1 April 2018 in Nuclear Engineering and Technology
24 June 2021 in Science and Technology of Nuclear Installations
Pyroprocessing is being developed at Korea Atomic Energy Research Institute (KAERI), and in recent years, all process equipment required for integrated processes have been examined in the PyRoprocess-integrated Inactive DEmonstration (PRIDE) facility. Based on the successful operation of a pilot-scale facility, a conceptual design for this scale-up facility was actualized. Implementing a “demonstration-scale” hot cell facility is challenging as it is intended to supersede PRIDE and satisfy the increased requirements of larger-scale facilities. This study focused on an inerting strategy for a larger-scale (demonstration-scale) hot cell facility to achieve conditions equivalent to those in a pilot-scale gas-tight argon cell facility. The study applies the inerting strategy to a demonstration-scale hot cell facility beyond that of the currently existing pilot-scale hot cell facility and performs computational fluid dynamics (CFD) simulation with various flow rates to determine an appropriate approach for inerting the target facility. To this end, practical constraints on the simulation are introduced based on experiences from the existing pilot-scale facility. The results show that the purging flow rate should be accurately predicted, and a variable flow rate should be applied to achieve hot cell inerting effectively. The required purging time and amount of inerting source are essential factors in the larger-scale hot cell facility. The study results can be helpful in the design of large hot cell facilities operated under inert conditions.
16 July 2019 in Science and Technology of Nuclear Installations
For most of the remote maintenance activities of equipment in a hot cell, replacing breakdown modules is preferred over in situ repair because of insufficient space in the cell and the limited operability of remote handling tools. In such cases, the maintenance operation can be decomposed into transport of the new modules to the failed equipment, replacement of the broken modules with new ones, and then transport of the broken parts to the reserved space for further repair or disposal. In this respect, transfer is the most basic operation during remote maintenance, which is also true for the maintenance of pyroprocessing equipment. Hence, this paper proposes a maintenance automation framework for automated pyroprocessing equipment from the standpoint of module transfer. For the maintenance automation framework, maintenance-related functions and events are defined, and they are integrated with the pyroprocess automation framework. The proposed framework is verified by a case study on the maintenance of a large module through a hardware-in-the-loop simulation.
7 March 2025 in Nuclear Engineering and Technology