Oleksandr Krukovskyi

Dr. Oleksandr Krukovskyi

Department of Rock Mechanics, M.S. Poliakov Institute of Geotechnical Mechanics of the National Academy of Sciences of Ukraine, Dnipro, Dnipropetrovs’ka Oblast’, Ukraine
orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2021 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
Oleksandr KrukovskyiOleksandr Krukovskyi
Oleksandr Krukovskyi
Viktoriia KrukovskaViktoriia Krukovska
Viktoriia Krukovska
SSSerhii Skipochka
Serhii Skipochka
Purpose is to analyze changes in shape and dimensions of a rock mass area, fortified with the help of a polymer, depending upon the density of injection rock bolts as well as the value of initial permeability of enclosing rocks to substantiate optimum process solutions to support roofs within the unstable rocks and protect mine workings against water inflow and gas emission. Methods. Numerical modeling method for coupled processes of rock mass strain and filtration of liquid components of a polymer has been applied. The model is based upon fundamental ideas of mechanics of solids and filtration theory. The problem has been solved using a finite element method. Its solution took into consideration both the initial permeability and the permeability stipulated by mine working driving, injection time of reagents and their polymerization, and effect of po-lymer foaming in the process of mixing of its components. Changes in physicomechanical and filtration characteristics of rock mass during polymer hardening were simulated. It has been taken into consideration that a metal delivery pipe starts operating as a reinforcing support element only after the polymer hardening. Findings. If three and five injection rock bolts are installed within a mine working section then stresses, permeability coefficients, pressure of liquid polymeric composition, and geometry of the fortified area of rock mass have been calculated. It has been shown that rock bolt location is quite important to form a rock-bolt arch. It has been demonstrated for the assumed conditions that if five injection rock bolts are installed within the mine working roof then close interaction between rock-bolt supports takes place; moreover, the integral arch is formed within the mine working roof. Originality. Dependence of change in the polymer reinforced area upon a value of initial permeability of enclosing rocks has been derived. It has been shown that in terms of low values of initial permeability, geometry of rock-bolt supports as well as its size is identified only by means of a value of the unloaded zone around the mine working. In this context, initial permeabi-lity increase results in the enlarged diameter of the reinforced rock mass area in the neighbourhood of the injection rock bolt. Practical implications. The findings are recommended to be applied while improving a method to support the mine working roof and decrease water inflow as well as gas emission from the rocks, being undermined, into the working.

9 July 2019 in E3S Web of Conferences
Verified
Conference Paper
Open access
PDF file
Oleksandr KrukovskyiOleksandr Krukovskyi
Oleksandr Krukovskyi
Viktoriia KrukovskaViktoriia Krukovska
Viktoriia Krukovska
The mathematical model has been developed for the coupled processes of the rock massif deformation and gas filtration in a disturbed area around mine working, in the bottom of which there are hard and soft gas-bearing rocks. When solving the problem, the finite element method was used. The calculation results of the displacements, stresses and pressures of methane in the studied area are represented in the paper. It is shown that the difference in the physical and mechanical properties of the bottom rocks of mine working causes the non-uniform distribution of geomechanics and filtration parameters. In more strong sandstone, the stresses concentration increases. Therewith, an intensive process of fractures formation takes place in the argillite and the coal. Methane from the upper part of the gas-bearing sandstone is filtered into the mine working, the destruction of the coal interlayer is accompanied by release of methane and its accumulation under the layer of a strong sandstone. The development of a zone of inelastic deformations leads to the destruction of sandstone. In case of brittle destruction, with the formation of fractures of a certain length, a breakthrough of methane may occur out of the bottom into mine working.

30 June 2017 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
IUInstitute of Geotechnical Mechanics named after M.S. Polyakov of the National Academy of Sciences of Ukraine
Institute of Geotechnical Mechanics named after M.S. Polyakov of the National Academy of Sciences of Ukraine
Oleksandr KrukovskyiOleksandr Krukovskyi
Oleksandr Krukovskyi
Viktoriia KrukovskaViktoriia Krukovska
Viktoriia Krukovska
YVYu Vynohradov
Yu Vynohradov
IUInstitute for Physics of Mining Processes of the National Academy of Sciences of Ukraine
Institute for Physics of Mining Processes of the National Academy of Sciences of Ukraine

1 January 2020 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
SSSerhii Skipochka
Serhii Skipochka
Oleksandr KrukovskyiOleksandr Krukovskyi
Oleksandr Krukovskyi
TPTatiana Palamarchuk
Tatiana Palamarchuk
LPLiliia Prokhorets
Liliia Prokhorets

30 September 2022 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
BTBauyrzhan Tolovkhan
Bauyrzhan Tolovkhan
VDVladimir Demin
Vladimir Demin
ZAZhursyn Amanzholov
Zhursyn Amanzholov
ASAssemgul Smagulova
Assemgul Smagulova
GTGaukhar Tanekeyeva
Gaukhar Tanekeyeva
ECEdgar Caceres Cabana
Edgar Caceres Cabana
Purpose. The research purpose is to develop a geomechanical model for ensuring the safety of mining operations by determining the optimal slope angles and probabilistic assessment of the stability of the open-pit walls. Methods. Three-dimensional geomechanical models for surface mining of deposits have been developed based on calculations of the stability factor (safety factor SF) of the open-pit walls in the Rocscience program to determine the rock mass stress-strain state at the end of mining using the finite element method. The geological wireframe model (GWM) has been built on the basis of the available geological sections, horizon plans and the results of the engineering-geological surveys using the Surpac geoinformation system. Findings. Strength reduction factor (SRF) has been determined taking into account the physical-mechanical properties of rocks that constitute the near-wall mass. An assessment of the stability of walls according to the selected geological sections is given, taking into account the projected contour of the Severny Katpar open-pit walls. The calculation of the projected contour stability of the open-pit walls by several different methods has revealed that the open-pit walls are generally stable. The open-pit parameters at the end of mining have been determined. Originality. For the first time, it has been determined that in the Southern and South-Western area of the Severny Katpar open-pit wall in the horizons +700…+400, there is a decrease in SF from 1.18 to 1.41 due to the predominant occurrence of siltstones and tectonic disturbances of the walls. Practical implications. The mathematical calculation results of the stability of the projected contour walls in the Severny Katpar open pit have been generalized. In addition, a geological and structural wire-frame model of the deposit has been developed, which makes it possible to ensure the safety of mining operations in the open pit.

9 July 2019 in E3S Web of Conferences
Verified
Conference Paper
Open access
PDF file
Oleksandr KrukovskyiOleksandr Krukovskyi
Oleksandr Krukovskyi
YBYurii Bulich
Yurii Bulich
YZYuliia Zemlianaia
Yuliia Zemlianaia
The modification of the technology roof bolt supporting of mine workings in the conditions of increasing the coal mining intensity has been made. The technological schemes have been developed for the phased construction of roof bolting and frame support. This schemes make it possible to temporarily postpone the setting of frames in the mine working face, reduce the time and labour intensity for covering with a grid of the mine working arch and setting the bolts, as well as to increase the safety. The analysis of changes in the stress state of the border massif during the phased construction of roof bolting and frame support has been made. It is shown that the technology of phased construction of roof bolting and frame support ensures the maintaining a stable state of host rocks. In addition, the time between the extraction of the coal-rock mass and the setting of the primary support, as well as the distance between the face and the first row of roof bolts has been reduced to a minimum. The suggested approach makes possible to ensure the rate of preparatory mine workings development that are necessary for the intensification coal mining.