HW/SW interface synthesis plays an important role in systems-on-chip design. In this paper, we propose a new HW/SW interface synthesis design method aiming at the Nios-based SoC platform. Our main motivation is to separate the consideration of interface circuits from HW/SW modules design, leaving SW modules in the Nios processor and HW modules in the FPGA as peripherals. Different interface circuits will be kept as templates in interface library customized for different bus structures and transfer modes. When interface synthesizing, HW modules themselves are left with no changes; they only need to select different interface templates from the library according to the structure and transfer mode of the bus they connect to. The experimental results show this design methodology can efficiently solve the HW/SW interface synthesis problems on the Nios platform mentioned above well.
The development of a new power system and electricity spot market has brought about significant changes in China's power system, affecting its planning, dispatching, and operation. However, the current single-electricity energy price system cannot adapt to the changing function and role positioning of the power system, causing difficulties in the normal production and operation of traditional generation sources. To address this challenge and ensure the long-term abundance of power generation capacity, a compatible electricity price system that includes a cost recovery mechanism for power generation capacity is urgently needed. This study proposes a power generation capacity payment mechanism that is adapted to the early stage of the development of the new power system, and analyzes the models, methods, and key elements of the mechanism. The analysis shows that the proposed mechanism can fully reflect the value of different capacity resources, provide reliable capacity for the system, facilitate the recovery of fixed costs, and play a positive role in ensuring the long-term abundance of power generation capacity. This contribution is crucial for the successful reform and development of China's power system.