Early collaboration is crucial if the final design is to be clash-free, and automation processes through Building Information Modelling (BIM) have the capacity to reduce clashes through 3D design coordination. Yet, current design practices are still dependent on clash detection and contemporary literature presents several reasons for this. This paper investigates the root causes of clashes with respect to achieving “clash avoidance” as proposed in PAS 1192-2 design phase specifications for BIM in the UK. Empirical data from BIM coordinators around the world was collected and analyzed using explanatory sequential mixed-methods. It was found that: (i) isolated working was the prime cause of high occurrences of clashes linked to mechanical, electrical and plumbing (MEP) 3D BIM systems; (ii) there is a link between non-BIM specific training (or the professional qualifications) of design practitioners with the high incidence of clashes; and (iii) the current structure of cloud-based common data environments (CDEs) does not facilitate clash avoidance and in fact, encourages isolated working in the early design stage by creating “digital information silos”. A conceptual framework for an open work in progress (OWIP) has been proposed to address this problem. These findings point to the need for more transparency during collaboration through CDE where designers from multidisciplinary backgrounds can engage in concurrent co-creation. This transparent and inclusive process could have consequences on how future architectural, engineering and construction (AEC) professionals are trained.
10 August 2018 in Engineering, Construction and Architectural Management
Purpose: In the architecture, engineering and construction (AEC) industry, a “digital divide” exists in technology adoption because SMEs (who often form the bulk of AEC organisations in most countries) are thought to be “Late Majority” and “Laggards” in the adoption of Building information modelling (BIM) technology. Larger organisations not saddled with financial and socio-technical constraints might be considered as being among the “Early Majority” or “Innovators”. It is crucial to understand how these organisations differ in their speed of BIM technology adoption and the rationale for this difference. The purpose of this paper is to investigate the potential causes of the digital divide and suggest solutions for bridging the gap.Design/methodology/approach: Using mixed research method, data were collected through online questionnaire survey of over 240 global respondents as well as a semi-structured interview with nine experts for which statistical and thematic analyses were used, respectively.Findings: Organisations can be zoned into “layers” and “levels” of BIM technology adoption and their size is not always significant in terms of the speed at which they adopt BIM. The digital divide is unequal across layers/levels and large organisations utilise technologies across the BIM maturity levels depending on project circumstances. A conceptual model for BIM technology was developed to aid identification of the “Laggards” and “Late Majority” from the “Innovators” through which change agents can customise adoption strategies for each group.Originality/value: The developed model could serve as a tool for engagement and policy making and it contributes to the body of knowledge in the field of BIM technology adoption.
In rapidly developing countries such as the Kingdom of Saudi Arabia (KSA), where the construction of buildings and supporting infrastructure is critical to achieving strategic developmental milestones, delays to capital projects can derail other sectors of the economy and could derail the Vision 2030 agenda. Attempts have been made over the years to explore the causes of construction project delays, including those in Saudi Arabia. Many of these studies are either outdated, narrow in scope, or tend to use only qualitative data, and not many have focused on the client-related delay factors affecting projects critical to Vision 2030. This study investigates client-related delay factors in terms of their correlation with key characteristics of recently completed construction projects in KSA. This objective necessitated the use of historical data; hence, an archival analysis was conducted for 37 projects among three different public sector ministries. The data were subjected to manual extraction, descriptive statistical analysis, and the use of established models such as schedule performance index (SPI) and cost performance index (CPI), and inferential (correlation) in Statistical Package for the Social Sciences (SPSS) using point-biserial correlation coefficient (rpb, where p > 0.05) to explore association and impact of project characteristics on themselves and on client-related causes of delay. Results revealed eight unique client-related causes of delay, with SPI values of 0.71 to 0.82, as well as CPI values ranging from 0.84 to 0.89, suggesting very poor time and cost performance across all projects, as well as the magnitude of correlation of key project characteristics (cost, duration, additional time, and additional cost) with the eight client-related causes of delay. The findings can help the client (authorities) understand and curb delays that are due to their own making, and it is recommended that such delay factors, whose likelihood are now established and whose potential impact can be measured against key project characteristics, be developed into a delay risk impact tool. International joint ventures can bring technical expertise for Vision 2030, but they cannot eliminate delays due to government practices.
This is the author’s version of a work that was accepted for publication in the journal Building and Environment. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. A definitive version was subsequently published at:Natural ventilation is attractive due its potential to lower energy consumed by healthcare environments but maintaining steady/adequate airflow rates and thermal comfort is challenging in temperate countries. Although many contemporary hospitals use traditional windows for natural ventilation, there are alternative strategies that are largely under-utilised probably due to lack knowledge of their ventilation performances. Each alternative has design implications and airflow characteristics – both of which affect thermal comfort and heating energy. This study evaluates the performance of buoyancy-driven airflows through four selected natural ventilation strategies suitable for single-bed hospital wards. These strategies are: single window opening, same side dual-opening, inlet and stack as well as ceiling-based natural ventilation (CBNV), a new concept. These strategies have been explored via dynamic thermal simulation and computational fluid dynamics, using a new ward of the Great Ormond Street Hospital (GOSH) London as a case study. Results reveal that 25% trickle ventilation opening fraction is required to achieve required airflow rates and acceptable thermal comfort in winter, and with exception of window-based design, other strategies minimise summer overheating to different extents. The CBNV concept uniquely shields fresh air and delivers it to isolated parts of wards or directly over patients (i.e. personalisation). This provides higher air quality at such locations and creates mixing which aids comfort and dilution. The findings demonstrate how quantitative data from simulations can be used by designers to meet qualitative or sensory design objectives like airflow direction and thermal comfort with respect to the energy consumed in space and time
As the possibility of safe escape is one of the most crucial aspects of a building’s fire safety features, understanding of human behaviour under fire conditions is important for a successful evacuation. Although most of today’s buildings are equipped with fire safety systems, a fire can still occur at anytime and anywhere in a building and have devastating consequences. In the last decade, researchers and practitioners have used information technology to assist with fire safety design and emergency management. Building Information Modelling (BIM) is an exemplar process whose underpinning digital technology has been helpful for fire safety design, simulation, and analysis, but there is a lack of research on how BIM-based models combined with agent-based simulations can help improve evacuation via effective navigation and wayfinding in high-rise residential buildings. Customising evacuation instructions based on BIM, simulation results and occupant location, and delivery of these bespoke instructions to occupants’ smartphones during a fire emergency is relatively novel and research is needed to realise the potential of this approach. Therefore, this study investigates how customised evacuation instructions delivered to each occupant in a high-rise residential building could result in a faster evacuation during a fire incident. The research adopted a case study building and used Pathfinder (agent-based evacuation simulation software) to simulate evacuation from this eleven-floor high-rise residential building in Cairo, Egypt. Constraining evacuees (simulated agents in Pathfinder) to take particular exit routes was used as a proxy for delivering customised evacuation instructions to actual evacuees. Simulation results show that, in general, allowing the use of lifts for the benefit of disabled occupants could lead to their misuse by able-bodied occupants; evacuees would attempt to use the first visible point of exit regardless of how crowded it is. With optimally customised instructions, the evacuation time was, on average, 17.6 min (almost 50%) shorter than when the occupant’s choice of egress route was simulated based on standard path planning factors such as route length, nearby crowds and visible hazards. With evacuation instructions sent via smartphones, occupants could exit more rapidly via alternative routes. Such bespoke instructions were shown to reduce the adverse effects of crowdedness and uneven distribution of occupants along vertical and horizontal evacuation routes on evacuation time.