1 December 2006 in Journal of Construction Engineering and Management
The demand for urban underground space has been increasing in the past decades to create living space and to avoid traffic congestion. A critical concern during the design and development of the underground space is the influence of construction-related ground movements on neighboring facilities and utilities. Currently, engineers can estimate ground movements using a combination of semiempirical methods and numerical model simulation. However, these advanced analyses require accurate as-built construction staging data, which most projects lack. The traditional approach of collecting construction-staging data is both labor intensive and time consuming. This paper explores the use of three-dimensional laser scanning technology to accurately capture construction activities during development of an urban excavation. The paper describes the planning, execution, and data processing phases of collecting accurate construction as-built staging information over a period of 4 months at an urban excavation site in E...
1 May 2010 in Journal of Computing in Civil Engineering
This paper presents an information-technology-based collaboration framework that facilitates disaster response operations. The collaboration framework incorporates a web collaboration service, radio frequency identification (RFID) tags, a building blackbox system (BBS), a geo-database, and a geographic information system (GIS). Through the integration of these technologies, the framework provides a collaboration medium for first responders, including civil engineers, to cohesively respond to disasters. Access to critical building information, such as construction documents, through the BBS supports assessments of building integrity during disaster response. Building assessment information is stored on RFID tags, which are accessible to first responders through digital devices via a wireless ad hoc network. With on-site assessment information shown on a digital map, decision makers locate, collect, and distribute critical resources through the GIS to first responders. In addition, the decision makers at di...
1 September 2009 in Journal of Construction Engineering and Management
An increasing volume of highway repair and construction work is being performed during the off-peak nighttime hours to mitigate the impact of construction-related daytime traffic congestions and shorten the duration of construction operations. The utilization and placement of light towers to illuminate the work zone in this type of construction can cause harmful levels of glare for both drivers and construction workers. This paper presents the results of field experiments which were conducted to (1) study the levels of glare and lighting performance generated by light towers in and around nighttime work zones; (2) analyze the combined impact of the light tower set up parameters including its height as well as its aiming and rotation angles on glare and lighting performance; and (3) provide practical recommendations to reduce and control lighting glare in and around nighttime work zones. The results of these experiments confirm that the set up of light towers has a significant impact on glare and therefore it should be carefully designed and executed on nighttime highway construction projects to ensure the safety of the traveling public as well as construction workers.