Kazimierz Mikołaj Urbańczyk

Dr. Kazimierz Mikołaj Urbańczyk

Polish Salt Mining Association, Kraków, Małopolskie, Poland
orcid

Research Focus & Metrics

Academic Career Length

52Years (1975-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 February 2022 in Renewable and Sustainable Energy Reviews
Verified
Journal Article
Closed access
LLLeszek Lankof
Leszek Lankof
KUKazimierz Mikołaj Urbańczyk
Kazimierz Mikołaj Urbańczyk
RTRadoslaw Tarkowski
Radoslaw Tarkowski

1 July 2017 in Journal of Natural Gas Science and Engineering
Verified
Journal Article
Closed access
JŚJarosław Ślizowski
Jarosław Ślizowski
LLLeszek Lankof
Leszek Lankof
KUKazimierz Mikołaj Urbańczyk
Kazimierz Mikołaj Urbańczyk
KSKarolina Serbin
Karolina Serbin

1 October 2015 in International Journal of Rock Mechanics and Mining Sciences
Verified
Journal Article
Closed access
KSKarolina Serbin
Karolina Serbin
JŚJarosław Ślizowski
Jarosław Ślizowski
KUKazimierz Mikołaj Urbańczyk
Kazimierz Mikołaj Urbańczyk
SNStanislaw Nagy
Stanislaw Nagy

1 January 2013 in Advances in High Energy Physics
Verified
Journal Article
Open access
PDF file
JSJaroslaw Slizowski
Jaroslaw Slizowski
ZPZenon Pilecki
Zenon Pilecki
KUKazimierz Mikołaj Urbańczyk
Kazimierz Mikołaj Urbańczyk
EPElzbieta Pilecka
Elzbieta Pilecka
LLLeszek Lankof
Leszek Lankof
RCRafal Czarny
Rafal Czarny
The aim of the work was to evaluate the possibilities of excavating a chamber for the Glacier detector, a cylinder with a 74 m diameter and 38 m height filled with 100 kT of liquid argon, in the Polkowice-Sieroszowice copper ore mine in the Legnica-Glogow Copper Area (LGOM). Two potential locations were analyzed in a rock salt layer more than 100 m thick at the depth of 1000 m and in the anhydrite layer of about 100 m thick at the depth of 650 m, both lying above the copper ore deposit. The numerical analyses, based on geological, geophysical, and geomechanical research, were carried out to determine the behavior of the system of the chamber and surrounding rock mass. Two creep laws have been adopted for rock salt in the numerical models, Norton and Lubby2. Their coefficients have been adjusted forin situmeasurements of the mine galleries convergence starting from the results of laboratory tests. Displacement and stresses of the rock salt in the chamber vicinity are much greater for the Lubby2 law. The displacements indicated at the chamber contour are the reason that the alternative location in the anhydrite layer was more advantageous.

1 March 1975 in Nuclear Instruments and Methods
Verified
Journal Article
Closed access
KUKazimierz Mikołaj Urbańczyk
Kazimierz Mikołaj Urbańczyk
MWMichael Waligórski
Michael Waligórski

24 September 2022 in Energies
Verified
Journal Article
Open access
PDF file
LLLeszek Lankof
Leszek Lankof
SNStanislaw Nagy
Stanislaw Nagy
Krzysztof PolańskiKrzysztof Polański
Krzysztof Polański
KUKazimierz Mikołaj Urbańczyk
Kazimierz Mikołaj Urbańczyk
The paper aims to give a universal methodology for assessing the storage capacity of a bedded rock salt formation in terms of the operational and strategic storage facilities for liquid fuels. The method assumes the development of a geological model of the analyzed rock salt formation and the determination of the salt caverns’ size and spacing and the impact of convergence on their capacity during operation. Based on this method, the paper presents calculations of the storage capacity using the example of the bedded rock salt formations in Poland and their results in the form of storage capacity maps. The maps show that the analyzed rock salt deposits’ storage capacity in northern Poland amounts to 7.1 B m3 and in the Fore-Sudetic Monocline to 10.5 B m3, in the case of strategic storage facilities. The spatial analysis of the storage capacity rasters, including determining the raster volumes and their unique values, allowed us to quantify the variability of the storage capacity in the analyzed rock salt deposits.