Vasso E. Papadimitriou

Mrs. Vasso E. Papadimitriou

School of Civil Engineering, Aristotle University, Thessaloníki, Kentrikí Makedonía, Greece
orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 April 2024 in Buildings
Verified
Journal Article
Open access
PDF file
Vasso E. PapadimitriouVasso E. Papadimitriou
Vasso E. Papadimitriou
Georgios AretoulisGeorgios Aretoulis
Georgios Aretoulis
The construction sector in Greece has been developing radically in the field of building renovations. The foremost problem for projects in the building construction industry is producing an accurate and reliable cost estimate at the onset of construction. The artificial neural network (AΝΝ) approach, using data available at the early stages of the project, can help resolve or prevent any kind of difficulty that could make the successful completion of a building less likely. ANNs have been highly efficient in gaining results which could prevent the failure of building constructions projects. The ultimate goal is to highlight the usefulness of the adoption of ANNs models to predict the final cost of a building renovation project. Thus, construction companies could avoid financial failure, provided that the gap between cost prediction and final cost for renovation projects is minimized. This paper presents an artificial neural network (ANN) approach for predicting renovation costs in Greek construction projects. The study, based on a comprehensive literature review and real renovation data from construction companies, employs IBM SPSS Statistics software to build, train, and test the ANN model. The model, which uses initial cost, estimated time, and initial demolition cost as inputs, is based on the radial basis function procedure. The model presents high performance with up to 2% sum of squares error and near zero relative error, demonstrating the ANN’s effectiveness in estimating total renovation costs.

2 September 2024 in Algorithms
Verified
Journal Article
Open access
Vasso E. PapadimitriouVasso E. Papadimitriou
Vasso E. Papadimitriou
Georgios AretoulisGeorgios Aretoulis
Georgios Aretoulis
JPJason Papathanasiou
Jason Papathanasiou
Renovation of buildings has become a major area of development for the construction industry. In the building construction sector, generating a precise and trustworthy cost estimate before building begins is the greatest challenge. Emphasizing the value of using ANN models to forecast the total cost of a building renovation project is the ultimate objective. As a result, building firms may be able to avoid financial losses as long as there is as little discrepancy between projected and actual costs for remodeling works in progress. To address the gap in the research, Greek contractors specializing in building renovations provided a sizable dataset of real project cost data. To build cost prediction ANNs, the collected data had to be organized, assessed, and appropriately encoded. The network was developed, trained, and tested using IBM SPSS Statistics software 28.0.0.0. The dependent variable is the final cost. The independent variables are initial cost, estimated completion time, actual completion time, delay time, initial and final demolition-drainage costs, cost of expenses, initial and final plumbing costs, initial and final heating costs, initial and final electrical costs, initial and final masonry costs, initial and final construction costs of plasterboard construction, initial and final cost of bathrooms, initial and final cost of flooring, initial and final cost of frames, initial and final cost of doors, initial and final cost of paint, and initial and final cost of kitchen construction. The first procedure that was employed was the radial basis function (RBF). The efficiency of the RBFNN model was evaluated and analyzed during training and testing, with up to 6% sum of squares error and nearly 0% relative error in the training sample, which accounted for roughly 70% of the total sample. The second procedure implemented was the method called the multi-layer perceptron (MLP). The efficiency of the MLPNN model was assessed and examined during training and testing; the training sample, which made up around 70% of the overall sample, had a relative error of 0–7% and a sum of squares error ranging from 1% to 5%, confirming specifically the efficacy of RBFNN in calculating the overall cost of renovations.

3 November 2025 in Algorithms
Verified
Journal Article
Open access
PDF file
Vasso E. PapadimitriouVasso E. Papadimitriou
Vasso E. Papadimitriou
Georgios AretoulisGeorgios Aretoulis
Georgios Aretoulis
Early cost assessment is an essential part of building construction strategy; however, preliminary estimates are occasionally unreliable given incomplete data, which causes budgetary overruns. In general, traditional prediction techniques are imprecise and sluggish, particularly while the project scope is still unclear. By introducing a hybrid framework that utilizes ANNs for renovation cost estimation and features enhancements by the TOPSIS method to guarantee contextual relevance and input accuracy, the present research overcomes these drawbacks. Utilizing data from projects that are structurally and contextually comparable enhances the model’s predicted reliability and robustness. The study builds, trains, and tests two ANN models using IBM SPSS Statistics software, which is based on a thorough literature review and actual renovation data from construction businesses. One model utilized 53 data points from prior building renovation projects, whereas the second model employed 11 data points from post-TOPSIS technique building renovation projects. The Radial Basis Function (RBF) procedure is the basis for models that include 14 input data such as total initial cost, estimated completion time, initial demolition drainage cost, initial cost of plumbing work, initial heating cost, initial cost of electrical work, initial cost of masonry coatings, initial cost of plasterboard construction, initial bathroom cost, initial flooring costs, initial frame cost, initial door cost, initial paint cost, and initial kitchen construction cost, and one output data, the total final cost. The models show excellent performance with near 0.5 relative error and up to 0.3 monetary units sum of squares error before applying the TOPSIS method and nearly 0.6 relative error and up to 0.8 monetary units sum of squares error after the TOPSIS implementation, proving the usefulness and demonstrating the speed of the ANN in estimating overall renovation costs in combination with the TOPSIS approach. By employing this hybridized approach, the entire contingent procedure is expedited and accomplished more rapidly.