Marvens Jean Pierre

Mr. Marvens Jean Pierre

orcid

Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 May 2026 in Electricity
Verified
Journal Article
Open access
PDF file
MPMarvens Jean Pierre
Marvens Jean Pierre
EHEmmanuel Hernández
Emmanuel Hernández
Oscar Alfredo Jaramillo-SalgadoOscar Alfredo Jaramillo-Salgado
Oscar Alfredo Jaramillo-Salgado
MMManuel Madrigal
Manuel Madrigal
RCReynaldo Iracheta Cortez
Reynaldo Iracheta Cortez
GRGregorio Martínez Reyes
Gregorio Martínez Reyes
This study examines the impact of increasing photovoltaic (PV) penetration on the transient stability of the IEEE 9-bus power system. Synchronous machines are modeled with standard subtransient dynamics, while PV units are represented as current-limited grid-following inverters. Transient stability is assessed through the Critical Clearing Time (CCT) and the post-fault dynamic behavior, obtained from time-domain simulations carried out in MATLAB/Simulink® R2023b. Two permanent three-phase faults are considered: a primary contingency on line 7–5 and a secondary contingency on line 9–6, introduced to assess the robustness of the observed trends across different fault locations. The results show an increase in CCT as PV generation progressively replaces the active power supplied by synchronous machines, whose inertia is therefore maintained: from 210 ms (0% PV) to 440 ms (25%)/1080 ms (40%) at bus 5, 410 ms (25%)/1130 ms (40%) and 290 ms (25%)/650 ms (40%) at buses 6 and 8, respectively, demonstrating that the penetration site is a key factor for system stability. For distributed penetration among the three buses, CCT values of 340 ms (25%) and 1020 ms (40%) highlight the significant influence of PV placement at bus 8. The fault on line 9–6 consistently yields higher CCT values across all scenarios, confirming the robustness of these trends independently of fault location. Although an overall increase in CCT was observed, higher PV penetration also led to more pronounced oscillations and operability issues after the fault. In particular, 75% of the penetration scenarios under the fault on line 9–6 do not meet the active power recovery requirements of IEEE 1547-2018 and IEEE 2800-2022, a result more severe than that observed for the fault on line 7–5. These results underscore that a higher CCT does not guarantee operational compliance, and that stability-oriented control strategies—such as grid-forming operation, fast active power support, and dynamic voltage control—remain essential. They also suggest that planning practices should favor interconnections electrically closer to the slack generator. Overall, a high PV penetration level—modifying only the operating point of synchronous machines—allows longer fault durations to be tolerated; however, appropriate siting of PV units and the adoption of advanced inverter controls could mitigate the observed oscillations and post-fault operability challenges.

12 December 2025 in Preprints.org
Verified
Preprint
Open access
PDF file
MPMarvens Jean Pierre
Marvens Jean Pierre
OROmar Rodríguez
Omar Rodríguez
EHEmmanuel Hernández
Emmanuel Hernández
Oscar Alfredo Jaramillo-SalgadoOscar Alfredo Jaramillo-Salgado
Oscar Alfredo Jaramillo-Salgado
This study examines the impact of increasing photovoltaic (PV) penetration on the transient stability of the IEEE 9-bus power system. Synchronous machines are modeled with standard subtransient dynamics, while PV units are represented as current-limited grid-following inverters. Transient stability is assessed through the Critical Clearing Time (CCT) and the post-fault dynamic behavior, obtained from time-domain simulations carried out in MATLAB/Simulink®. A permanent three-phase fault on line 7–5 is considered as the limiting contingency. The results show an increase in CCT as PV generation progressively replaces the active power supplied by synchronous machines, whose inertia is therefore maintained: from 210 ms (0% PV) to 440 ms (25%) / 1080 ms (40%) at bus 5, 410 ms (25%) / 1130 ms (40%) and 290 ms (25%) / 650 ms (40%) at buses 6 and 8, respectively, demonstrating that the injection site is a key factor for system stability. For distributed injection among the three buses, CCT values of 340 ms (25%) and 1020 ms (40%) highlight the significant influence of PV placement at bus 8. Although an overall increase in CCT was observed, higher PV penetration also led to more pronounced oscillations and operability issues after the fault. These results underscore the need for stability-oriented control strategies, such as grid-forming operation, fast active power support, and dynamic voltage control. They also suggest that planning practices should favor interconnections electrically closer to the slack generator. Overall, a high PV penetration level—modifying only the operating point of synchronous machines—allows longer fault durations to be tolerated; however, appropriate siting of PV units and the adoption of advanced inverter controls could mitigate the observed oscillations and post-fault operability challenges.