLin TEO
People management has been recognized as key to implementing building information modeling (BIM). This study aimed to identify the critical factors hindering and driving BIM implementation in terms of people management, present the theoretical rationale behind these factors using a proposed organizational change framework, and provide strategies to enhance BIM implementation. Twenty-four hindrances to and 13 drivers for BIM implementation in people management were identified from the literature review. The results from a questionnaire survey of 84 experts in Singapore and postsurvey interviews revealed that 22 hindrances and 12 drivers were deemed critical and could be interpreted by 13 organizational change attributes in terms of interenterprise structure, corporate culture, and individuals and roles in a building project context. People management strategies are proposed to address the critical hindrances grouped into fragmentation and inertia, unestablished contractual foundation, poor knowledge and resistance to change, and unfavorable risk attitudes, which will help practitioners identify specific adjustments to their implementation activities.

8 December 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
Michael Yit Lin CHEWMichael Yit Lin CHEW
Michael Yit Lin CHEW
Evelyn AiLin TEOEvelyn AiLin TEO
Evelyn AiLin TEO
Kwok Wei ShahKwok Wei Shah
Kwok Wei Shah
Vishal KumarVishal Kumar
Vishal Kumar
Ghasan HuseienGhasan Huseien
Ghasan Huseien
The concepts of smart building (SB) and smart facilities management (SFM) are crucial as they aim to uplift occupants’ living standards through information and communication technology. However, the current network possesses several challenges to SFM, due to low bandwidth, high latency, and inability to connect a high amount of IoT (Internet of things) devices. 5G technology promises high-class network services with low latency, high bandwidth, and network slicing to achieve real-time efficiency. Moreover, 5G promises a more sustainable future as it will play a crucial role in reducing energy consumption and shaping future applications to achieve higher sustainability goals. This paper discusses the current challenges and benefits of implementing 5G in various use cases in SFM applications. Furthermore, this paper highlights the Singapore government rollout plan for 5G implementation and discusses the roadmap of SFM use case development initiatives undertaken by 5G Advanced BIM Lab (Department of Building, National University of Singapore) in alignment with the 5G implementation plan of Singapore. Under these 5G SFM projects, the lab seeks to develop state-of-the-art 5G use cases in collaboration with various industry partners and developed a framework for teaching and training to enhance students’ learning motivation and help mid-career professionals to upskill and upgrade themselves to reap multiple benefits using the 5G network. This article will serve as a benchmark for researchers and industries for future progress and development of SFM systems by leveraging 5G networks for higher sustainability targets and implementing teaching and learning programs to achieve greater organizational excellence.

1 May 2012 in Journal of Computing in Civil Engineering
Verified
Journal Article
Closed access
HLHyun-Soo Lee
Hyun-Soo Lee
HKHyunsoo Kim
Hyunsoo Kim
종이종직 이
종직 이
Evelyn AiLin TEOEvelyn AiLin TEO
Evelyn AiLin TEO
KLKwang-Pyo Lee
Kwang-Pyo Lee
Many work-related risk factors can cause accidents on construction sites. Considering the varied characteristics of these sites, risks within the same type of work can differ. Furthermore, the established safety management performed in other industries does not necessarily apply to construction. To suggest an assessment system considering risk influence factors on construction sites, this study examines the factors through literature reviews and surveys, and builds a weighting system for their classification. The risks for each type of work are estimated based on their frequency and severity. With the understanding that perceiving a specific type of risk on a construction site increases the effectiveness of safety management, the study suggests an assessment system integrating associated risks and risk influence factors. A risk assessment system is proposed that considers influence factors and addresses the characteristics of construction sites. The system is intended for use with regard to the safety of construction workers.

20 November 2017 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
Evelyn AiLin TEOEvelyn AiLin TEO
Evelyn AiLin TEO
GOGeorge Ofori
George Ofori
ITImelda Tjandra
Imelda Tjandra
HKHanjoon Kim
Hanjoon Kim
Purpose: Despite recognition of its importance to Singapore’s economy, the construction industry is plagued by poor safety and productivity performance. Improvement efforts by the government and industry have yielded little results. The purpose of this paper is to propose a framework for developing a productivity and safety monitoring system using Building Information Modelling (BIM). Design/methodology/approach: The framework, Intelligent Productivity and Safety System (IPASS), takes advantage of mandatory requirements for building plans to be submitted for approval in Singapore in BIM format. IPASS is based on a study comprising interviews and a questionnaire-based survey. It uses BIM to integrate buildable design, prevention and control of hazards, and safety assessment. Findings: The authors illustrate a development of IPASS capable of generating productivity and safety scores for construction projects by analysing BIM model information. Research limitations/implications: The paper demonstrates that BIM can be used to monitor productivity and safety as a project progresses, and help to enhance performance under the two parameters. Practical implications: IPASS enables collaboration among project stakeholders as they can base their work on analysis of productivity and safety performance before projects start, and as they progress. It is suggested that the BIM model submitted to the authorities should be used for the IPASS application. Originality/value: IPASS has rule-checking, hazards identification and quality checking capabilities. It is able to identify hazards and risks with the rule-checking capabilities. IPASS enables practitioners to check mistakes and the rationality of a design. It helps to mitigate risks as there are built-in safety measures/controls rules to overcome the problems caused by design deficiency, wrong-material-choice, and more.

1 August 2007 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
Evelyn AiLin TEOEvelyn AiLin TEO
Evelyn AiLin TEO
SCSwee Lean Chan
Swee Lean Chan
PTPeh Hua Tan
Peh Hua Tan
The Singapore government is encouraging construction enterprises to venture abroad for exporting their services and become global players since the local construction pie is shrinking and the global market is growing. The Building and Construction Authority of Singapore has revamped the contractors registration system with the hope of bringing about merger and acquisition of companies for improving the local contractors’ standing in the global construction scene. To diversify into new markets in a new environment, which is very different from local environment, requires diversification vis-à-vis exporting strategy. This study examines the attitudes and views of contractors, operating in Singapore (excluding foreign contractors), on how the strategic move should be focused for diversification vis-à-vis exporting services. The aim of this study is to establish the survival skills necessary for Singapore’s construction small and medium sized enterprises (SMEs) to venture abroad. A postal questionnaire survey...

12 September 2019 in Applied Sciences
Verified
Journal Article
Open access
PDF file
LLLonghui Liao
Longhui Liao
Evelyn AiLin TEOEvelyn AiLin TEO
Evelyn AiLin TEO
CRChang Ruidong
Chang Ruidong
The Singaporean government has made building information modeling (BIM) implementation mandatory in new building projects with gross floor areas over 5000 m2, but the implementation is still plagued with hindrances such as lacking project-wide collaboration. The purposes of this study are to identify critical factors hindering BIM implementation in Singapore’s construction industry, analyze their interrelationships, and identify strategies for reducing these hindrances. The results from a survey of 87 experts and five post-survey interviews in the Singaporean construction industry identified 21 critical hindrances, among which “need for all key stakeholders to be on board to exchange information” was ranked top. These hindrances were categorized into lack of collaboration and model integration (LCMI), lack of continuous involvement and capabilities (LCIC), and lack of executive vision and training (LEVT). LEVT and LCIC contributed to LCMI; LEVT caused LCIC. The proposed framework implying the key hindrances and their corresponding managerial strategies can help practitioners identify specific adjustments to their BIM implementation activities, which enables to efficiently achieve enhanced BIM implementation. The hindrances identified in this study facilitate overseas BIM implementers to customize their own lists of hindrances.