The main purpose of this paper is to investigate the contributions of building-integrated photovoltaic (BIPV) systems to the notion of nearly zero-energy cities in the capitals of the European Union member states (EU), Norway, and Switzerland. Moreover, an in-depth investigation of the barriers and challenges ahead of the widespread rollout of BIPV technology is undertaken. This study investigates the scalability of the nearly zero-energy concept using BIPV technology in moving from individual buildings to entire cities. This study provide a metric for architects and urban planners that can be used to assess how much of the energy consumed by buildings in Europe could be supplied by BIPV systems when installed as building envelope materials on the outer skins of buildings. The results illustrate that by 2030, when buildings in the EU become more energy-efficient and the efficiency of BIPV systems will have improved considerably, BIPV envelope materials will be a reasonable option for building skins and will help in achieving nearly zero-energy cities. This study reveals that in the EU, taking a building skin to building net surface area ratio of 0.78 and a building skin glazing ratio of 30%, buildings could cover their electricity consumption using BIPV systems by 2030. Eighteen challenges and barriers to the extensive rollout of BIPV systems are recognised, classified, and discussed in this study in detail. The challenges are categorised into five stages, namely the decision, design, implementation, operation and maintenance, and end of life challenges.
Building integrated photovoltaics is one of the key technologies when it comes to electricity generation in buildings, districts or urban areas. However, the potential of building façades for the BIPV system, especially in urban areas, is often neglected. Façade-mounted building integrated photovoltaics could contribute to supply the energy demand of buildings in dense urban areas with economic feasibility where the availability of suitable rooftop areas is low. This paper deals with the levelised cost of electricity (LCOE) of building integrated photovoltaic systems (BIPV) in the capitals of all the European member state countries plus Norway and Switzerland and presents a metric to investigate a proper subsidy or incentive for BIPV systems. The results showed that the average LCOE of the BIPV system as a building envelope material for the entire outer skin of buildings in Europe is equal to 0.09 Euro per kWh if its role as the power generator is considered in the economic calculations. This value will be 0.15 Euro per kWh if the cost corresponding to its double function in the building is taken into the economic analysis (while the average electricity price is 0.18 Euro per kWh). The results indicate that the BIPV generation cost in most case studies has already reached grid parity. Furthermore, the analysis reveals that on average in Europe, the BIPV system does not need a feed-in tariff if the selling price to the grid is equal to the purchasing price from the grid. Various incentive plans based on the buying/selling price of electricity from/to the main grid together with LCOE of the BIPV systems is also investigated.
26 September 2016 in IEEE Transactions on Power Systems
The increasing limitations on available energy requires use of new environmentally-friendly resources and enhancement of utilization efficiency of available resources. Energy storage systems (ESSs) are a promising technology to realize such a goal; however, their application in networks requires an investment that must be economically justified. This study examined the effect of ESS use on energy generation costs in networks for a specific time period. This includes determining the best location for installation of the ESS and the best possible operation schedules for the ESS and power plants to achieve the greatest decrease in daily energy generation costs. The influences of all the factors affecting the final solution were studied under different scenarios. The effects of power plant cost functions, transmission line capacity, and network upgrades were compared. All scenarios were implemented in a IEEE standard 30-bus network. The best possible specifications of ESS can reduce daily energy generation cost by 3% for selected power plant cost functions. It was found that the use of ESS in a network uniformed stress on the transmission line and, in such a case, it would be possible to defer the network upgrade for 21 years.