20 October 2021 in IEEE Transactions on Power Systems
This work develops a mathematical formulation to determine the combinatorial search space of the Offshore Wind Transmission Optimization Problem (OWTOP). The model accounts for Capital Expenditures (CAPEX), Corrective Maintenance (CM), losses and Expected Energy Not Transmitted (EENT) and determines the optimal radial transmission system topology to connect a number of Offshore Wind Power Plants (OWPPs) to the shore. The model also considers the stochastic nature of wind. In this context a greedy search algorithm is developed capable of finding the globally optimal solution for the location of offshore substations (OSSs), sizing of the transmission infrastructure and topological layout. Rather than a single optimal solution, the algorithm finds a solution space of feasible topologies, bounded from below by the optimal radial solution. The algorithm is applied to 4 test cases including one based on the Belgian North Sea area. It is shown to outperform a traditional Transmission Network Expansion Problem (TNEP) formulation both in computational speed and solution quality.
14 July 2022 in Electric Power Systems Research
26 June 2023 in IEEE Transactions on Energy Markets, Policy and Regulation
This work examines the generation and transmission expansion planning problem of offshore grids under different market clearing mechanisms: a home market design, a zonally cleared offshore bidding zone and a nodally cleared offshore bidding zone. It aims at answering two questions. Is knowing the market structure a priori necessary for effective generation and transmission expansion planning? And which market mechanism results in the highest overall social welfare? To this end, a multi-period, stochastic generation and transmission expansion planning formulation is developed for both nodal and zonal market designs. The approach considers the costs and benefits among stake-holders of hybrid offshore assets as well as gross consumer surplus. The methodology is demonstrated on a North Sea test grid based on projects from the European network of transmission system operators' ten-year network development plan. An upper bound on potential social welfare in zonal market designs is calculated and it is concluded that from a generation and transmission perspective, knowing the market structure a priori is not strictly necessary but planning under the assumption of a nodal offshore bidding zone is recommended as it results in the highest overall social welfare and best risk adjusted return.