Mundher Mohammed Alsamarraie

Dr. Mundher Mohammed Alsamarraie

Universiti Sains Malaysia (USM)
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 January 2022 in Jurnal Teknologi (Sciences & Engineering)
Verified
Journal Article
Closed access
PDF file
Mundher Mohammed AlsamarraieMundher Mohammed Alsamarraie
Mundher Mohammed Alsamarraie
FGFarid Ghazali
Farid Ghazali
ZHZaid M. Hatem
Zaid M. Hatem
AFAlhamza Yassin Flaih
Alhamza Yassin Flaih
The use of drones in construction site surveillance increases gradually with a reasonably lower cost than hiring an additional workforce. At the same time, the construction industry was slow to adopt new technologies and reduce on-site problems such as cost overruns, poor quality, risks. This study is to review and investigate previous researches and illustrates the benefits and barriers of using drones. A questionnaire survey and an extensive literature review collected all the data needed to stand on critical points. The study revealed that the benefits of using drones permitted high effect sight in site safety, security, control on quality, cost of work, and documentation. On the other hand, privacy and security, environmental issues, public perception are the most frequent barriers to drone employment in construction sites. The authors conclude that drones in monitoring construction sites improve the fluent implementation of work on schedule and the high performance for entire project activities despite numerous addressed barriers. For future studies, the researchers suggest studying the effectiveness of using drones in the construction site during the covid-19 pandemic.

29 April 2022 in International Journal of Construction Management
Verified
Journal Article
Closed access
Mundher Mohammed AlsamarraieMundher Mohammed Alsamarraie
Mundher Mohammed Alsamarraie
FGFarid Ghazali
Farid Ghazali
Construction is an essential contributor for both developed and developing economies. Corruption, schedule delays, cost overruns, and erratic project performance are common few problems that face the conventional procurement process of any organization. This research focused on the weakness of current procurement practices in public construction projects in Iraq, as stated by the World Bank and Organization for Economic Cooperation and Development (OECD) reports. The methodology of this study was to collect data by conducting a thorough systematic search of existing literature. The authors used QDA Miner 4 software for coding and thematic categorization. The study found 42 variables from previous studies, and the authors distributed these variables into 12 thematic divisions representing the organization's key performance indicators (KPIs). The authors conclude that these indicators are important to introduce many frameworks for the integration of procurement process in developing countries. For future studies, there is a possibility to introduce an integrated construction and design framework to enhance organizational performance and the procurement process.

22 July 2023 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
Mundher Mohammed AlsamarraieMundher Mohammed Alsamarraie
Mundher Mohammed Alsamarraie
FGFarid Ezanee Mohamed Ghazali
Farid Ezanee Mohamed Ghazali
Public procurement is the most corrupt government activity. Process disintegration, limited competition, and corruption are the most common challenges in the procurement system. Thus, post-contracting project activities are contingent upon the effectiveness of the precontracting procurement process. This study examined the disintegration of the procurement process. It filled the gap related to the lack of comprehensive investigation in previous studies for identifying the barriers to procurement integrity. This research aimed to evaluate the procurement system’s performance by examining the impediments to embedding novel frameworks and achieving the integration of the procurement process. The researchers conducted a systematic review and proposed a conceptual framework for common issues in the procurement system. Moreover, the study employed a focus group of eight experts to examine the framework’s suitability for further studies in the public sector. The findings demonstrated ten thematic categories representing barriers to integrating multiple stages in the procurement system. The most frequent groups were fraud and corruption, accountability, lack of knowledge and skills, and lack of transparency. Due to the strict government conventional systems and regulations, this study emphasized clients’ central position and limited role in facilitating team integration, adaptiveness, and upgrading the procurement system.

19 June 2021 in ZANCO JOURNAL OF PURE AND APPLIED SCIENCES
Verified
Journal Article
Open access
PDF file
ZHZaid Hatem
Zaid Hatem
Mundher Mohammed AlsamarraieMundher Mohammed Alsamarraie
Mundher Mohammed Alsamarraie
AFAlhamza Flaih
Alhamza Flaih
AOAmmar Oda
Ammar Oda
Iraq construction industry is about to experience an increasing number of new projects. With the economy slowing over the past few years, the need for residential projects and infrastructure still as priorities. Meeting these needs will be challenging, and cash out will be in high range if the construction industry still uses the conventional construction method. The significant features and factors were created based on an extensive literature review of previous research studies in developed and developing countries (68 research papers). Iraq adopted the Industrialized Building System (IBS) approach in the last decades in a few projects, some challenges stand against the continuous adoption of (IBS). Also, many studies record some challenges that prevent the application of IBS in their countries. This study paper discusses the barriers and strategies to adopt IBS in the construction industry of Iraq that are related to the importance of construction development within the context of modern building application. The methodology based on structured hypotheses that employed an online data collection and a total number of (111) questionnaire forms collected from the experts, professionals, and engineers involved in Iraq's construction industry. The questionnaire survey results addressed the barriers, and by using SPSS (statistical package for social science), the researcher correlates the presence of these barriers with hypotheses and demonstrates that the IBS adoption in Iraq suffered a lack of governmental support, money, knowledge, and expertise. Moreover, the related internal productions for successful IBS applications indicated a need to advertise and support the modern construction system by the role of public and private sectors.

31 May 2023 in ASEAN Engineering Journal
Verified
Journal Article
Open access
PDF file
Mundher Mohammed AlsamarraieMundher Mohammed Alsamarraie
Mundher Mohammed Alsamarraie
FGFarid Ghazali
Farid Ghazali
The construction procurement process generates significant cost-related issues, such as project delivery delays, budget overruns, and poor quality. Public projects were suffering from bureaucracy and separation in work activities. Building Information Modeling (BIM) has demonstrated the potential for solving these issues. The study aims to investigate and analyze the cost-benefit analysis of using BIM compared to traditional methods in public construction projects in Iraq. Therefore, the study evaluated Multiple case studies of two projects quantitatively and conducted several interviews with 15 experts to determine the cost-benefit of adopting BIM compared to conventional methods. The study investigated the benefits of BIM in construction projects due to the remarkable difference between the two methods. The quantitative data of study findings revealed a significant cost improvement using BIM rather than the traditional method in public projects. To conclude, multi-cultural studies need to assess the projects' performance of large and small entities. Furthermore, this research suggested incorporating BIM adoption in government organizations in a wide range.

28 October 2020 in Iraqi Geological Journal
Verified
Journal Article
Closed access
PDF file
Mundher Mohammed AlsamarraieMundher Mohammed Alsamarraie
Mundher Mohammed Alsamarraie
Preliminary site properties need geophysical methods to determine it, the same as the large use of the seismic refraction method to detect the layers of soil and the depth reaching the bedrock. This study was conducted to find out the subsurface profile characteristics of a backyard field in UTM, Skudai following the principles of this method. The analysis of seismic data processed using ZondST2D software by determining the first arrival time until we get a block model of 2D shape based on the primary propagation of seismic velocity wave’s in soil layers. It was found that the investigated subsurface profile consists of four layers showing the level of weathering grade ranges from 600–4000 m/s based on the classification of rock mass in Malaysia. It was found that weathering rates decreased at higher depth, with the increase of density for the material and dampness reduction of seismic velocity. It was concluded that the survey of seismic refraction in development can be used only for shallow subsurface profiles and far from noise and disturbance.