Sadegh Azizi

Sadegh Azizi

Auto-generated profile, based on publicly available information

Sadegh Azizi

School of Electronic and Electrical Engineering, University of Leeds, Leeds, U.K.

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 February 2021 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
MSMingyu Sun
Mingyu Sun
GLGaoyuan Liu
Gaoyuan Liu
MPMarjan Popov
Marjan Popov
VTVladimir Terzija
Vladimir Terzija
SASadegh Azizi
Sadegh Azizi
The conventional Under Frequency Load Shedding (UFLS) scheme could result in unacceptably low frequency nadirs or overshedding in power systems with volatile inertia. This paper proposes a novel UFLS scheme for modern power systems whose inertia may vary in a wide range due to high penetration of renewable energy sources (RESs). The proposed scheme estimates the rate of change of frequency (RoCoF) of the center of inertia (CoI), and consequently, the loss of generation (LoG) size, using local frequency measurements only. An innovative inflection point detector technique is presented to remove the effect of local frequency oscillations. This enables fast and accurate LoG size calculation, thereby more effective load shedding. The proposed UFLS scheme also accounts for the effect of the inertia change resulting from LoG events. The performance of the proposed scheme is validated by conducting extensive dynamic simulations on the IEEE 39-bus test system using Real Time Digital Simulator (RTDS). Simulation results confirm that the proposed UFLS scheme outperforms the conventional UFLS scheme in terms of both arresting frequency deviations and the amount of load shed.

10 February 2011 in IEEE Transactions on Smart Grid
Verified
Journal Article
Closed access
SSS. Arash Nezam Sarmadi
S. Arash Nezam Sarmadi
ADAhmad Salehi Dobakhshari
Ahmad Salehi Dobakhshari
SASadegh Azizi
Sadegh Azizi
ARAli Mohammad Ranjbar
Ali Mohammad Ranjbar
This paper presents a novel sectionalizing method for the build-up strategy in power system restoration. Power system restoration is the procedure of restoring power system elements after a partial or a complete blackout. Because of its economic and political importance, different strategies have been developed for a secure as well as fast restoration. One of the most practical and economical is the build-up strategy that includes the process of restoring separated parts (islands) in the power system and interconnecting them afterwards. This paper intends to develop a systematic algorithm for sectionalizing a power system considering various constraints such as black-start capability of generators, power supply-demand balance and independence of islands. Moreover, utilizing the Wide Area Measurement System (WAMS), each island will be fully observable in this method which is a crucial requirement for the restoration process. The New England 39 bus power system is used to demonstrate the proposed algorithm and verify the results. The proposed method is also applied to the IEEE 118 bus system as a large-scale power system to prove its capability in practical systems.

3 August 2020 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
ADAhmad Salehi Dobakhshari
Ahmad Salehi Dobakhshari
MAMohammad Abdolmaleki
Mohammad Abdolmaleki
VTVladimir Terzija
Vladimir Terzija
SASadegh Azizi
Sadegh Azizi
This paper intends to improve the accuracy of power system State Estimation (SE) by introducing a hybrid linear robust state estimator. To this end, automatic bad data rejection is accomplished through an M-estimator, i.e. a Schweppe-type estimator with Huber loss function. The method of Iteratively Reweighted Least Squares (IRLS) is used to maximize the likelihood function in the M-estimator. Leverage measurements are also treated by a simple yet effective formulation. To run the algorithm for real-world large-scale grids, cumbersome construction of the Jacobian matrix at each iteration is avoided. In addition, convergence to the local minima faced in the large-scale Gauss-Newton algorithm is not a concern as the proposed formulation is linear with no approximation. As observability and redundancy considerations mandate SE to take advantage of traditional SCADA measurements along with available PMU measurements, the linearity of the proposed SE formulation is guaranteed regardless of whether PMU-only, SCADA-only or hybrid SCADA/PMU measurements are utilized. In this regard, covariance matrix for measurements weights is derived for both types of measurements. Thanks to the linear formulation and therefore swiftness of the proposed algorithm, SE could be run for different power systems with a few up to thousands of buses.

7 August 2020 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
SASadegh Azizi
Sadegh Azizi
MSMingyu Sun
Mingyu Sun
GLGaoyuan Liu
Gaoyuan Liu
VTVladimir Terzija
Vladimir Terzija
This letter proposes a novel effective technique for estimating the rate of change of frequency (RoCoF) of the center of inertia (CoI) in power systems. To offer a holistic picture of the system's frequency response, the proposed technique requires local frequency at the point of measurement, only. This enables the local estimation of active power deficit following a loss of generation (LoG) event, thus facilitating fast and effective remedial action. The extensive number of simulations conducted verify the effectiveness and applicability of the proposed technique.

21 January 2019 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
ADAhmad Salehi Dobakhshari
Ahmad Salehi Dobakhshari
SASadegh Azizi
Sadegh Azizi
MPMario Paolone
Mario Paolone
VTVladimir Terzija
Vladimir Terzija
This paper presents a closed-form and non-iterative solution for the long-studied SCADA-based State Etimation (SE) problem, where unsynchronized traditional measurements from Remote Terminal Units (RTUs) are used. In this regard, a novel reformulation of the problem is introduced where unknowns are expressed as complex variables in terms of unsynchronized SCADA measurements. To this end, it is assumed that bus voltage amplitudes as well as current amplitudes and active and reactive power flows/injections are available. The resulting system of equations is solved by the classic linear weighted leastsquares method. In contrast to the traditional approaches, several drawbacks such as initialization and issues with convergence (especially for large-scale systems) are resolved. Moreover, the proposed approach does not use synchrophasors. The method is validated on a 3-bus test network and applied to the IEEE 118-bus test system, 1341-bus and 9241-bus European high-voltage transmission networks.

5 March 2020 in IET Generation, Transmission & Distribution
Verified
Journal Article
Open access
PDF file
ADAhmad Salehi Dobakhshari
Ahmad Salehi Dobakhshari
SASadegh Azizi
Sadegh Azizi
MAMohammad Abdolmaleki
Mohammad Abdolmaleki
VTVladimir Terzija
Vladimir Terzija
The accuracy of power system state estimation (PSSE), its robustness against bad data and the speed of its algorithm are crucial to economic and secure system operation. On the other hand, observability and redundancy considerations mandate PSSE to take advantage of traditional supervisory control and data acquisition (SCADA) measurements along with available phasor measurement unit (PMU) measurements. This set of hybrid PMU/SCADA inputs has traditionally made the problem formulation non‐linear, and hence time‐consuming to solve due to the iterative process of solution. This study addresses the foregoing challenges by proposing a novel linear least‐absolute‐value (LAV) estimation, without the need for an initial guess of the system state. The linearity of the proposed PSSE formulation is guaranteed regardless of whether PMU‐only, SCADA‐only or hybrid SCADA/PMU measurements are utilised. This facilitates the fast and non‐iterative solution of the LAV estimation of system state based on linear programming. The LAV estimator outperforms the weighted‐least‐squares estimator in dealing with erroneous measurements, by automatically rejecting bad data of any size. An extensive number of simulation studies carried out on test systems of different sizes confirm the superiorities of the proposed method in comparison with other existing PSSE methods.