Izabela Dagmara Czabak-Górska

Izabela Dagmara Czabak-Górska

Auto-generated profile, based on publicly available information

Izabela Dagmara Czabak-Górska

Department of Management and Production Engineering, Opole University of Technology, Opole, Poland

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2021 in Expert Systems with Applications
Verified
Journal Article
Open access
KRKatarzyna Rudnik
Katarzyna Rudnik
GBGrzegorz Bocewicz
Grzegorz Bocewicz
AKAneta Kucińska-Landwójtowicz
Aneta Kucińska-Landwójtowicz
ICIzabela D. Czabak-Górska
Izabela D. Czabak-Górska

18 May 2023 in International Journal of Quality & Reliability Management
Verified
Journal Article
Closed access
AKAneta Kucińska-Landwójtowicz
Aneta Kucińska-Landwójtowicz
ICIzabela Dagmara Czabak-Górska
Izabela Dagmara Czabak-Górska
José Pedro Teixeira DominguesJosé Pedro Teixeira Domingues
José Pedro Teixeira Domingues
PSPaulo Sampaio
Paulo Sampaio
CCCarolina Ferradaz de Carvalho
Carolina Ferradaz de Carvalho
Purpose: The aim of the article is to determine research areas and to recognize the current direction in the development of maturity models, to indicate the key areas of organizational maturity models (OMMs) development and their classification as well as to pinpoint research gaps and areas of potential development of OMMs in the context of scientific research and the needs of management practitioners.Design/methodology/approach: The research was conducted using the literature review method, bibliometric analysis and visual mappings.Findings: The empirical classification developed in this paper identified 12 categories based on management areas, constituting the criteria for classifying OMMs models, where OMMs are being developed: Information Technology, Project Management, Business Management and Strategy, Human Resource, Ergonomics, Health and Safety Management, Industry 4.0 concept, Knowledge Management, Process Management, Performance Management, Quality Management, Supply Chain Management, Risk Management and Innovation Management.Research limitations/implications: The main limitation is the analysis in the scope of topic OMMs including solely the Scopus and Thompson Reuters Web of Science database. Another shortcoming is conducting data analysis and classification based on the abstracts of the selected articles.Originality/value: This work is a starting point to prospect trends for future revolving around the OMMs crossing different databases.

11 April 2023 in International Journal of Quality & Reliability Management
Verified
Journal Article
Closed access
AKAneta Kucińska-Landwójtowicz
Aneta Kucińska-Landwójtowicz
ICIzabela Dagmara Czabak-Górska
Izabela Dagmara Czabak-Górska
MLMarcin Lorenc
Marcin Lorenc
José Pedro Teixeira DominguesJosé Pedro Teixeira Domingues
José Pedro Teixeira Domingues
PSPaulo Sampaio
Paulo Sampaio
Purpose: The main purpose of this paper is twofold: to present a proposal for a model of educational quality management system within a process approach context for technical universities, and a conceptual model of a performance measurement system (PMS) towards the assessment of the quality level of management, core and support processes.Design/methodology/approach: The paper encompasses two main parts: a theoretical portion and a case study. Within the theoretical background, the authors discuss the issue of educational quality management supported on a process approach perspective as well as performance measurement system in high education (HE). The case study reports the development of the concept of performance measurement system for technical universities.Findings: The proposed system of educational quality management supported on a process approach, together with a conceptual model of the performance measurement system, can be implemented in every technical university. The identification of processes in the education quality management system permitted the development of the PMS. The model covers 32 key performance indicators (KPIs) for management processes, 39 for core processes and 19 for supporting ones.Research limitations/implications: The proposed performance measurement system is limited in its focus on educational processes and support of these processes. The evaluation of scientific and research activity and aspects related to financial resources is not pursued.Originality/value: Elaboration of a conceptual model of a performance measurement system towards the assessment of the quality level of management, core and support processes is dedicated to technical universities.

22 September 2017 in CBU International Conference Proceedings
Verified
Journal Article
Open access
PDF file
ICIzabela Dagmara Czabak-Górska
Izabela Dagmara Czabak-Górska
MLMarcin Lorenc
Marcin Lorenc
This article describes a procedure for identifying the phenomenon of ‘hidden factory’ based on classic and Six Sigma yields, a term attributed to wastefulness during production. The paper presents a study that aims to establish a method for improving the efficiency of production by eliminating this wastefulness. The first part of this article presents a synthesized review of the current literature regarding the negative influence of the ‘hidden factory’ on production efficiency. The theoretical considerations involve a case study with quantitative data collected from a metal foundry of Zawiercie in Poland, which specializes in producing iron castings, including connectors for water, gas, and vapor installations, as well as minor machine castings. The results indicate a hidden factory within this company’s production line. The analyzed example underlines the efficiency of the applied method for detecting the undesired phenomenon of the ‘hidden factory.'

12 June 2020 in Journal of Organizational Management Studies
Verified
Journal Article
Open access
AKAneta Kucińska-Landwójtowicz
Aneta Kucińska-Landwójtowicz
ICIzabela D. Czabak-Górska
Izabela D. Czabak-Górska
MLMarcin Lorenc
Marcin Lorenc

25 September 2018 in CBU International Conference Proceedings
Verified
Journal Article
Open access
PDF file
ICIzabela D. Czabak-Górska
Izabela D. Czabak-Górska
MLMarcin Lorenc
Marcin Lorenc
The purpose of the article is to determine the Type I error and Average Run Length values for charts and R, for which control limits have been determined based on the Skewness Correction method (SC method), with an unknown probability distribution of the qualitative feature being tested. The study also used the Monte Carlo Simulation, in which two sampling methods were used to obtain random input scenarios - matching theoretical distributions (selected skewed distributions) and bootstrap resampling based on a manufacturing company’s measurement data. The presented article is a continuation of Czabak-Górska's (2016) research. The purpose of the article was to determine Type I error value and ARL type A for chart and R, for which the control limits were determined based on the skewness correction method. For this purpose, measurement data from a company producing car seat frames. Presented case study showed that the chart determined using the skewness correction method works better for the data described by the gamma or log-normal distribution. This, in turn, may suggest that appropriate distribution was selected for the presented data, thanks to which it is possible to determine the course and nature of the process, which is important from the point of view of its further analysis, e.g. in terms of the process capability.