Abbas F. Jasim

Prof. Dr. Abbas F. Jasim

Highway and Transportation Engineering Department, Mustansiriyah University, Baghdad, Baghdād, Iraq
orcid
Mustansiriyah University/ College of Engineering/Highway and

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2018 in Applied Energy
Verified
Journal Article
Closed access
Hao WangHao Wang
Hao Wang
Abbas F. JasimAbbas F. Jasim
Abbas F. Jasim
XCXiaodan Chen
Xiaodan Chen

1 August 2018 in Applied Energy
Verified
Journal Article
Closed access
Abbas F. JasimAbbas F. Jasim
Abbas F. Jasim
GYGreg Yesner
Greg Yesner
Hao WangHao Wang
Hao Wang
ASAhmad Safari
Ahmad Safari
AMAli Maher
Ali Maher
BBB. Basily
B. Basily

1 December 2017 in Energy
Verified
Journal Article
Closed access
Abbas F. JasimAbbas F. Jasim
Abbas F. Jasim
Hao WangHao Wang
Hao Wang
GYGreg Yesner
Greg Yesner
ASAhmad Safari
Ahmad Safari
AMAli Maher
Ali Maher

1 January 2019 in International Journal of Sustainable Transportation
Verified
Journal Article
Closed access
Hao WangHao Wang
Hao Wang
IAIsraa Al-Saadi
Israa Al-Saadi
PLPan Lu
Pan Lu
Abbas F. JasimAbbas F. Jasim
Abbas F. Jasim
This article focused on quantifying environmental impact of asphalt pavement preservation at construction and use stage using life-cycle assessment (LCA) approach. Preservation treatments considered in the analysis include thin overlay, chip seal, and crack seal that are typically used by highway agencies. At construction stage, there are significant differences in emissions caused by various preservation treatments mainly due to different raw material components and manufacturing processes. At use stage, fuel consumptions vary significantly depending on tire rolling resistance that is affected by pavement surface characteristics. The Carbon Dioxide (CO2) emissions at the use stage were predicted using the Motor Vehicle Emission Simulator (MOVES) and pavement roughness models obtained from Long-Term Pavement Performance (LTPP) program. The results show that pavement preservation brings significant environmental benefit in reduction of CO2 emission due to the improved pavement surface condition despite the emission generated at construction stage. Thin overlay produces the highest life-cycle reduction in CO2 emission due to the large International Roughness Index (IRI) jump after treatment; while crack seal has the lowest reduction of CO2 emission. The optimum application timing of preservation treatment was determined for chip seal and thin overlay assuming one-time treatment applied before reaching the IRI threshold.

1 January 2019 in Sensors and Actuators A: Physical
Verified
Journal Article
Closed access
GYG. Yesner
G. Yesner
Abbas F. JasimAbbas F. Jasim
Abbas F. Jasim
HWH. Wang
H. Wang
BBB. Basily
B. Basily
AMA. Maher
A. Maher
ASA. Safari
A. Safari

27 February 2019 in Transportation Research Record: Journal of the Transportation Research Board
Verified
Journal Article
Closed access
Abbas F. JasimAbbas F. Jasim
Abbas F. Jasim
Hao WangHao Wang
Hao Wang
GYGreg Yesner
Greg Yesner
ASAhmad Safari
Ahmad Safari
PSPat Szary
Pat Szary
This study investigated the energy harvesting performance of a piezoelectric module in asphalt pavements through laboratory testing and multi-physics based simulation. The energy harvester module was assembled with layers of Bridge transducers and tested in the laboratory. A decoupled approach was used to study the interaction between the energy harvester and the surrounding pavement. The effects of embedment location, vehicle speed, and temperature on energy harvesting performance were investigated. The analysis findings indicate that the embedment location and vehicle speed affects the resulted power output of the piezoelectric energy harvesting system. The embedment depth of the energy module affects both the magnitude and frequency of stress pulse on top of the energy module induced by tire loading. On the other hand, higher vehicle speed causes greater loading frequency and thus greater power output; the effect of pavement temperature is negligible. The analysis of total power output before reaching fatigue failure of the energy module can be used to determine the optimum embedment location in the asphalt layer. The proposed energy harvesting system provides great potential to generate green energy from waste kinetic energy in roadway pavements. Field study is recommended to verify these findings with long-term performance monitoring of pavement with embedded energy harvesters.