Hongxia Guo

Hongxia Guo

Auto-generated profile, based on publicly available information

Hongxia Guo

School of Electric Power, South China University of Technology, Guangzhou 510640, Guangdong Province, China

Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 March 2020 in IEEE Access
Verified
Journal Article
Open access
ZRZhijun Ren
Zhijun Ren
HGHongxia Guo
Hongxia Guo
PYPing Yang
Ping Yang
GZGuanlin Zuo
Guanlin Zuo
Zhuoli ZhaoZhuoli Zhao
Zhuoli Zhao
Due to the random volatility, a large amount of renewable energy will bring challenges to the security and stability of distribution network. Comprehensive consideration of system economics, security and flexibility has become the focus of research on distribution network optimization planning under the new situation. For the flexible resource allocation problem of distribution network, this paper analyzes the supply and demand relationship of the flexibility of the distribution network, and establishes a bi-level operation-planning joint optimization model for flexible resources. In the operational layer, we not only introduce the insufficient flexibility rate as the evaluation index of system flexibility, but also introduce the network loss, the abandoned wind and solar energy in the economic penalty, aiming at optimizing the annual operating cost of the system. In the planning layer, we evaluate the system security by introducing the comprehensive security index of the system, aiming at optimizing the annual comprehensive cost of the system. In addition, this paper also considers the third-party companies' investment in energy storage system in the electricity market, and further analyses the impact of energy storage operation strategies under different investors on flexible resource allocation. In this paper, the particle swarm optimization algorithm is used to solve the bi-level allocation model. Finally, the IEEE 33-bus test system is used for verification and analysis of the case. The results verify the validity and rationality of the proposed bi-level allocation model.

3 September 2019 in Energies
Verified
Journal Article
Open access
PDF file
RGRui Gao
Rui Gao
HGHongxia Guo
Hongxia Guo
RZRuihong Zhang
Ruihong Zhang
TMTian MAO
Tian MAO
QXQianyao Xu
Qianyao Xu
PYPing Yang
Ping Yang
The electricity spot market is now being implemented in China. Demand response, as a kind of flexible resource, is also being studied and explored for the constructed power market. Among the many demand response applications, the virtual power plant (VPP) as an aggregator of distributed energy resources (DERs), receives ever-increasing attention. However, the participation manner and related impacts of the VPP to the electricity spot market are still unknown within the current power market rules. Under this background, obeying the present trading rules of China’s electricity spot market, a two-stage dispatching model with optimized bidding and operating strategy in the day-ahead (DA) and real-time (RT) market for the VPP is proposed. In the designed model, the conditional risk value (CVaR) is adopted to address the risk encountered by the uncertainty of the electricity spot market price. The impact of the user-side over-deviated revenue mechanism (UORM) of the China spot market on the income of the VPP in the DA and RT market is also analyzed. For a full evaluation, different coefficients for the influence of DA and RT risk, UORM, and energy storage system (ESS) are tested to investigate their respective impacts on the revenue of the VPP. The simulation cases prove that the proposed method is helpful for the VPP to optimize DERs’ output in the electricity spot market according to its own risk preference.

19 January 2017 in The Journal of Engineering
Verified
Journal Article
Open access
PDF file
SSSibo Song
Sibo Song
HGHongxia Guo
Hongxia Guo
PYPing Yang
Ping Yang
ZXZhirong Xu
Zhirong Xu
THTing He
Ting He
ZLZhilin Lu
Zhilin Lu
With the advancement of the electricity market reform process, the time scale of market transaction reduces, and the requirements of power systems have become more stringent. First, the rules and trends of deviation electric quantity assessment are expounded, and the demand response strategies are analysed, which include the autonomous power plant power allocation decision scheme, flexible load response analysis and energy storage regulation strategy to reduce punishment caused by the load forecasting error and to enhance the stability of the power system. An improved differential particle swarm optimisation algorithm is used to solve the demand‐side response strategy. The simulation results show that the demand response strategies of the autonomous power plant and flexible load with energy storage response can meet the demand of deviation electric quantity assessment, reduce the cost of power users, improve the real‐time balance of the power system and promote the stable development of the spot market.

1 June 2017
Verified
Conference Paper
Closed access
ZHZijian Huang
Zijian Huang
HGHongxia Guo
Hongxia Guo
PYPing Yang
Ping Yang
ZXZhirong Xu
Zhirong Xu
The electricity load of large consumers has the characteristics of fluctuating randomly in a short period and changing periodically over a longer time scale. In recent years, the influence of these kind of consumers on regional load has been increasing year by year, which has become an important factor to improve the forecasting accuracy of the entire load. In this paper, we use parameters-improved Support Vector Machine (SVM) with better learning capability based on small samples to fit the random fluctuations of these loads. Besides, we introduce a concept of similar time period in order to dig up the periodic trend shown in a long period of the loads. The simulation result of a typical large consumer shows a high forecasting accuracy of the load, which shows the effectiveness of the algorithm.

1 May 2007
Verified
Conference Paper
Closed access
GHGuo Hong-Xia
Guo Hong-Xia
WJWu Jie
Wu Jie
LYLiu Yong-Qiang
Liu Yong-Qiang
Reinforcement learning is used in permanent magnet linear motor control system in this paper. The proposed controller used the reinforcement signal from plant when the system model is unknown. The controller's parameters could be updated by use of adaptive heuristic assessment algorithm. The simulation results show that the proposed method can make the system have more dynamic performance and steady accuracy.