1 November 2015 in Construction and Building Materials
29 January 2015 in Technological and Economic Development of Economy
Risk management is an important field of construction industry and has gained more importance internationally due to the latest researches carried out on a large scale. However, this relatively new field requires more attention to bring some benefit. Construction projects are facing a number of risks which have negative effects on project objects such as time, cost and quality. This study is based on findings of a questionnaire-based survey on risk management in construction projects in Pakistan, reporting the significance of different type of risk, ultimate responsibility for them and the effectiveness of some most common risk management techniques practiced in the industry. Two types of risk management techniques were considered: preventive techniques which can be used before the start of a project to manage risks that are anticipated during the project execution; and remedial techniques that are used during the execution phase once a risk has already occurred. The study revealed that financial issues for projects, accidents on site and defective design are the most significant risks affecting most of construction projects. As further reported, the contractor is responsible for management of most risks occurring at sites during the implementation phase, such as issues related to subcontractors, labour, machinery, availability of materials and quality, while the client is responsible for the risks such as financial issues, issues related to design documents, changes in codes and regulations, and scope of work. Further reported results of the analysis demonstrate that the production of proper schedule by getting updated data of the project and guidance from previous similar projects are the most effective preventive risk management techniques while close supervision and coordination within projects are the most effective remedial risk management techniques. It may be concluded that the most significant risks must be managed with greater effort to reduce/eliminate their effects on the project. As the study concludes, preparation of a proper schedule and good coordination during the implementation stage are very important as they may help project managers to focus on critical areas for better management of projects in Pakistan.
10 May 2019 in Materials and Structures
1 July 2018 in Construction and Building Materials
1 January 2015 in Procedia Engineering
As known, with addition of fibers to concrete, the properties of concrete are altered. Steel fiber is one of the common fiber used in concrete. Using lightweight concrete is extremely important for reducing the self-weight of structures, especially in heavy ones, like high rise buildings. It enables to decrease additional loads in case of renovation or/strengthening of existing structures. Moreover, self-compaction avoids using vibrations for compaction of concrete in existing structures. Therefore the present study is aimed at investigating the effect of change in micro steel fiber content on the properties of high strength steel fiber reinforced lightweight self-compacting (HSLSCC). For this reason slump flow test was conducted to find workability of the fresh concrete mixture. Further compressive strength, splitting tensile strength, modulus of elasticity and flexural strength of the hardened concrete were tested. Four concrete mixes of HSLSCC with different fiber contents were prepared to study the change in its fresh and hardened properties. Results show that there is strong influence on workability of SCC with steel fiber content of 1% or more. There is around 7% reduction in compressive strength, 18% and 70% increase in splitting tensile strength and flexural strength respectively, with increase of steel fiber content from 0.5% to 1.25%, while the modulus of elasticity remains almost the same
1 June 2016 in Materials & Design