IFTEKHARUZZAMAN IFTEKHARUZZAMAN

IFTEKHARUZZAMAN IFTEKHARUZZAMAN

American International University-Bangladesh, Dhaka, Bangladesh
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 November 2022 in Solar
Verified
Journal Article
Open access
PDF file
Mohammad Nur E AlamMohammad Nur E Alam
Mohammad Nur E Alam
Mohammad Khairul BasherMohammad Khairul Basher
Mohammad Khairul Basher
IFTEKHARUZZAMAN IFTEKHARUZZAMANIFTEKHARUZZAMAN IFTEKHARUZZAMAN
IFTEKHARUZZAMAN IFTEKHARUZZAMAN
Kazi Zehad MostofaKazi Zehad Mostofa
Kazi Zehad Mostofa
Mohammad Aminul IslamMohammad Aminul Islam
Mohammad Aminul Islam
Narottam DasNarottam Das
Narottam Das
The electricity crisis is a common issue in Bangladesh; however, recently the electricity scenario has been getting worse due to various reasons including power generation and distribution all over the country. Meanwhile, the large number of people requires a huge amount of energy which is not possible to be met by the national grid due to the limited power generation from different plants. Among all renewable energy sources, the solar photovoltaics (PV) system is the best choice as a generation source, either off-grid or with a grid-tied connection, to reduce the pressure on the national grid. In Bangladesh, there are more than 175,000 schools, and it is possible to generate a huge amount of renewable (solar) power to supply all the schools by using rooftop PV systems. We propose a new approach that combines solar energy harvesting and savings to make the schools self-sufficient and energywise. We performed a Hybrid Optimization Model for Multiple Energy Resources (HOMER) pro simulation and find that it was possible to generate approximately 200 megawatts (MW) of power. We conducted a feasibility study on generating power from rooftop PV systems on school buildings and reduced the power consumption using retrofitted thin-film-coated glass by around 16–20% per day depending on the school size, which can help the national power grid system by either making all the schools off-grid or grid-connected to supply power to the national grid. In addition, we perform a HelioScope simulation to investigate the maximum upscaling of PV sizing for the rooftops of school buildings in Bangladesh to realize how to make each school a mini solar power station in the future. The HelioScope simulation performance showed that it was possible to generate approximately 96,993 kWh per year from one school building.

4 January 2023 in Future Transportation
Verified
Journal Article
Open access
PDF file
IFTEKHARUZZAMAN IFTEKHARUZZAMANIFTEKHARUZZAMAN IFTEKHARUZZAMAN
IFTEKHARUZZAMAN IFTEKHARUZZAMAN
SGSusmita Ghosh
Susmita Ghosh
Mohammad Khairul BasherMohammad Khairul Basher
Mohammad Khairul Basher
Mohammad Aminul IslamMohammad Aminul Islam
Mohammad Aminul Islam
Narottam DasNarottam Das
Narottam Das
Mohammad Nur E AlamMohammad Nur E Alam
Mohammad Nur E Alam
Bangladesh’s railway system mostly uses typical manual railway crossing techniques or boom gates through its 2955.53 km rail route all over the country. Accidents frequently happen at railway crossings due to the lack of quickly operating gate systems, and to fewer safety measures at the railway crossing as well. Currently, there are very few automatic railway crossing systems available (without obstacle detectors). Additionally, all of them are dependent on the national power grid, without a backup plan for any emergency cases. Bangladesh is still running a bit behind in generating enough power for its consumption; hence, it is not possible to have a continuous power supply at all times all over the countryside. We aim to design and develop a smart railway crossing system with an obstacle detector to prevent common types of accidents at railway crossing points. We use two infrared (IR) sensors to operate the railway crossing systems, which are controlled by an Arduino Uno. This newly designed level crossing system is run with the help of sustainable renewable energy, which is cost-effective and eco-friendly, and applied under the national green energy policy towards achieving sustainable development in Bangladesh as a part of the global sustainable goal to face climate change challenges. We have summarized the simulated the results of several renewable energy sources, including a hybrid system, and optimized the Levelized Cost of Energy (LCOE) and the payback periods.

3 February 2022 in Preprints.org
Verified
Preprint
Open access
PDF file
IFTEKHARUZZAMAN IFTEKHARUZZAMANIFTEKHARUZZAMAN IFTEKHARUZZAMAN
IFTEKHARUZZAMAN IFTEKHARUZZAMAN
SGSusmita Ghosh
Susmita Ghosh
Mohammad Khairul BasherMohammad Khairul Basher
Mohammad Khairul Basher
Mohammad Aminul IslamMohammad Aminul Islam
Mohammad Aminul Islam
Narottam DasNarottam Das
Narottam Das
Mohammad Nur E AlamMohammad Nur E Alam
Mohammad Nur E Alam
Bangladesh's railway system mostly uses typical manual railway crossing technique or boom gates through its 2,955.53 km rail route all over the country. The accidents are frequently happening in the railway crossings due to not having obstacle detectable and quickly operating gate systems, and also for fewer safety measures in the railway crossing. Currently, there are very few automatic railway crossing systems (without obstacle detectors) available, however, all of them are dependent on the national power grid without a backup plan for any emergency cases. Bangladesh is still running a bit behind in the power generation of its consumption, hence it is not possible to have a continuous power supply at all times all over the countryside. We aim to design and develop a smart railway crossing system with an obstacle detector to prevent common types of accidents in the railway crossing points. We design to use two infrared (IR) sensors to operate the railway crossing systems which will be controlled by the Arduino Uno. This newly designed level crossing system will be run with the help of sustainable renewable energy which is cost-effective, eco-friendly, and apply under the national green energy policy towards achieving sustainable development in Bangladesh as a part of the global sustainable goal to face climate change challenges. We have summarized the simulated results of several renewable energy sources including a hybrid system and optimized the Levelized Cost of Energy (LCOE), and the payback periods.