To reveal the differences in stratum response among different environmental sections and the influences of key construction parameters on deep soil deformation during river-crossing double-line shield tunneling, the paper takes the East Genshan Road River-Crossing Tunnel as the engineering case, and systematically investigates the stratum responses of the onshore and riverbed sections as well as the effects of construction parameters via field monitoring, measured construction parameter data and three-dimensional finite element simulation based on ABAQUS. The simulation results suggest that, compared with the onshore section, the riverbed section may present larger cumulative displacement, more intense deep soil response and a wider influence range of transverse settlement under the investigated high-water-pressure and saturated soft-soil conditions. These differences are more reasonably interpreted as the combined effects of burial depth, stratum composition, mechanical properties, hydraulic boundary conditions, surface boundary constraints and overburden conditions. Among these factors, the high-water-pressure and saturated soft-soil environment may contribute to the enhanced disturbance diffusion and cumulative deformation response observed in the riverbed section. The longitudinal displacement evolution of the riverbed section presents obvious stratified transmission characteristics, and its transverse settlement trough shows a typical double-peak W-shaped distribution with larger peak values, wider trough profile and slower far-field attenuation. The single-factor parametric analysis suggests that, within the investigated parameter ranges, cutterhead torque produced the largest absolute settlement variation, followed by total shield thrust and tunneling speed. The results of this study can provide a reference basis for settlement control and construction parameter optimization of river-crossing double-line shield tunneling in high-water-pressure and saturated soft soil strata.

14 February 2023
Verified
Book Chapter
Open access
PDF file
LSLingChao Shou
LingChao Shou
HZHeQuan Zhao
HeQuan Zhao
XSXiaoBo Sun
XiaoBo Sun
JPJin Pang
Jin Pang
TBTing Bao
Ting Bao
LWLifeng WANG
Lifeng WANG
This paper analyzes the foundation pit of Gen Shan East Road through tunnels under the river. The results show: When digging to the bottom, the maximum horizontal displacement of the wall is located at 2 ~ 4 m above the bottom of the pit, and the maximum value is 0.57‰ ~ 0.64‰H. The surface subsidence is mainly of groove type. The maximum surface settlement is 0.107%H. The mean value of the maximum surface settlement is about 0.91 times the maximum horizontal displacement of the wall, and the maximum surface settlement is between 0.58 and 1.91 times the maximum horizontal displacement of the wall.