MEHRSHAD RADMEHR

Dr. MEHRSHAD RADMEHR

orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 April 2022 in Environmental Science and Pollution Research
Verified
Journal Article
Closed access
PDF file
MRMEHRSHAD RADMEHR
MEHRSHAD RADMEHR
Tomiwa AdebayoTomiwa Adebayo
Tomiwa Adebayo

15 August 2017 in Sustainability
Verified
Journal Article
Open access
PDF file
UEUgochukwu Kenechi Elinwa
Ugochukwu Kenechi Elinwa
MRMEHRSHAD RADMEHR
MEHRSHAD RADMEHR
JOJOHN EMMANUEL OGBEBA
JOHN EMMANUEL OGBEBA
The growth in population of North Cyprus, and the increasing demand for housing, are two important factors that are rapidly shaping the development of the island. To meet this housing demand, contractors are resorting to high-rise apartment buildings as a housing solution. The study was carried out to investigate the possibilities of integrating PV systems into apartment buildings. This is a novel approach in housing within the context of North Cyprus. With the use of building information modelling (BIM) software, the possibility of this approach was tested. The study considered several cost variables and the advantages of building integrated photovoltaic (BIPV) systems integrated into apartment buildings at the design stage of the buildings. The willingness to pay (WTP) for this technology was also tested using qualitative methods and an economic analysis was carried out to ascertain the viability and feasibility of this technology. This was in line with present government policies using the net metering system. The method of analysis was carried out using a model proposed for BIPV integration in apartment buildings. The results derived from the survey data suggest that consumers prefer a price lower than €4500 for a 3 kWp integration of solar power equipment to their apartments.

1 July 2014 in Energy Policy
Verified
Journal Article
Closed access
MRMEHRSHAD RADMEHR
MEHRSHAD RADMEHR
KWKen Willis
Ken Willis
UKUgo Elinwa Kenechi
Ugo Elinwa Kenechi

5 September 2022 in Environmental Science and Pollution Research
Verified
Journal Article
Closed access
PDF file
Tomiwa AdebayoTomiwa Adebayo
Tomiwa Adebayo
SASeyi Akadiri
Seyi Akadiri
MRMEHRSHAD RADMEHR
MEHRSHAD RADMEHR
Abraham Ayobamiji AwosusiAbraham Ayobamiji Awosusi
Abraham Ayobamiji Awosusi

30 June 2022 in Journal of Energy Systems
Verified
Journal Article
Open access
PDF file
NRNabaz Mohammedalı RASOOL
Nabaz Mohammedalı RASOOL
SASerkan Abbasoglu
Serkan Abbasoglu
MRMEHRSHAD RADMEHR
MEHRSHAD RADMEHR
As an effective means of providing power to remote and off-grid areas of developing countries, where rural electrification problems are most common, hybrid renewable energy systems are considered. HOMER simulated and configured wind turbine, photovoltaic, battery bank, and converter for the electricity demand of the Mander rural community, which has 37 families with household sizes of 7 members, as a remote village in Northern Iraq in this article. The hypothesis project was also evaluated using the parameters Net Present Value and Simple Payback Period. Daily energy consumption of 173,120 kWh and peak electricity consumption of 32,14 kW were measured for the outcome of the selected site. The proposed system produced 68,458 kWh/yr (13.7 percent) by the wind turbine, PV created 432,354 kWh/yr. (86.3 percent), and 265 operating batteries with a total operating cost (TOC) and costs of energy (COE) of $9,195 and 0.365 $/kWh, respectively. This survey emphasized the role of solar photovoltaic and wind turbine as hybrid renewable energy systems HRESs in the sustainable supply of electricity in rural areas of northern Iraq.

15 June 2022 in Tehnicki vjesnik - Technical Gazette
Verified
Journal Article
Closed access
PDF file
LALuqman Ibrahim Azeez
Luqman Ibrahim Azeez
MRMEHRSHAD RADMEHR
MEHRSHAD RADMEHR
The examination of factors that delay construction projects is essential to project management. This study examined the effects of the potential delay factors on projects’ completion time, using Radio-frequency identification (RFID) tools part of Int...