29 January 2020 in IEEE Systems Journal
Rare and extreme climate events may result in wide power outages or blackouts. The concept of power system resilience has been introduced for focusing on high-impact and low-probability (HILP) events such as a hurricane, heavy snow, and floods. Power system resilience is the ability of a system to reduce the likelihood of blackout or wide power outages due to HILP events. Indeed, in a resilient power system, as the severity of HILP events increases, the rate (but not the amount) of unserved loads diminishes. Suitable measures for managing power system resilience can be classified into three categories in terms of time, known as “resilience-based planning,” “resilience-based response,” and “resilience-based restoration.” The most widely used approaches, methods, and techniques in each of these categories, as well as the future trends for improving the power system resilience are reviewed in this article. The challenges of resilience in power systems with high penetration of renewable energy sources are also discussed in each of these categories.
1 October 2014 in IET Generation, Transmission & Distribution
Hybrid AC–DC microgrid is introduced as the future distribution network to utilise both benefits of alternative and direct currents. In such hybrid microgrid, AC and DC loads, renewable‐based distributed generators (DGs), controllable DGs and energy storage systems are connected through separate AC and DC links. An up–down operation model of such hybrid microgrid is proposed which consists of system‐ and device‐level. In the system‐level, a mixed integer linear model is suggested to balance the generation and load considering the interconnection of AC and DC subgrids for minimising total operating cost of the system in a 24‐hour period. In the device‐level, a controller is suggested for power converter‐based resources (i.e. intergrid inverter and battery) for controlling the voltage variations in AC and DC subgrids. The effectiveness of the proposed up–down operation model is demonstrated through simulation studies on a test hybrid microgrid.
1 December 2015 in IET Generation, Transmission & Distribution
In this study, a hierarchical decision making framework for operation of active distribution grids (ADGs) in which distribution company (Disco) and microgrids (MGs) cooperate with each other is modelled. Since there are several MGs, which may have independent decision makers, in ADGs, two levels of decision makers are considered in this framework. The mentioned framework is modelled as a bi‐level optimisation problem in which Disco and MGs are considered as the leader and the followers, respectively. The resulting model is a non‐linear bi‐level problem which is transformed into a linear single‐level problem through Karush–Kuhn–Tucker conditions and dual theory. To evaluate the effectiveness of the model, a hypothetical distribution grid is considered as the case study.
17 October 2017 in IEEE Transactions on Sustainable Energy
This paper investigates the impacts of integrating non-deterministic flexible ramp reserves in a multi-stage multi-resolution day-ahead robust unit commitment to cope with vari-ability of renewable energy sources (RES). While the common literature considers deterministic forms of flexible ramp reserves, the proposed affinely adjustable robust UC (AARUC) model considers explicit endogenous up and down sub-hourly ramp reserve deployment to effectively allocate flexible ramp capacities. In addition, unlike the conventional non-causal two-stage robust unit commitment models that immunize solutions against worst economic scenario with the dependency of decisions on the future information of uncertainty, the current non-conservative multi-stage model optimizes hourly commitment and dispatch schedul-ing for the base-case scenario, while ensuring that the specified sub-hourly causal ramp reserves can be adaptively adjusted. Moreover, dimensionality limitations of the conventional duality-based affinely adjustable robust optimizations (D-AARO) are resolved. The effectiveness of the proposed model compared with conventional robust unit commitment frameworks is extensively illustrated on the IEEE 24-bus reliability test system and the IEEE 118-bus test system.
25 April 2017 in IEEE Transactions on Smart Grid
One of the distribution network operators’ (DNOs’) responsibilities is to design distribution networks in order to reliably and efficiently meet a portfolio of demands with different attributes. The advent of plug-in electric vehicles (PEVs) introduces a number of new network players such as girdable parking lot owners (GPLOs), which might have conflicting objectives with DNO’s ones. This paper presents a dynamic bi-level model for distribution network planning (DNP) considering different objectives of DNO and GPLO. The power injection capability of gridable parking lots (GPLs) is employed as an alternative supply source to enhance the network flexibility in supplying loads under faulty conditions. Moreover, the proposed planning approach is developed in a way that the economic risk of the plan associated with the stochastic nature of the GPL behavior is controlled. Different test networks are used to validate the effectiveness of the proposed model.
1 February 2018 in Energy