Biomass combined heat and power (CHP) generation is the more efficient use of biomass compared the direct combustion power generation. The techno-economic analysis of 30 MW biomass direct combustion power set’s modification for heat supply is investigated in this work. Three schemes are employed to provide the district heating supply, including low vacuum condenser, steam extraction, and turbine bypass. The low vacuum condenser approach is the most promising based on the techno-economic analysis. The calculated outlet pressure of the steam turbine, the power generation capacity, the heating supply and the maximum heating area are 30KPa, 27MW, 143.58GJ/h, and 900,000 m2respectively. The expected annual income of biomass combined heat and power plants amounts up to 7,422,700 RMB.
For the wind turbine wake field in the aeolian sand environment, the multiphase flow model is used to simulate the wind sand inflow and the wake of the wind turbine is simulated and calculated in combination with the actuation line model based on the OpenFOAM-v2006. The effects of clean air inflow and wind sand inflow on the wind turbine wake field are compared, including speed loss and wake structure. Equally the particle transport in the wake of wind turbine is analyzed. The results show that the velocity of wind turbine wake recovers faster in the aeolian sand environment, the overall spatial structure is sinking, and the particles will settle in advance and distribute in strips.
To facilitate the high-proportion integration of renewable energy, coal-fired power plants must further enhance their deep peak-shaving capabilities. Circulating fluidized bed (CFB) boilers exhibit strong potential for near-zero power output during hot standby operation, owing to their considerable thermal inertia. However, the operational characteristics of the thermal system under hot standby conditions remain insufficiently investigated, which significantly constrains the precise optimization of operational strategies. Therefore, a model coupled with EBSILON-Python was developed for a subcritical CFB unit to accurately quantify the influence of operational parameters on hot standby duration. The entire hot standby process was simulated, and the thermal parameter evolution and energy flow distribution were systematically analyzed. Performance indicators and a thermal system reconstruction method were proposed, and their influence mechanisms on operational performance optimization were thoroughly investigated. The results indicate that during constant-power hot standby operation, the consumption rate of in-furnace heat storage, as well as the heat flow rate of steam and feedwater, gradually increases over time, which is detrimental to sustaining long-term operation. Additionally, an increase in feedwater temperature by 165°C extends the hot standby duration by 83 minutes. Conversely, increasing the live steam flow rate from 10 t/h to 25 t/h reduces the hot standby duration by 132 minutes. Furthermore, feedwater heaters in the regenerative system exhibit a limited effect on the hot standby duration. This study provides a theoretical foundation and a technical pathway for optimizing hot standby strategies in CFB power plants.