Anna Laura Eusebi

Anna Laura Eusebi

Auto-generated profile, based on publicly available information

Anna Laura Eusebi

Department of Science and Engineering of Materials, Environment and Urban Planning-SIMAU, Marche Polytechnic University, Ancona, Italy

Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 May 2020 in Critical Reviews in Environmental Science and Technology
Verified
Journal Article
Closed access
ABAlice Botturi
Alice Botturi
EOEmine Gozde Ozbayram
Emine Gozde Ozbayram
KTKatharina Tondera
Katharina Tondera
NGNathalie I. Gilbert
Nathalie I. Gilbert
PRPascale Rouault
Pascale Rouault
FFFrancesco Fatone
Francesco Fatone
Combined sewer overflows (CSOs) are of major environmental concern for impacted surface waterbodies. In the last decades, major storm events have become increasingly regular in some areas, and meteorological scenarios predict a further rise in their frequency. Consequently, control and treatment of CSOs with respect to best practice examples, innovative treatment solutions, and management of sewer systems are an inevitable necessity. As a result, the number of publications concerning quality, quantity, and type of treatments has recently increased. This review therefore aims to provide a critical overview on the effects, control, and treatment of CSOs in terms of impact on the environment and public health, strict measures addressed by regulations, and the various treatment alternatives including natural and compact treatments. Drawing together the previous studies, an innovative treatment and control guideline are also proposed for the better management practices.

28 May 2019 in Journal of Chemical Technology & Biotechnology
Verified
Journal Article
Closed access
PDF file
FBFederico Battista
Federico Battista
NFNicola Frison
Nicola Frison
PPPaolo Pavan
Paolo Pavan
CCCristina Cavinato
Cristina Cavinato
MGMarco Gottardo
Marco Gottardo
David BolzonellaDavid Bolzonella
David Bolzonella


1 May 2019 in Applied Energy
Verified
Journal Article
Open access
SLS. Longo
S. Longo
MMM. Mauricio-Iglesias
M. Mauricio-Iglesias
ASA. Soares
A. Soares
Pablo CampoPablo Campo
Pablo Campo
FFF. Fatone
F. Fatone
AHA. Hospido
A. Hospido

1 June 2018 in Waste Management
Verified
Journal Article
Open access
DCD. Cingolani
D. Cingolani
FFF. Fatone
F. Fatone
NFN. Frison
N. Frison
MSM. Spinelli
M. Spinelli
AEA.L. Eusebi
A.L. Eusebi
Recovery of high quality water from municipal landfill leachate was studied by three-stage disc tube reverse osmosis optimized in pilot-scale. Following UF-membrane-assisted activated sludge plant, overall 46.5 tons of leachate were post-treated in real environment and analyzed for conventional contaminants and hazardous compounds (e.g. heavy metals, boron, selenium) throughout operation of membrane system. Operating pressure ranged from 21 to 76 bar, while permeate flux varied in the range 7.1-32.5 L m-2 h-1. Rejection factors of specific ions were related to the pressure and global removals were assessed for each stage (e.g. E%COD = 92.4-99.2%, E%NH4 = 46.2-95.8%, E%NOx = 84.8-97.9%; E%TDS = 88-95.5%). Boron removal was assessed in the range 34-48%, so as to require the third stage to reach standard for discharge or reuse. Two stages were sufficient to reach water recovery higher than 91%. Long-term operation and mathematical modeling demonstrated how the Δπ/ΔP ratio can support the decisions for membrane cleaning and predictive maintenance: permeability decline was associated to the ratio increase from 0.72 to 0.73 to 1.13-1.21.

1 December 2019 in Waste Management
Verified
Journal Article
Closed access
SPSilvia Palmieri
Silvia Palmieri
GCGiulia Cipolletta
Giulia Cipolletta
Carlo PastoreCarlo Pastore
Carlo Pastore
Chiara GiosuèChiara Giosuè
Chiara Giosuè
Çağrı AkyolÇağrı Akyol
Çağrı Akyol
FFFrancesco Fatone
Francesco Fatone