Élio Vicentini

Élio Vicentini

Auto-generated profile, based on publicly available information

Élio Vicentini

Center for Engineering, Modeling and Applied Social Sciences, Federal University of ABC, Santo Andr, Brazil

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 May 2024 in IEEE Access
Verified
Journal Article
Open access
RVRenzo Vargas
Renzo Vargas
VBVictor Gabriel Borges
Victor Gabriel Borges
ÉVÉlio Vicentini
Élio Vicentini
RBRicardo Benedito
Ricardo Benedito
RSRicardo Caneloi Dos Santos
Ricardo Caneloi Dos Santos
JMJoel Melo
Joel Melo
The present paper proposes a new methodology to solve a problem in the literature in which a consumer becomes eligible for reactive power excess charging (RPEC) after installing a photovoltaic (PV) system, even if its reactive demand has not changed. This problem mainly affects this kind of consumer, which is known as PV prosumers, in countries where the power factor at the point of common coupling (PCC) is used as the main parameter in calculating reactive power excess charges instead of directly pricing the surplus reactive energy delivered from the distribution network. The classical approaches to reducing or eliminating RPEC are based on providing reactive power within the consumer’s installations from their PV inverters and their capacitor banks. However, the solutions presented require optimization studies since the costs of producing reactive energy can be even higher than the penalties involved. In this context, we developed a new hourly-based optimization model for the RPEC problem based on the variable neighborhood search meta-heuristic and the Fibonacci search method. In addition, we apply the proposed methodology to two medium voltage prosumers in Santo André, Brazil. The results showed the proposal’s effectiveness, mitigating RPEC and minimizing the prosumers’ electricity bills without installing new equipment to supply their reactive demand. The best results were found when reactive power was delivered by the capacitor bank and PV inverters simultaneously rather than applying these solutions separately. The proposed hourly-based correction method can help in day-ahead energy management, avoiding premature wear from switching the consumer’s reactive power compensation equipment switches. Also, the methodology proposal improved the power factor at the utility substation, which benefits the power distribution systems.