Housing construction is a key segment of economy in any country, as it satisfies the needs of population and ensures safe living conditions. This segment must take into account the requirements of safety, environmental friendliness, energy efficiency and limited mobility, resulting in high-quality construction products within pre-set deadlines. Due to the fact that many parties are involved in the construction of buildings, numerous processes are underway. As a result, various risk factors may arise. They may cause a failure to meet deadlines and lower quality of work. The authors propose administrative and process-related solutions aimed at eliminating the most substantial risk factors. The study solves the following tasks: analyzing the general contractor's activity in residential construction; studying risk factors that affect the building construction period; identifying actions aimed at mitigating risk factors by applying administrative and process-related solutions; developing and implementing a novel method developed on the basis of the research projects. An expert survey was conducted among the top specialists from the construction industry, and a list of risk factors arising during the construction of residential buildings was made. As a result, a method is developed that enables the pre-assessment of potential construction risk factors and elimination or minimization of their effect. This method reduces the period of construction, improves the quality of construction facilities and, on the whole, increases labor productivity.
The stages of pre-project preparation and design development are the fundamentals to the further implementation of an investment and construction project. The success of construction and commissioning of facilities depends on the smooth completion of these stages. The duration of stages depends on the competence and coordination of interaction between participants of an investment and construction project, rational decision making by the project manager and a number of other factors. Identifying these factors and finding rational planning options in terms of the stages of pre-project preparation and design development is a highly relevant task. With this in mind, the authors have developed an organizational and management model of a rational procedure to be implemented by the project manager at the stages of pre-project preparation and design development for a facility to be constructed. The model takes into account the influence of negative factors. The authors have also developed a method for selecting rational solutions at the stages in question. The analysis of the research literature and regulatory documents was performed for this purpose. The method of expert evaluations, elements of numerical analysis, mathematical processing of practical results and methods of mathematical modeling were applied. As a result, the authors have developed an organizational and management model for a rational combination of procedures at the stages of pre-project preparation and design development for a facility to be constructed and derived a formula determining the duration of implementation of each stage and a technique designated for selecting rational solutions at the stages in question. The findings of this study can simplify project planning and process management at the stages of pre-project preparation and design development in terms of information modeling.
9 August 2024 in Construction Materials and Products
In connection with the current demand for reducing the implementation of investment and construction projects, there is a need to determine the risks that affect the duration. Within the framework of building and construction works, there is a risk of various destabilizing factors arising, leading to economic losses and increased construction period, and consequently a decrease in labor productivity. Existing administrative barriers, maintaining and coordinating a large amount of executive documentation leads to high costs of various resources. In this regard, the work optimized the functioning of the construction control system. The study identified factors that influence the functioning of the construction control system. A rational procedure for carrying out construction control of capital construction projects has been determined. The study used such methods as: the method of expert assessments, statistical data analysis, and the Varimax rotation method. The results of the study were introduced into the activities of the organization performing the functions of a developer at the stage of construction of objects. As a result, a method of interaction between participants in the construction control system has been formed, which allows increasing labor productivity.
This article analyzes the measures to improve the business climate in the construction sector (roadmap), implemented in Russia in recent years. The indicators of Russia in the international Doing Business rating are analyzed; an improvement in Russia's position in the field of favorable conditions for doing business, despite the difficult economic situation in the country is revealed. The main indicators of the effectiveness of optimizing the completion of procedures were the introduction of an exhaustive list of procedures with a description, the elimination of redundant (duplicate) procedures, a reduction in the duration of the procedure, and the introduction of digital technologies during the completion of procedures. Despite the reforms carried out in Russia, depending on the region, there are a number of problems of a different nature when going through the procedures at the stages of pre-design and project preparation, which entail an increase in time and financial costs. Because of this, it becomes necessary to develop additional measures to optimize procedures related to getting building permission.
The construction control system is complex and its functioningrequires coordinated and prompt interaction without the occurrence offailures and conflict situations. The paper identifies factors influencing theoperation of the system and specific processes, the approach to whichshould be reconsidered. The research methods used included the method ofexpert assessments, statistical data analysis, and the Varimax rotationmethod. As a result of the study, the 3 most significant factors influencingthe construction control system were identified, and the need to introduce aUnified Information Environment was substantiated. Reducing the level ofinfluence of factors will contribute to more successful functioning of theconstruction control system and the interaction of system participants with each other.
Managing the life cycle of a construction project using digital technologies has its own peculiarities and causes a number of problems which may have environmental consequences during the construction of facilities. The subject of the study is to review modern IT technologies in the field of construction work and design of buildings and structures. The purpose of the scientific work is to conduct a thematic content analysis and interpret information to assess the impact of the use of digital technologies on the rational use of various resources, including energy consumption, on the environmental sustainability of a construction site, and on the results of the work of a construction organization. In conclusion, it was considered that competent management of the life cycle of a construction project, the use of digital technologies, and the use of modern IT technologies affect the assessment of energy consumption, environmental consequences, the identification of hazardous factors and possible consequences of the impact of construction process. A strategy for the integrated use of digital technologies is needed, which, in turn, will ensure the synergistic effects of their use and will contribute to the further development of sustainable construction, without causing damage to the environment.