Large increases in nuclear generating capacity require cost analyses that connect reactor deployment, fuel cycle infrastructure, and time-dependent cost assumptions. This work presents the Workflow for Integrated Simulation and Economics (WISE), a Python-based workflow for evaluating dynamic nuclear fuel cycle costs from simulation outputs. WISE converts reactor deployment and material-flow histories into annual process requirements, determines non-reactor facility deployment, and aggregates operations and maintenance (O&M) costs, non-reactor facility and reactor overnight capital costs (OCCs), cumulative cost, and levelized cost of electricity (LCOE). The workflow is applied over 2025–2100 to two once-through (OT) scenarios, OT-Large and OT-SMR, and one Recycling scenario under a common nuclear generating capacity trajectory consistent with expansion to approximately 400 GW in the United States by 2050. The OT scenarios require fresh UO₂ fuel supply and direct used nuclear fuel disposal, while Recycling shifts part of the fuel cycle after midcentury toward recovered material, hot metal fuel fabrication, and high-level waste management. Using approximate representative data for this demonstration, by 2100, cumulative undiscounted total costs are $7.7 trillion, $9.2 trillion, and $9.6 trillion for OT-Large, OT-SMR, and Recycling, respectively, in 2025 USD. Reactor OCC is the dominant cost component in all scenarios. This work shows that WISE provides a consistent basis for evaluating how reactor and fuel cycle assumptions affect infrastructure requirements and costs.