Željana Novaković

Željana Novaković

Auto-generated profile, based on publicly available information

Željana Novaković

Mining and Metallurgy Institute Bor Alberta Ajnštajna 1 19210 Bor Serbia

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2025 in Bakar
Verified
Journal Article
Open access
STStefan Trujić
Stefan Trujić
AMAnđela Marinčić
Anđela Marinčić
ŽNŽeljana Novković
Željana Novković
BVBoško Vuković
Boško Vuković
Detailed geological and engineering-geological investigations of the coal zone and the Eastern field of the Gacko coal basin were carried out to provide reliable bases for mining design and operation of the Gacko thermal power plant. The investigations, carried out in accordance with the applicable regulations and project documentation, included 28 drillholes and a wide range of laboratory tests with the aim of defining the qualitative and quantitative parameters of coal and re-categorizing reserves to category A. Special emphasis was placed on the analysis of the stratification of coal seams and the characteristics of accompanying sediments, which is crucial for the selection of the optimal coal purification technology. The results obtained represent the basis for further classification of reserves, mining design and exploitation planning.

1 January 2024
Verified
Conference Paper
Open access
PDF file
VMVladan Marinković
Vladan Marinković
MMMiroslava Maksimović
Miroslava Maksimović
ŽNŽeljana Novaković
Željana Novaković
MSMilutin Strahinjić
Milutin Strahinjić
MJMilenko Jovanović
Milenko Jovanović
Interpretation of the deposit and its immediate surroundings through the corresponding blockmodel implies their division into blocks of regular dimensions. The size of a block depends on numerous factors of the mathematical-statistical nature, degree of complexity of the deposit geological structure, etc. In general, the blocks must not be too small, because in this way the errors and calculations of the total volume of mined space, and quality of useful and accompanying components ("estimates") increase, but they must not be too large either, because they must be adapted to the characteristics of the planned exploitation method.

1 January 2026 in Mining and Metallurgy Engineering Bor
Verified
Journal Article
Open access
PDF file
AMAnđela Marinčić
Anđela Marinčić
ŽNŽeljana Novković
Željana Novković
ISIvan Stojičić
Ivan Stojičić
Miljan GomilanovicMiljan Gomilanovic
Miljan Gomilanovic
NJNikola Jovanović
Nikola Jovanović
The Strmosten brown coal deposit, situated in the northern part of the Senje-Resavica Basin, has been the focus of long-term exploration to determine its reserves, quality, and geological framework. Investigations comprised field geological observations, drilling campaigns, underground workings, and laboratory analyses of collected samples. It was determined that the deposit includes multiple brown coal layers of variable quality developed within the Paleogene succession. Petrographic studies and huminite reflectance analysis reveal the presence of dull to semi-bright brown coals with an average huminite reflectance of 0.45%. The tectonic setting is complex, with pronounced fault structures affecting deposit continuity. Based on the processed data, assessments of on-balance and off-balance reserves, as well as potential mining conditions in the Rembas-Resavica Brown Coal Mine, were performed. The results provide a basis for further planning and economic evaluation of exploitation in the brown coal mine.

1 January 2025
Verified
Conference Paper
Open access
PDF file
VMVladan Marinković
Vladan Marinković
MMMiroslava Maksimović
Miroslava Maksimović
MJMilenko Jovanović
Milenko Jovanović
ŽNŽeljana Novaković
Željana Novaković
AMAnđela Maričić
Anđela Maričić
The Zn Pb Ribnik deposit is the last in a series of Šuplja Stijena-Đudjeve vode-Paljevine-Ribnik deposits going from the northwest to the southeast, and it is connected to all of them by an adit, which connects all four deposits of the "Šuplje Stijene" ore field. The Šuplja Stijena ore field is located on the Ljubišnja mountain. Geological investigations of lead and zinc mineralization in the Šuplja Stijena ore field were carried out over a long period of time, and resulted in the discovery of economically significant deposits: Šuplja Stijena (within which the East area, West area and Stara jama were opened), Đurđeve vode, Ribnik and Paljevine. The geological structure of the Ribnik deposit consists of andesites that are in direct contact with the Ladinian limestones.