Syed Sarmad Ali

Syed Sarmad Ali

Auto-generated profile, based on publicly available information

Syed Sarmad Ali

Department of Computer Science and Engineering, Beihang University, (BUAA), P.R.China

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 March 2023 in IEEE Access
Verified
Journal Article
Open access
SASyed Sarmad Ali
Syed Sarmad Ali
JRJian Ren
Jian Ren
KZKui Zhang
Kui Zhang
JWJi Wu
Ji Wu
CLChao Liu
Chao Liu
The software industry has rapidly expanded, and software development is now essential to the success of many multinational corporations. The demand for complex software systems has also dramatically increased. Effective software development is essential, given the limitations of resources such as money, time, and labor. The cost and effort calculations affect the development process and client needs. Project failure was usually caused by errors in job estimating. Underestimating could have severe repercussions, if the project’s budget ends up being more than anticipated. Project overruns, on the other hand, can also have a detrimental impact on how successfully software projects are finished. Researchers and experts in the field of software are investigating ways to keep management and development productivity at high levels. However, a stand-alone estimation has not produced any noteworthy research results. Over the last decade, the standalone estimating models have revealed inadequacies. Literature suggests opting ensemble models, would yield better results as compared to standalone models. We have proposed a heterogeneous ensemble effort estimation (EEE) model in this research. The proposed model is comprises of standalone estimating models such as 1) Use Case Point, 2) Expert Judgment (EJ) and 3)Artificial neural network (ANN). Finally, using linear combination rules, the effort of each unique base model is combined. We applied our ensemble model on the benchmark dataset i.e. ISBSG using three different variations to avoid biasness. Furthermore, trained models were applied on industry use-cases for cross-validation. The findings of this study demonstrated that, in comparison to stand-alone estimate strategies, the ensemble technique gave better estimation results.

27 October 2022
Verified
Conference Paper
Closed access
HUHamid Umer
Hamid Umer
AWAIS AHMEDAWAIS AHMED
AWAIS AHMED
FAFarman Ali
Farman Ali
SASyed Sarmad Ali
Syed Sarmad Ali
MKMunim Ali Khan
Munim Ali Khan
Waste management is a difficult problem for both developed and developing countries. One of the biggest problems is that trash cans in public areas often overflow long before the next scheduled cleaning. Waste management causes high levels of gases, insects, and houseflies, which can cause serious health problems. This study presents a systematic literature review on smart waste management using machine learning. With machine learning, the system may enhance waste disposal using the quickest route. The ML-IoT-based design incorporates equipment to determine the weight of the waste, which adjusts to the network environment and contains information regarding waste management. Comparing the studies are meant to give the reader a complete picture of the smart waste management domain.

1 November 2024 in Journal of King Saud University Computer and Information Sciences
Verified
Journal Article
Open access
SASyed Sarmad Ali
Syed Sarmad Ali
JRJian Ren
Jian Ren
JWJi Wu
Ji Wu
This investigation focuses on refining software effort estimation (SEE) to enhance project outcomes amidst the rapid evolution of the software industry. Accurate estimation is a cornerstone of project success, crucial for avoiding budget overruns and minimizing the risk of project failures. The framework proposed in this article addresses three significant issues that are critical for accurate estimation: dealing with missing or inadequate data, selecting key features, and improving the software effort model. Our proposed framework incorporates three methods: the Novel Incomplete Value Imputation Model (NIVIM), a hybrid model using Correlation-based Feature Selection with a meta-heuristic algorithm (CFS-Meta), and the Heterogeneous Ensemble Model (HEM). The combined framework synergistically enhances the robustness and accuracy of SEE by effectively handling missing data, optimizing feature selection, and integrating diverse predictive models for superior performance across varying project scenarios. The framework significantly reduces imputation and feature selection overhead, while the ensemble approach optimizes model performance through dynamic weighting and meta-learning. This results in lower mean absolute error (MAE) and reduced computational complexity, making it more effective for diverse software datasets. NIVIM is engineered to address incomplete datasets prevalent in SEE. By integrating a synthetic data methodology through a Variational Auto-Encoder (VAE), the model incorporates both contextual relevance and intrinsic project features, significantly enhancing estimation precision. Comparative analyses reveal that NIVIM surpasses existing models such as VAE, GAIN, K-NN, and MICE, achieving statistically significant improvements across six benchmark datasets, with average RMSE improvements ranging from 11.05% to 17.72% and MAE improvements from 9.62% to 21.96%. Our proposed method, CFS-Meta, balances global optimization with local search techniques, substantially enhancing predictive capabilities. The proposed CFS-Meta model was compared to single and hybrid feature selection models to assess its efficiency, demonstrating up to a 25.61% reduction in MSE. Additionally, the proposed CFS-Meta achieves a 10% (MAE) improvement against the hybrid PSO-SA model, an 11.38% (MAE) improvement compared to the Hybrid ABC-SA model, and 12.42% and 12.703% (MAE) improvements compared to the hybrid Tabu-GA and hybrid ACO-COA models, respectively. Our third method proposes an ensemble effort estimation (EEE) model that amalgamates diverse standalone models through a Dynamic Weight Adjustment-stacked combination (DWSC) rule. Tested against international benchmarks and industry datasets, the HEM method has improved the standalone model by an average of 21.8% (Pred()) and the homogeneous ensemble model by 15% (Pred()). This comprehensive methodology underscores our model’s contributions to advancing software project management (SPM) through advanced predictive modeling, setting a new benchmark for software engineering effort estimation.

18 December 2024 in Journal of Software: Evolution and Process
Verified
Journal Article
Closed access
SASyed Sarmad Ali
Syed Sarmad Ali
JRJian Ren
Jian Ren
JWJi Wu
Ji Wu
KZKui Zhang
Kui Zhang
LCLiu Chao
Liu Chao

2 August 2025 in VFAST Transactions on Software Engineering
Verified
Journal Article
Open access
PDF file
MIMahnoor Iftekhar
Mahnoor Iftekhar
SASyed Sarmad Ali
Syed Sarmad Ali
MMMuhammad Hussain Mughal
Muhammad Hussain Mughal
Efficient scheduling is a cornerstone of successful software project management, directly influencing delivery timelines, cost control, and resource utilization. However, inadequate scheduling methodologies remain a critical factor behind project delays and budget overruns, particularly in contexts requiring rapid deployment such as the COVID-19 pandemic. This study addresses the Software Project Scheduling Problem (SPSP) through a search-based approach leveraging metaheuristic optimization techniques. Specifically, we investigate the effectiveness of Genetic Algorithms (GA), Tabu Search (TS), and their hybridization, in comparison with alternative metaheuristics such as the Firefly and Dragonfly algorithms. The International Software Benchmarking Standards Group (ISBSG) dataset, comprising over 2,000 global software projects, is employed as the empirical basis for validation. The research design encompasses a comprehensive literature review, formulation of research questions, and systematic application of GA and GA–TS hybrid models. Experimental evaluation reveals that the hybrid approach achieves substantial improvements over standalone GA, with mean fitness values increasing by approximately 40% across 100 iterations (from 0.948 to 1.887 in the final 10 iterations). Furthermore, the hybrid model reduced convergence time by nearly 30%, enhanced resource allocation accuracy, improved project duration estimates by 25%, and lowered projected costs by 20%. These results demonstrate that the GA–TS hybrid consistently provides more robust, efficient, and reliable scheduling solutions. The findings contribute to both theory and practice by validating the superiority of hybrid metaheuristics in addressing the inherent complexity and nonlinearity of SPSP. They further highlight the potential of search-based techniques to improve real-world project management outcomes in dynamic and resource-constrained environments. Future research should extend this work by integrating additional metaheuristic combinations, incorporating uncertainty modeling, and testing across diverse datasets to generalize applicability and strengthen practical adoption.