We live in a technology driven era where each day new gadgets improve the way we live our lives. Many resources are being spent on building these devices that often turn obsolete overnight. Taking into account that these electronics have a long-term impact on the environment, a waste management system must be embedded in the electronic product lifecycle. In this paper, we propose a monitoring system for recycling batteries from electronic equipment and devices. This solution covers specific waste management issues to manage and reduce battery waste and to recover valuable materials and components. A solution for the continuous monitoring of each battery waste container is also proposed. The solution involves the storage of all information regarding the recycling process, such as pickup date and time, collector’s name, quantity, and location. The research is also extended for smartphone usage. This is an important feature for collectors who need to access data in real time from any location. The mobile application directly reads the weight of battery waste, automatically saves the date and time, and stores the location along with any other useful information.
This paper focuses on the interdisciplinary research on the design of a smart gateway for managing the dynamic error code testing collected and generated by the Electronic Control Unit (ECU) from the automotive industry. The techniques used to exchange information between the ECU code errors and knowledge bases, based on data fusion methods, allowed us to consolidate and ensure data reliability, and then to optimize processed data in our distributed electronic systems, as the basic state for Industry 4.0 standards. At the same time, they offered optimized data packets when the gateway was tested as a service integrator for ECU maintenance. The embedded programming solutions offered us safe, reliable, and flexible data packet management results on both communication systems (Transmission Control Protocol/Internet Provider (TCP/IP) and Controller Area Network (CAN) Bus) on the Electronic Control Unit (ECU) tested for diesel, high-pressure common rail engines. The main goal of this paper is to provide a solution for a smart, hardware–software, Industry-4.0-ready gateway applicable in the automotive industry.
The main parameters governing wind power economics include: investment costs; operation and maintenance costs; turbine lifetime, electricity production/average wind speed, etc. Mature wind power plant (WPP) infrastructures still require a large investment for to maintain and manage these infrastructures effectively. The aim of this paper is to identify the matters from maintenance in WPP areas and to do a literature review of the major aspects in a wind turbine that should be monitored. Finally, a virtual monitoring instrument, using HP VEE Pro Software was developed, to control a WPP, based on inclinometers and acoustic signals transducers.
27 June 2017 in IOP Conference Series: Materials Science and Engineering
Electronic operating at high frequencies can have problems with emission of high frequency noise. Once put inside an enclosure, the energy will add in phase at certain frequencies to cause resonances which will hinder the performance of the device. These absorbers are based upon open celled foam impregnated with a carbon coating. It is quite possible that in the near future, microprocessors would be to work on a frequency located in 5 to 10 GHz. In these circumstances it is useful to know how and how much of the electromagnetic field emitted by a microprocessor, it is absorbed by the circuit elements in the immediate vicinity of the microprocessor. The aim of this contribution is to demonstrate throughout high-level experimental analysis how the main electric parameters of polymer materials, which build the printed circuits and the one of electric capacitors and resistors, depend on the frequencies on which they work from the microwave range.
27 June 2017 in IOP Conference Series: Materials Science and Engineering
Insulation resistance measurement is one of the most important tests required by standards and regulations in terms of electrical safety. Why these tests are is to prevent possible accidents caused by electric shock, damage to equipment or outbreak of fire in normal operating conditions of electrical cables. The insulation resistance experiment refers to the testing of electrical cable insulation, which has a measured resistance that must be below the imposed regulations. Using a microcontroller system data regarding the insulation resistance of the power cables is acquired and with SCADA software the test results are displayed.