This paper analyzes the foundation pit of Gen Shan East Road through tunnels under the river. The results show: When digging to the bottom, the maximum horizontal displacement of the wall is located at 2 ~ 4 m above the bottom of the pit, and the maximum value is 0.57‰ ~ 0.64‰H. The surface subsidence is mainly of groove type. The maximum surface settlement is 0.107%H. The mean value of the maximum surface settlement is about 0.91 times the maximum horizontal displacement of the wall, and the maximum surface settlement is between 0.58 and 1.91 times the maximum horizontal displacement of the wall.
The paper takes Genshan Road crossing River tunnel as the research object and analyzes the measured data of surface settlement when the shield tunnel passes through the levee. The results show: the ratio of the settlement value to the total settlement is relatively large in the two stages of the passage of the shield and after the passage of the shield, which is 44.5% and 25.5%, respectively. The influence range of shield tunnel construction on levee settlement is 2.3D (D is the tunnel diameter of 14.5m).