Nima Javanshir

Dr. Nima Javanshir

Aalto University, Espoo, Uusimaa, Finland
orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications

18 June 2019 in Sustainability
Verified
Journal Article
Open access
PDF file
Nima JavanshirNima Javanshir
Nima Javanshir
SMS. M. S. Mahmoudi
S. M. S. Mahmoudi
Marc RosenMarc Rosen
Marc Rosen
In this study, a cooling/power cogeneration cycle consisting of vapor-compression refrigeration and organic Rankine cycles is proposed and investigated. Utilizing geothermal water as a low-temperature heat source, various operating fluids, including R134a, R22, and R143a, are considered for the system to study their effects on cycle performance. The proposed cycle is modeled and evaluated from thermodynamic and thermoeconomic viewpoints by the Engineering Equation Solver (EES) software. Thermodynamic properties as well as exergy cost rates for each stream are found separately. Using R143a as the working fluid, thermal and exergy efficiencies of 27.2% and 57.9%, respectively, are obtained for the cycle. Additionally, the total product unit cost is found to be 60.7 $/GJ. A parametric study is carried out to determine the effects of several parameters, such as turbine inlet pressure, condenser temperature and pressure, boiler inlet air temperature, and pinch-point temperature difference, on the cycle performance. The latter is characterized by such parameters as thermal and exergy efficiencies, refrigeration capacity, produced net power rate, exergy destruction rate, and the production unit cost rates. The results indicate that the system using R134a exhibits the lowest thermal and exergy efficiencies among other working fluids, while the systems using R22 and R143a exhibit the highest energy and exergy efficiencies, respectively. The boiler and turbine contribute the most to the total exergy destruction rate.

15 June 2023 in Process Safety and Environmental Protection
Verified
Journal Article
Closed access
AJAmirreza Javaherian
Amirreza Javaherian
NGNima Ghasemzadeh
Nima Ghasemzadeh
Nima JavanshirNima Javanshir
Nima Javanshir
MYMortaza Yari
Mortaza Yari
MVMohammad Vajdi
Mohammad Vajdi
Hossein NamiHossein Nami
Hossein Nami

18 February 2022 in Energy Reports
Verified
Journal Article
Open access
Nima JavanshirNima Javanshir
Nima Javanshir
SSSanna Syri
Sanna Syri
Antti TeräsvirtaAntti Teräsvirta
Antti Teräsvirta
VOVille Olkkonen
Ville Olkkonen

14 August 2024 in International Journal of Hydrogen Energy
Verified
Journal Article
Open access
Nima JavanshirNima Javanshir
Nima Javanshir
SPSimo Pekkinen
Simo Pekkinen
ASAnnukka Santasalo-Aarnio
Annukka Santasalo-Aarnio
SSSanna Syri
Sanna Syri

8 January 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
Nima JavanshirNima Javanshir
Nima Javanshir
SMS. M. S. Mahmoudi
S. M. S. Mahmoudi
MKM. Akbari Kordlar
M. Akbari Kordlar
Marc RosenMarc Rosen
Marc Rosen
A cogeneration cycle for electric power and refrigeration, using an ammonia-water solution as a working fluid and the geothermal hot water as a heat source, is proposed and investigated. The system is a combination of a modified Kalina cycle (KC) which produces power and an absorption refrigeration cycle (ARC) that generates cooling. Geothermal water is supplied to both the KC boiler and the ARC generator. The system is analyzed from thermodynamic and economic viewpoints, utilizing Engineering Equation Solver (EES) software. In addition, a parametric study is carried out to evaluate the effects of decision parameters on the cycle performance. Furthermore, the system performance is optimized for either maximizing the exergy efficiency (EOD case) or minimizing the total product unit cost (COD case). In the EOD case the exergy efficiency and total product unit cost, respectively, are calculated as 34.7% and 15.8$/GJ. In the COD case the exergy efficiency and total product unit cost are calculated as 29.8% and 15.0$/GJ. In this case, the cooling unit cost, c p , c o o l i n g , and power unit cost, c p , p o w e r , are achieved as 3.9 and 11.1$/GJ. These values are 20.4% and 13.2% less than those obtained when the two products are produced separately by the ARC and KC, respectively. The thermoeconomic analysis identifies the more important components, such as the turbine and absorbers, for modification to improve the cost-effectiveness of the system.