Petro Shcherbakov

Petro Shcherbakov

Auto-generated profile, based on publicly available information

Petro Shcherbakov

NTU Dnipro Polytechnic, Dnipro

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2021 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
PSPetro Shcherbakov
Petro Shcherbakov
STSvitlana Tymchenko
Svitlana Tymchenko
MBMarat Bitimbayev
Marat Bitimbayev
Nurzhigit SarybayevNurzhigit Sarybayev
Nurzhigit Sarybayev
SMSerik Moldabayev
Serik Moldabayev
Purpose is to determine a function of the reduced expenditures connected with drilling-and-blasting operations, loading and hauling operations, and rock fragmentation depending upon the cost of machine-shift of the applied facility, its operation modes, hardness of rock being blasted, cost of the used explosive, and rock fragmentation quality based upon the developed optimization mathematical model. Methods. Method of statistical evaluation of natural blockiness structure of the rock as well as quality of its fragmentation by means of explosive energy has been applied. Statistical studies have been carried out concerning the basic indices of rock fragmentation depending upon its largeness and block hardness. Purposely-designed experimental equipment has been applied for sampling analysis of the rock fracturing in the process of its drilling by means of rotary drilling rig. The abovementioned supported representativeness of the sampling. Findings. Statistical distributions of the rock blockiness structure in terms of each bar length involving its place within the drilling assembly as well as in terms of the well depth have been compiled. Visual comparison of experimental data and theoretical data has helped determine that the statistical distributions of natural blockiness structure of the rock have the closest correlation with gamma distribution which differential function has two positive parameters. Statistical dependence has been defined between drilling-and-blasting results and the total expenditures connected with hard rock mining. Originality. A concept of oversize crushing coefficient has been introduced; its statistical dependence upon the mined rock hardness and specific consumption of the applied explosive has been derived. An alternative has been proposed concerning changes in parameters of the differential function of the assumed gamma distribution relative to the predicted granulometric composition of rock mass. Practical implications. Economic and mathematical model has been developed involving a target function of the total expenditures connected with the listed operations as well as a set of constraints avoiding incorrect decisions. The optimization method makes it possible to control drilling-and-blasting parameters at each stage of hard rock mining.

30 August 2024 in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
Verified
Journal Article
Closed access
PSP Shcherbakov
P Shcherbakov
STS Tymchenko
S Tymchenko
SMS Moldabayev
S Moldabayev
Nurzhigit SarybayevNurzhigit Sarybayev
Nurzhigit Sarybayev
DKD Klymenko
D Klymenko
NUN Ulanova
N Ulanova
Purpose. To create a device for weighing mining rock loaded into the body of a dump truck after each cycle of its excavation. To develop a mathematical block for calculating the net mass of the rock without taking into account extraneous factors affecting the accuracy of the obtained result. To provide operational control of the nominal load of the dump truck by the driver and excavator operator. Methodology. The methodological basis for solving the task is a comprehensive approach which includes electronic modeling of technical processes, methods of mathematical statistics, analysis of results in a mathematical package and their applied application. Findings. A functional and principled electrical diagram of the device for weighing the mining rock loaded into the body of a dump truck and transferring the final information to this excavator has been compiled. A mathematical block of the device was created, capable of memorizing the signals received from the primary information sensors before weighing, and subtracting them from the signals received from these sensors after each weighing cycle. As sensors of primary information, it is proposed to use selsyns, which are part of the transformer mode, which are mass-produced by the industry, reliable in operation and easy to maintain. Originality. The proposed device is made at the level of the invention; its priority is determined by the constructive development and technical solution. Namely, the device is equipped with a multistable memory transformer, to the erasing winding of which a tachogenerator (or tachometer generator) is connected through an amplifier, a chain of series-connected trigger, multivibrator waiting and key, whose output is connected to the recording winding of the multistable memory transformer, as well as the transformer connected to the input winding of the multistable memory transformer. Moreover, the storage capacitor is connected to one of the key inputs, and the input windings of the transformer are connected to the weight sensor. Practical value. The use of the presented device allows for operational control of the nominal load of the dump truck, objective accounting of transported cargo and realized labor costs, as well as for applying optimal maintenance of cargo and transport works in quarries. In the future, this device will form the basis of a radio telemetry system for dispatching the operation of dump trucks.

6 June 2023 in Математичне моделювання
Verified
Journal Article
Open access
PDF file
СВС.ф. Власов
С.ф. Власов
СТС.є. Тимченко
С.є. Тимченко
ДКД.в. Клименко
Д.в. Клименко
ПЩП.м. Щербаков
П.м. Щербаков
Розглянута математична модель, що пояснює виникнення зони чистого цементу при закріплені дисперсної породи струменями високого тиску. На підставі розглянутої моделі зроблений висновок щодо лінійної залежності тиску подачі закріпляючого розчину і товщини зони чистого цементу навколо закріпленого елементу. Вважаючи породу ізотропним середовищем, потовщення струменя можна описати звичайним диференційним рівнянням. Якщо знехтувати величинами першого і другого порядку малості, можна у першому наближенні оцінити величину товщини зони чистого цементу. При цьому різниця між теоретичними та експериментальними результатами в середньому не перевищує 16 %. Можна зробити висновок, що товщина зони чистого закріплюючого розчину при збільшенні тиску подачі розчину збільшується за лінійним законом і коефіцієнт кореляції між розрахунковими і експериментальними значеннями становить 0,97. Даний ефект цікавий тим, що оболонка з чистого цементного розчину на порідно-розчинному елементі покращує його фільтраційні властивості, що необхідно враховувати при створенні протифільтраційних завіс струменями високого тиску, що закріплюють речовини. Внаслідок того, що оболонка з чистого цементного розчину на закріпленому елементі покращує його фільтраційні властивості, можна або економити закріплюючі матеріали, або підвищувати фільтраційні властивості ПФЗ.

23 December 2023 in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
Verified
Journal Article
Open access
PSP Shcherbakov
P Shcherbakov
STS Tymchenko
S Tymchenko
SMS Moldabayev
S Moldabayev
MAM Amankulov
M Amankulov
Dmytro BabetsDmytro Babets
Dmytro Babets
New+Mining +https://doi.org/10.33271/nvngu/2023-6 +/jdownloads/pdf/2023/6/06_2023_contents-en-GB.pdf