Pingkuang Luo

Dr. Pingkuang Luo

orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
9 December 2022 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Closed access
PDF file
JMJinyin Ma
Jinyin Ma
Diyuan LiDiyuan Li
Diyuan Li
PLPingkuang Luo
Pingkuang Luo
CZChenxi Zhang
Chenxi Zhang
FGFeihong Gao
Feihong Gao

15 May 2024 in Buildings
Verified
Journal Article
Open access
PDF file
JZJunjie Zhou
Junjie Zhou
SGShan Gao
Shan Gao
PLPingkuang Luo
Pingkuang Luo
JFJiale Fan
Jiale Fan
CZCongcong Zhao
Congcong Zhao
The number of excavated tunnels is increasing day by day, and the corresponding engineering scale is also getting increasing. Safe, efficient, and economically beneficial tunnel construction methods are indispensable in the process of crossing mountains and steep ridges in the southwest region. However, behind the improvement of transportation infrastructure in Southwest China is the support provided by the rapid development of blasting industry engineering technology in China. In the process of tunnel construction using the drilling and blasting method, in addition to blasting vibration disasters the phenomenon of overbreak and underbreak caused by blasting construction is a prominent problem. This phenomenon not only affects the safety and stability of the tunnel excavation but also seriously increases the construction cost. Based on a short mountain hard rock tunnel project in southwest China, this paper studies the effect of blasting construction on the blasting vibration of adjacent structures and the influence of tunnel contour forming quality. Through the monitoring and analysis of in situ blasting vibration, the Sadowski formula is used to study the attenuation law of blasting vibration velocity in different tunnel sites, which provides a theoretical basis for tunnel blasting vibration control. This article compares the use of overbreak and underbreak value with the traditional method to determine the degree of overbreak and underbreak. It introduces the analysis of contour section fractal dimension value and uses fractal theory in the Python image processing module to accurately and quantitatively describe the problems of tunnel overbreak and underbreak. The feasibility and accuracy of this method have been verified, by combining the total station and 3D laser scanner results of overbreak and underbreak measurements of the Brenner Base Tunnel and a short hard rock tunnel in a mountainous area of southwestern China. The blasting scheme was optimized from the aspects of cut hole form, detonator interval time, and peripheral hole charge structure, and the rationality of the optimized scheme was verified according to the on-site blasting experiments. It has a profound influence on strengthening the protection of adjacent tunnel structures and improving the economic benefit of mountain highway projects.

11 September 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Diyuan LiDiyuan Li
Diyuan Li
HGHao Gong
Hao Gong
Zhenyu HanZhenyu Han
Zhenyu Han
WRWenkai Ru
Wenkai Ru
PLPingkuang Luo
Pingkuang Luo
As metal mines advance into deep mining, the increase in tectonic stress and horizontal stress leads to a higher degree of joint and fissure development in roadway surrounding rocks, along with a significant rise in both the fragmentation degree of the rock mass and the support cost. This paper adopts field monitoring and numerical simulation methods to analyze the characteristics of mining-induced stress rotation after unloading due to deep roadway excavation in the Jinchuan mining area, and proposes corresponding surrounding rock control countermeasures and optimized schemes for the original support. The research results show that after the unloading caused by the excavation of deep roadway surrounding rock, the magnitudes and directions of the maximum, intermediate, and minimum principal stresses all exhibit a trend of slow change, followed by drastic change, and finally gradual stabilization. When the roadway advances to 4 m in front of the monitor section, the adjustment of the magnitude of principal stress of the surrounding rock is the most drastic. Moreover, as the working face moves away from the monitor section, the principal stress gradually stabilizes and becomes lower than the initial stress value. When the roadway advances to 6 m in front of the monitor section, the adjustment of the direction of the principal stress of the surrounding rock is the most drastic. The rotation angle of the maximum principal stress shows a trend of first increasing and then decreasing with the increase in the excavation step, while the rotation angles of the intermediate and minimum principal stresses show a trend of first decreasing and then increasing as the excavation step increases. Based on the spatial distribution characteristics of joints and fissures in the roadway surrounding rock, the sensitive area for the rotation of mining-induced stress direction is defined. By changing the advancing direction of the roadway, the rotation trajectory of the principal stress can be deviated from the sensitive area, thereby improving the self-stabilization ability of the roadway surrounding rock. It is proposed that asymmetric coupling support be adopted to reinforce the positions where the principal stress rotation of the rock mass around the anchorage is severe, which can effectively reduce the range of the plastic zone in the roadway surrounding rock. The research results provide new ideas for the surrounding rock control of deep roadways, as well as a theoretical basis for the design and optimization of roadway support parameters in similar mines.