Hao Li

Dr. Hao Li

orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 December 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
LGliang ge
liang ge
ZFZiyang Fang
Ziyang Fang
HLHao Li
Hao Li
LZLe Zhang
Le Zhang
Wen ZengWen Zeng
Wen Zeng
XXXiaoting Xiao
Xiaoting Xiao
China is rich in coal resources, but complex hydrogeological conditions lead to difficulties in coal mining, including coal mine collapses, roof and water damage, and other accidents that occur frequently, resulting in many casualties and property losses. The use of coal mine hole detection technology to detect and analyze the internal environment of the coal mines in advance helps to reduce safety hazards and prevent coal mine accidents; however, the operation of existing coal mine hole detection technology is cumbersome, difficult to control, and encounters problems due to an insufficient depth of jacking. This paper designs a new type of small robot for mine hole detection. Firstly, we analyzed the function and structural design of the mine hole detection robot, designed a variable diameter function according to the characteristics of narrow and uneven mine holes in coal mines, and analyzed the mechanics of the critical parts using theoretical calculations. Secondly, using three-dimensional modeling software (Solidworks 2019), we established a structural model of the small robot for mine hole detection. After that, we designed a hardware circuit and control program for the robot and emphasized the safety design of the circuit, considering the presence of water and gas inside the coal mine. Finally, to verify the feasibility of the design program, the basic parameters and function tests of the mine hole-detection small robot were carried out. The experimental results show that the developed mine hole-detection small robot can adapt to working hole diameters from 65 mm to 100 mm and has a maximum working power of only 12 W and a maximum crawling speed of 3.96 m/min. The maximum crawling slope reaches 90°, which can meet existing mine hole inspection needs. This research provides theoretical and design guidance for developing mine hole-detection robots with substantial engineering practical reference values.

24 October 2023 in Preprints.org
Verified
Preprint
Open access
PDF file
LGliang ge
liang ge
ZFZiyang Fang
Ziyang Fang
HLHao Li
Hao Li
LZLe Zhang
Le Zhang
Wen ZengWen Zeng
Wen Zeng
XXXiaoting Xiao
Xiaoting Xiao
China is rich in coal resources, but the complex hydrogeological conditions lead to difficulties in coal mining, such as coal mine collapse, roof and water damage, and other accidents that occur frequently, resulting in many casualties and property losses. The use of coal mine hole detection technology to detect and analyze the internal environment of the coal mine in advance helps to reduce safety hazards and prevent coal mine accidents, for the existing coal mine hole detection technology operation is cumbersome, not easy to control, and insufficient depth of jacking prob-lems, this paper designs a new type of mine hole detection small robot. Firstly, this paper ana-lyzes the function and structural design of the mine hole detection robot, designs the variable diameter function according to the characteristics of narrow and uneven mine holes in coal mines, and analyzes the mechanics of the critical parts through theoretical calculations; secondly, based on the three-dimensional modeling software, established the structural model of the small robot for mine hole detection; after that, designed the robot's hardware circuits and control pro-grams for the presence of water and gas inside the mine hole, highlighting the need to carry out a new type of mine hole detection small robot. After that, we designed the robot's hardware circuit and control program, giving particular emphasis to the safety design of the circuit for the pres-ence of water and gas inside the mine hole of the coal mine. Finally, to verify the feasibility of the design program, the basic parameters and function tests of the mine hole detection small robot are carried out. The experimental results show that the mine hole inspection small robot realized by this design can adapt to the working hole diameter from 65 mm to 100 mm, the maximum working power is only 12 W, and the maximum crawling speed is 3.96 m/min. The maximum crawling slope reaches 90°, which can meet the actual mine hole inspection needs. The research can provide theoretical and design guidance for developing the mine hole detection robot with substantial engineering practical reference value.

27 February 2026 in Geosciences
Verified
Journal Article
Open access
PDF file
HLHao Li
Hao Li
YWYanqing Wu
Yanqing Wu
LDLiang Du
Liang Du
When examining ground-penetrating radar (GPR)-based advanced detection ahead of the tunnel face for tunnel constructions, existing numerical forward simulations have not effectively accounted for the actual orientation of the strata and the conditions, limiting their theoretical guidance. In this study, we classify tunnel boring through strata attitudes into horizontal, vertical, positively inclined, reverse inclined, and other anomalous structures. We also consider tunnel faces with different planarity (perfectly smooth or irregular). Using the finite-difference time-domain method with a generalized perfectly matched layer, we simulated 21 forward models for GPR-based advanced detection ahead of the tunnel face. The comparative simulation results indicate that the superposition of reflections from different directions at irregular tunnel faces, lithological interfaces, complicated numerical forward models of typical target geological bodies, making it difficult to distinguish the reflection signals of target geological bodies, and the signal strength in numerical forward modeling profiles with antenna touch with tunnel face is significantly stronger than those without such touch. The flatness of the tunnel face and the close proximity between the antenna and tunnel face are the keys to obtain high-quality original data. These research findings will contribute to improving instruments, data processing, and geologic interpretation in future.

15 June 2022 in Energies
Verified
Journal Article
Open access
PDF file
LGliang ge
liang ge
LZLe Zhang
Le Zhang
HLHao Li
Hao Li
XXXiaoting Xiao
Xiaoting Xiao
YHYang He
Yang He
CYCaixia Yang
Caixia Yang
With the continuous improvement of automatization of underground oil and gas resources exploitation, more and more instructions are required for the control technology while drilling in complex processes. The conventional downlink communication technology has shortcomings, such as data transmission lag and high bit error rate, which cannot meet the actual needs. Therefore, developing a new high-speed and low bit error rate (BER) downlink communication technology is very important. In this study, a new type of downlink communication system based on the electric current field is designed. Firstly, based on the theory of electromagnetic field and electromagnetic wave, the current distribution model of the drill string is established. Then, the magnetic field distribution model of the drill string is deduced according to the research on the static electromagnetic field and boundary problems. Finally, the ground simulation experiment platform of the downlink communication system is built and tested. The experimental results show that the BER is only 1.02% when the data transmission rate is 1 kbps. To further reduce the BER of the system, the influence factors of information transmission such as different transmitting voltage, inter-electrode distances, and working temperature are tested and analyzed, respectively, which provides ideas for optimizing the technology of downlink information communication while drilling.

10 November 2023 in Research Square
Verified
Preprint
Open access
PDF file
LDLiang Du
Liang Du
WZwenjin zhu
wenjin zhu
LWLei Wang
Lei Wang
HLHao Li
Hao Li
XJXiaoyu Jiao
Xiaoyu Jiao
TQTeng Qin
Teng Qin
Roof water inrush in coal mining is a significant type of water-related disaster, usually resulting from the interconnection of water-bearing geological formations formed by cracks during and after working face mining. Therefore, monitoring the roof water infiltration is of paramount importance in preventing or mitigating water inrush incidents in the working face. This study employs the borehole resistivity tomography imaging method to conduct physical experiments for water seepage monitoring in the roof cracks generated during coal model mining. Additionally, roof monitoring was performed in the 7130 working face of Qidong Coal Mine. The results of both physical experiments and field tests demonstrate that borehole resistivity tomography is well-suited for monitoring water infiltration in the roof of the working face, enabling determination of the temporal and spatial distribution of water seepage. By analyzing the variation patterns of low-resistivity anomalies in the resistivity profile, the water-bearing zones can be delineated, and the water-conducting channels and water outflow points can be identified. Furthermore, by combining the size of the water-bearing zones, a qualitative assessment of the water content can be achieved.