1 April 2023 in International Journal of Electrical and Computer Engineering (IJECE)
Electricity is one of the essential sources for the daily basis activities. The continuous electricity supplied to the customers is one of the main goals for electricity provider. Reliability is one of the main aspects that is focused more on the planning of the power system especially in distribution network. The performance of reliability in the system is evaluated with three main reliability indices: system average interruption frequency index, system average interruption duration index, and customer average interruption duration index. These indices will only give information about the overall condition of the power system without showing the details about the specific of the consumers such as the amount interruptions experienced by customer in the system. In this paper, probability distribution function (PDF) observing the behavior of the components in the system is used in the reliability analysis. Weibull distribution, also known as Weibull family, is one of the most common PDF used in reliability analysis. As Weibull distribution is also related to several distributions, such as exponential and Rayleigh, these types of distributions are applied in the output reliability analysis to observe the performance of reliability in the system. IEEE 9-bus is used as distribution network and carried out using Monte-Carlo simulation.
1 December 2022 in Bulletin of Electrical Engineering and Informatics
This paper discusses the need for variance reduction in simulations in order to reduce the time required to compute a simulation. The large and complex network is commonly evaluated using a large-scale Monte Carlo simulation. Unfortunately, due to the different sizes of the network, it takes some time to complete a simulation. However, variance reduction techniques (VRT) can help to solve the issues. The effect of VRT changes the behaviors of a simulation, particularly the time required to run the simulation. To evaluate the reliability indices, two sequential Monte Carlo (SMC) methods are used. SMC with VRT and SMC without VRT are the two options. The presence of VRT in the simulation distinguishes the two simulations. Finally, reliability indices: system average interruption frequency index (SAIFI), system average interruption duration index (SAIDI), and customer average interruption duration index (CAIDI) will be calculated at the end of the simulation to determine the efficiency for the SMC with and without VRT. Overall, the SMC with VRT is more efficient because it is more convenient and saves time than the SMC without VRT.
1 December 2022 in International Journal of Electrical and Computer Engineering (IJECE)
Reliability assessment is a needed assessment in today's world. It is required not only for system design but also to ensure the power delivered reaches the consumer. It is usual for fault to occur, but it is best if the fault can be predicted and the way to overcome it can be prepared in advance. Monte Carlo simulation is a standard method of assessing reliability since it is a time-based evaluation that nearly represents the actual situation. However, sequential Monte Carlo (SMC) typically took long-time simulation. A convergence element can be implemented into the simulation to ensure that the time taken to compute the simulation can be reduced. The SMC can be done with and without convergence. SMC with convergence has high accuracy compared to the SMC without convergence, as it takes a long time and has a high possibility of not getting accurate output. In this research, the SMC is subjected to five different convergence items to determine which converge simulation is the fastest while providing better performance for reliability evaluation. There are two types of convergence positions, namely input convergence and output convergence. Overall, output convergence shows the best result compared to input convergence.