Omar G. Alsawafy

Omar G. Alsawafy

Auto-generated profile, based on publicly available information

Omar G. Alsawafy

King Fahd University of Petroleum & Minerals

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2021 in Renewable Energy
Verified
Journal Article
Closed access
AGAhmed Ghaithan
Ahmed Ghaithan
AHAhmad Al Hanbali
Ahmad Al Hanbali
AMAwsan Mohammed
Awsan Mohammed
AAAhmed Attia
Ahmed Attia
HSHaitham Saleh
Haitham Saleh
OAOmar Alsawafy
Omar Alsawafy

1 August 2021 in Energy
Verified
Journal Article
Closed access
AAAhmed Attia
Ahmed Attia
AHAhmad Al Hanbali
Ahmad Al Hanbali
HSHaitham Saleh
Haitham Saleh
OAOmar G. Alsawafy
Omar G. Alsawafy
AGAhmed M. Ghaithan
Ahmed M. Ghaithan
AMAwsan Mohammed
Awsan Mohammed

4 December 2023 in Journal of Quality in Maintenance Engineering
Verified
Journal Article
Closed access
AAAhmed Attia
Ahmed Attia
AAAhmad O. Alatwi
Ahmad O. Alatwi
AHAhmad Al Hanbali
Ahmad Al Hanbali
OAOmar G. Alsawafy
Omar G. Alsawafy
Purpose: This research integrates maintenance planning and production scheduling from a green perspective to reduce the carbon footprint.Design/methodology/approach: A mixed-integer nonlinear programming (MINLP) model is developed to study the relation between production makespan, energy consumption, maintenance actions and footprint, i.e. service level and sustainability measures. The speed scaling technique is used to control energy consumption, the capping policy is used to control CO2 footprint and preventive maintenance (PM) is used to keep the machine working in healthy conditions.Findings: It was found that ignoring maintenance activities increases the schedule makespan by more than 21.80%, the total maintenance time required to keep the machine healthy by up to 75.33% and the CO2 footprint by 15%.Research limitations/implications: The proposed optimization model can simultaneously be used for maintenance planning, job scheduling and footprint minimization. Furthermore, it can be extended to consider other maintenance activities and production configurations, e.g. flow shop or job shop scheduling.Practical implications: Maintenance planning, production scheduling and greenhouse gas (GHG) emissions are intertwined in the industry. The proposed model enhances the performance of the maintenance and production systems. Furthermore, it shows the value of conducting maintenance activities on the machine's availability and CO2 footprint.Originality/value: This work contributes to the literature by combining maintenance planning, single-machine scheduling and environmental aspects in an integrated MINLP model. In addition, the model considers several practical features, such as machine-aging rate, speed scaling technique to control emissions, minimal repair (MR) and PM.

1 November 2024 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
ZKZaid Khallaf
Zaid Khallaf
AAAdel Alshibani
Adel Alshibani
OAOmar Alsawafy
Omar Alsawafy
AMAwsan Mohammed
Awsan Mohammed
ABAbdulaziz Abdulrahman Bubshait
Abdulaziz Abdulrahman Bubshait


17 May 2025 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
OAO. Alsawafy
O. Alsawafy
MDM.N. Darghouth
M.N. Darghouth
AHA. Al Hanbali
A. Al Hanbali
AGA. Ghaithan
A. Ghaithan