Ieda Geriberto Hidalgo

Prof. Dr. Ieda Geriberto Hidalgo

Universidade Estadual de Campinas, Campinas, São Paulo, Brazil
orcid

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2018 in Forest Policy and Economics
Verified
Journal Article
Closed access
FRFabrícia Gladys F.S. Rossato
Fabrícia Gladys F.S. Rossato
ASAndres Susaeta
Andres Susaeta
Damian AdamsDamian Adams
Damian Adams
IHIeda Geriberto Hidalgo
Ieda Geriberto Hidalgo
TAThais Duekc de Araujo
Thais Duekc de Araujo
AQAdriane Queiroz
Adriane Queiroz

1 January 2014 in Journal of Water Resources Planning and Management
Verified
Journal Article
Closed access
IHIeda Geriberto Hidalgo
Ieda Geriberto Hidalgo
DFDarrell G. Fontane
Darrell G. Fontane
JLJoão E. G. Lopes
João E. G. Lopes
JAJosé G. P. Andrade
José G. P. Andrade
AAAndré F. de Angelis
André F. de Angelis
This paper presents a methodology for obtaining and adjusting of efficiency curves for hydroelectric generating units. It is based on measured data of power, gross head, and water discharge recorded by the company that manages the plant operation. The objective is to determine the actual performance characteristics of the set: turbine, generator, and penstock. In order to obtain the efficiency functions, an iterative calculation is used. Its input data are the functions currently in use of turbine efficiency, generator efficiency, and penstock head losses. For the adjustment of the efficiency functions, the Generalized Reduced Gradient optimization method is employed. A case study was applied to the data from a large Brazilian hydroelectric plant whose operation is under the coordination of the Electric System National Operator. The benefits of the proposed methodology are analyzed using a simulation tool for the hydroelectric operation. The simulator is used to reproduce the past operation of the...

1 March 2015 in Journal of Water Resources Planning and Management
Verified
Journal Article
Closed access
IHIeda Geriberto Hidalgo
Ieda Geriberto Hidalgo
PCPaulo B. Correia
Paulo B. Correia
FAFrancisco Arnold
Francisco Arnold
JEJoão Paulo F. Estrócio
João Paulo F. Estrócio
RBRegiane S. de Barros
Regiane S. de Barros
WYWilliam W.-G. Yeh
William W.-G. Yeh

1 September 2010 in Journal of Energy Engineering
Verified
Journal Article
Closed access
IHIeda Geriberto Hidalgo
Ieda Geriberto Hidalgo
DFDarrell G. Fontane
Darrell G. Fontane
SFSecundino Soares F.
Secundino Soares F.
MCMarcelo A. Cicogna
Marcelo A. Cicogna
JLJoão E. G. Lopes
João E. G. Lopes
This paper presents a sequence of procedures for data analysis and correction from hydroelectric plants. The procedures are based on variable data recorded by the plant. Therefore, they do not require additional financial investment in instrumentation for measurements. The proposed methodology makes use of a data manager, a queries builder, a generator of the overall efficiency function and an electronic spreadsheet. It has been applied to the data from a large Brazilian hydroelectric plant whose operation is under the coordination of the Electric System National Operator (ONS). The benefits of the data correction are analyzed using a simulator of the hydroelectric plants operation. This simulator is used to reproduce the past operation of the plant, once with official data and the next with adjusted data. The results show significant improvements in terms of quality of the data, contributing to the efficiency and reliability of the computational models in use by the energy sector in the operation planning.

1 December 2012 in Journal of Energy Engineering
Verified
Journal Article
Closed access
IHIeda Geriberto Hidalgo
Ieda Geriberto Hidalgo
DFDarrell G. Fontane
Darrell G. Fontane
MAMazdak Arabi
Mazdak Arabi
JLJoão E. G. Lopes
João E. G. Lopes
JAJosé G. P. Andrade
José G. P. Andrade
LRLubienska C. L. J. Ribeiro
Lubienska C. L. J. Ribeiro
The power generated by a hydroelectric plant depends on the penstock head loss, the turbine efficiency, and the generator efficiency among other factors. Initially, the functions related to these variables are provided by the equipment manufacturer; however, over time they change as the plant ages. This paper presents a methodology to adjust an efficiency function for each generating unit based on measured data. It is applied using two optimization methods: the generalized reduced gradient and the evolutionary algorithm. A case study with data from a large Brazilian hydroelectric plant demonstrates how the methodology can be employed and compares the performance of the optimization tools. A comparison metric is used to show that the optimal unit efficiency function significantly improves the performance of simulation models to reproduce observed data and better describe the actual operation of the hydroelectric plant.

15 July 2024 in Renewable Energy
Verified
Journal Article
Closed access
JMJorge Daniel Páez Mendieta
Jorge Daniel Páez Mendieta
IHIeda Geriberto Hidalgo
Ieda Geriberto Hidalgo
FCFrancesco Cioffi
Francesco Cioffi