Bashar Sakeen Farhan

Bashar Sakeen Farhan

Auto-generated profile, based on publicly available information

Bashar Sakeen Farhan

Electrical department, Engineering Collage, AL-Iraqia University, Ministry of Higher Education, Baghdad, Iraq

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 March 2020 in IEEE Access
Verified
Journal Article
Open access
HHHabib Ur Rahman Habib
Habib Ur Rahman Habib
USUmashankar Subramaniam
Umashankar Subramaniam
AWAsad Waqar
Asad Waqar
BFBashar Sakeen Farhan
Bashar Sakeen Farhan
Kotb M. KotbKotb M. Kotb
Kotb M. Kotb
SWShaorong Wang
Shaorong Wang
The worldwide demand for reduction of CO2 pollution, with more penetration of renewable energy sources and an increased number of electric vehicles (EVs), demonstrates the importance of economic dispatch (ED) with taking into account the reduction of CO2 emission. ED is a classical problem in which EVs impose more penetration as a dynamic load, and its impact as vehicle-to-grid (V2G) is the possible future trend with cost minimization. Based on the integration of EVs and hybrid renewable sources concerning both economic dispatch and pollution minimization, the multi-objective function is converted into a single comprehensive objective by using the judgment matrix methodology. In this paper, the investigation involves the minimization of the cost of all three objectives viz. operation cost, pollution cost, and carbon emissions with ED by incorporating V2G technology. The algorithms which include particle swarm optimization, as well as artificial bee colony, are applied under various operation and control strategies. The proposed models are verified and analyzed with different case studies. In terms of operation economics, the simulation results validate the superior performance of EVs based microgrid (MG) model in the coordinated charging and discharging mode. Further, the comparison of both algorithms shows better results with the ABC algorithm in terms of cost minimization of all objectives. ABC is better in V2G based microgrid with coordinated charging and discharging mode while its performance is significant during a large number of EVs (i.e., 700 EVs). Moreover, the load shedding scenarios are integrated which enables the MG system to operate in dual mode (i.e., seamless transition). In this paper, the main contribution involves penetration of EVs as dynamic load and its V2G impact in a coordinated or uncoordinated way, application of ABC algorithm for this particular load problem with improved results, and inclusion of short-term load shedding scenarios.

5 September 2022 in IEEE Access
Verified
Journal Article
Open access
HHHabib Ur Rahman Habib
Habib Ur Rahman Habib
AWAsad Waqar
Asad Waqar
BFBashar Sakeen Farhan
Bashar Sakeen Farhan
TATanveer Ahmad
Tanveer Ahmad
MJMehdi Jahangiri
Mehdi Jahangiri
Yun-Su KimYun-Su Kim
Yun-Su Kim
In today’s transportation sector, the growing number of electric vehicles (EVs) is progressively replacing petroleum-fueled vehicles, which are also expected to minimize greenhouse gas emissions. The main problem with EVs is the requirement of charging energy, which is fed through distribution network, while simultaneously feeding already connected load. The EV’s integration with the distribution network will overload the network due to EV’s charging load, which will eventually trip the power system protection. In this context, it is necessary to minimize power losses, improve voltage profile with sustainable power supply network. Therefore, optimal placement of EVs is required in the distribution network. Conventionally, researchers have used DGs to minimize power losses and improve voltage profile. In this paper, authors analyzed the effect of EV’s integration with simultaneous placement of distributed generations (DGs). The integration of EVs with higher penetration of DGs is cumbersome due to higher power losses and voltage variances that are outside allowable boundaries. The optimal placement of EVs into the distribution system with higher penetration of DGs is proposed in this paper using a battle royale optimization (BRO) algorithm. Since it is a new problem on CIGRE network which is not discussed before. Hence, the authors compared results with three most famous algorithms namely genetic algorithm (GA), particle swarm optimization (PSO), and accelerated PSO (APSO). The optimization problem is developed as a multi-objective function while decreasing active and reactive power losses, and minimising maximum voltage deviation index. The studied distribution network is the CIGRE 14-bus medium voltage (MV) distribution network. Three case studies are taken in which EVs are integrated in two scenarios with optimally sized and located DGs systems in the CIGRE distribution network using MATLAB. Case-1 includes simple network with DGs integration. Case-2 includes EVs only in the simple network, and case-3 finally includes EVs and DGs for optimal placement with minimum losses. The placement of the EVs results in a decrease in power losses and voltage deviation indices. The bus voltages of case-2, on the other hand, stay unchanged when the EVs are integrated. Case 3 with BRO showed the large reduction in power losses owing to the addition of EVs to the distribution network with DGs (from 19.98 kW, and 19.89 kVar to 2.54 kW, and 3.35 kVar).

3 December 2020 in IEEE Access
Verified
Journal Article
Open access
HHHabib Ur Rahman Habib
Habib Ur Rahman Habib
SWShaorong Wang
Shaorong Wang
AWAsad Waqar
Asad Waqar
BFBashar Sakeen Farhan
Bashar Sakeen Farhan
Kotb M. KotbKotb M. Kotb
Kotb M. Kotb
Yun-Su KimYun-Su Kim
Yun-Su Kim
Battery manufacturing and recycling are expensive; combined heat and power (CHP) units are optimal for residential premises. CHP units can enhance energy efficiency and reduce energy costs, but appropriately sized units must be chosen. Here, we optimize CHP unit sizing to minimize the energy costs of residential areas. Sizing is based on both the electricity and heat loads; it is possible to optimally rate the various types of CHP units. We compare an artificial bee colony (ABC) optimization method to a genetic algorithm (GA) when various strategies are adopted. Electricity and heat loads are considered together when sizing CHP units and optimizing costs using the ABC algorithm and the GA. The optimization outcomes are compared to a base case; the ABC method performs better than the GA. The average daily energy cost savings possible using the ABC method were higher for all three seasons (by 25.9, 4.4, and 10.8% respectively) compared to those possible when residential premises lacked CHP units.