This study aims to analyze a renewable proton exchange membrane PEM fuel cell system, by dividing it into four subsystems (PEM fuel cells as the main power source, PEM electrolyser as hydrogen producer, photovoltaic modules as the renewable source that supplies the electrolyser, and hydrogen tank). Then, a mathematical model of each subsystem is simulated in MATLAB to get the operational curves, which are used to design a 1kW fuel cell system starting with calculating the amount of hydrogen needed by the fuel cells to work continuously, then the size of the water electrolyser used to produce this hydrogen, and the energy needed for electrolysis process. Then, estimating the enough power of the PV modules to provide this energy, according to the solar irradiance in Damascus city, and finally determine the size of hydrogen tank used to store the extra necessary hydrogen to keep fuel cells supply uninterrupted power among the whole year
Electricity consumption of data centers increases continuously. Beside of the IT industry which tries to reduce this consumption by improving efficiency of components in data centers, there are research solutions based on an optimized energy management of data centers by acting on the IT load placement, then on cooling, start-up and shut down. In this context, this paper focus on energetic modeling of servers in data centers. In the state of art, the IT load is usually presented as a whole unit by means of the percentage CPU, while in this work, the percentage CPU is separated in two parts. The first one is the percentage CPU due to server self applications (for example a virtual machine manager), while the second part is due to services turning on the server. This classification led to a new linear model which shows that electricity consumption of data centers can be modeled as accumulated layers depending on what kind of software is running on the servers. The model is developed and then validated with experimental measurements on actual server conduct with the help of industrial partners. This modeling presents the first step of further works aim to optimize the energy consumption of data centers by knowing the IT load that is held on its servers.
Building Energy Management Systems (BEMS) have been developed in order to improve dwelling energy efficiency, which is seen as a compromise between energy cost and overall comfort. A BEMS optimize the control of energy supply and demand according to forecasting data. This paper proposes new BEMS strategies to support Demand Side Management and validate them using a real time platform: A Power-Hardware-In the-Loop (PHIL) test bench. Physical devices are introduced into the simulated system to check whether they can support the control strategies.
In this paper, a shedding light on the energy status in Syria before, during and after the war, a case statement of Syria’s previous and current production of oil and gas, which are the main sources of fuel for power plants in Syria is presented, in the previous decades, Syria used to cover its need of oil and gas, and export the surplus. Electricity is one of the major consumers of primary energy. Since 2011, the electricity sector has been facing serious challenges including the difficulties in providing the fuel necessary to operate power plants and acts of sabotage and looting for various components of the electrical network, which affected the electricity generation as it decreased more than 60% during the war. On the other hand, Syria enjoys abundant renewable resources due to its geographical location, where the number of sunny hours is between 2830 to 3280 annually and the effective wind potential that can be exploited reaches up to 7000 MW, which is nearly equals to the installed capacity of the conventional power plants that used to meet the demand before the war. Later in this paper, a study was presented to the savings achieved by the use of renewable energies in meeting the expected energy deficit in coming years, which is practically the period of rebuilding Syria, as it shows a considerable savings of about 1.8 billion dollars annually, which helps along with implementing smart grid techniques in rehabilitating the electricity network and achieving the plan of the Syrian Ministry of Electricity regarding renewable energies strategy until 2030.
4 May 2012 in COMPEL - The international journal for computation and mathematics in electrical and electronic engineering
Purpose: The purpose of this paper is to introduce a problematic phenomenon that can occur when managing multi electrical sources systems by optimization.Design/methodology/approach: The energy management problem is formulated as a linear optimisation problem. Two approaches are developed and applied to detect the possible existence of equivalents solutions. The first is based on Dulmage‐Mendelsohn (DM) decomposition. With this method the structure of the optimisation problem is analysed. The second approach is a numeric approach; the detection of equivalents solutions is made by the formulation of new optimisation problem and the objective function of this problem is to maximise the distance between two equivalents solutions.Findings: The numeric approach is more efficient than the structural approach. In some cases, applying DM decomposition may not be sufficient to detect the risk of W effect. This is because DM decomposition does not take the value of variable's coefficient into consideration, which is important to determine the degrees of freedom in the set of variables.Originality/value: Multi sources systems are widely used, especially in buildings where renewable energies have good potential application. The linear formulation of the management problem may induce an existence of equivalent command strategies. The detection approach presented in this paper shows that some solutions are better than others from an applicabability point of view. They will not exhaust rapidly the storage system. This approach can be implemented in virtual sources plant to avoid solutions with this so‐called W effect.
This paper presents an energy management system EMS controlling household energy capable both to satisfy the maximum available electrical energy constraint and to maximize user comfort criteria. It is composed into three layers: anticipation, reactive and device layers. Actually, this household energy control system is based on simple models. To validate them, we modeled the building more finely using MATLAB/Simulink. The validation is obtained through a real time simulation platform “RT_LAB” capable of interoperating with EMS. At the end of this paper, some results of optimization of energy are presented.