Joshua Nsiah Addo Ofori

Joshua Nsiah Addo Ofori

Auto-generated profile, based on publicly available information

Joshua Nsiah Addo Ofori

Georgia Institute of Technology

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 December 2023 in Built Environment Project and Asset Management
Verified
Journal Article
Closed access
IAIsaac Akomea-Frimpong
Isaac Akomea-Frimpong
Xiaohua JinXiaohua Jin
Xiaohua Jin
Robert Osei-KyeiRobert Osei-Kyei
Robert Osei-Kyei
PTPortia Atswei Tetteh
Portia Atswei Tetteh
Roksana Jahan TumpaRoksana Jahan Tumpa
Roksana Jahan Tumpa
FPFatemeh Pariafsai
Fatemeh Pariafsai
Purpose: The application of circular economy (CE) has received wide coverage in the built environment, including public-private partnership (PPP) infrastructure projects, in recent times. However, current studies and practical implementation of CE are largely associated with construction demolition, waste and recycling management. Few studies exist on circular models and success factors of public infrastructures developed within the PPP contracts. Thus, the main objective of this article is to identify the models and key success factors associated with CE implementation in PPP infrastructure projects.Design/methodology/approach: A systematic review of the literature was undertaken in this study using forty-two (42) peer-reviewed journal articles from Scopus, Web of Science, Google Scholar and PubMed.Findings: The results show that environmental factors, sustainable economic growth, effective stakeholder management, sufficient funding, utilization of low-carbon materials, effective supply chain and procurement strategies facilitate the implementation of CE in PPP infrastructure projects. Key CE business models are centered around the extension of project life cycle value, circular inputs and recycling and reuse of projects.Research limitations/implications: Although the study presents relevant findings and gaps for further investigations, it has a limited sample size of 42 papers, which is expected to increase as CE gain more prominence in PPP infrastructure management in future.Practical implications: The findings are relevant for decision-making by PPP practitioners to attain the social, economic and environmental benefits of transitioning to circular infrastructure management.Originality/value: This study contributes to articulating the key models and measures toward sustainable CE in public infrastructure development.

11 February 2025 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
JOJoshua Nsiah Addo Ofori
Joshua Nsiah Addo Ofori
MTMariam Tomori
Mariam Tomori
OOOmobolanle Ogunseiju
Omobolanle Ogunseiju
Purpose: Exoskeletons have the potential to alleviate musculoskeletal disorders (MSDs), increase productivity and ultimately reduce construction project costs, but the concerns about their ethical, social and psychological risks for the construction industry are unknown. This paper investigates these risks and their implications for exoskeleton acceptance.Design/methodology/approach: Participants performed masonry tasks without an exoskeleton and with an active and passive exoskeleton. Using descriptive and inferential statistics, ethical, social and psychological risks associated with exoskeletons, as well as their trust levels, were assessed. Objective data were procured to determine stress and productivity levels with and without these exoskeletons, while subjective data included trust and the ethical and social risks of the exoskeletons.Findings: The findings show that lack of informed consent and procuring sensitive health data is an important ethical consideration when using active and passive exoskeletons. Regarding social risks, unequal access to exoskeletons, exoskeleton sharing and exoskeleton costs as major concerns. Furthermore, the findings revealed statistical differences between active and passive exoskeletons in terms of certain social risks. The findings show that participants believed in passive exoskeletons more than active exoskeletons. The results also revealed a strong positive relationship between ethical and social risks, and trust levels. The results also indicated that both exoskeletons induce relatively moderate stress levels and enhance productivity, compared to the no exoskeleton condition.Originality/value: This study is one of the few empirical investigations in the construction industry on the ethical and social risks associated with exoskeletons, which can facilitate the adoption of exoskeletons for mitigating MSDs in the construction industry.

16 September 2025 in Smart and Sustainable Built Environment
Verified
Journal Article
Open access
IAIsaac Akomea-Frimpong
Isaac Akomea-Frimpong
JOJoshua Nsiah Addo Ofori
Joshua Nsiah Addo Ofori
BENJAMIN BOTCHWAYBENJAMIN BOTCHWAY
BENJAMIN BOTCHWAY
Roksana Jahan TumpaRoksana Jahan Tumpa
Roksana Jahan Tumpa
PTPortia Atswei Tetteh
Portia Atswei Tetteh
Purpose: Public-private partnership (PPP) projects represent a large percentage of infrastructure development in every economy. According to the Private Participation in Infrastructure database (World Bank Group), the PPP model has delivered many projects around the world. These projects largely follow the linear economy model, which opposes sustainable practices and increases the financial burden on the public purse. In recent times, practitioners and governments are undertaking major reviews of these projects and embracing circular economy (CE) models to promote the sustainability of the projects. Therefore, this study aims to assess the major influencing factors towards CE in PPP projects. Design/methodology/approach: Primary data sourced with questionnaires from practitioners in different countries were analyzed with the fuzzy synthetic data analysis approach. Findings: The key findings demonstrate four categories of enabling factors on CE in PPP projects: environmental protection initiatives, effective leadership and project team proficiency, effective stakeholder engagement and regulatory compliance and innovative technologies and data sharing. Research limitations/implications: This article contributes to the body of knowledge by expanding the limited information on CE practices for PPP-sponsored projects, and it lays ground for further studies into the influencing factors on CE. Practical implications: Practitioners will be guided and understand areas to strengthen to realize CE potentials in PPP projects. Originality/value: As the first of its kind in the domain of PPP research, this empirical study highlights the key groups of factors influencing the shift towards circular PPP practices, which will support future scholarly research. The findings also provide detailed insights for practitioners on major areas (factors) affecting the application of CE initiatives towards attaining sustainable development goals in PPP practices and policies.

2 September 2025 in Journal of Information Technology in Construction
Verified
Journal Article
Open access
PDF file
JOJoshua Ofori
Joshua Ofori
MTMariam Tomori
Mariam Tomori
OOOmobolanle Ogunseiju
Omobolanle Ogunseiju
Masonry is one of the most labour-intensive construction trades due to the repetitive, fast-paced, and strenuous tasks involved, which increase the risk of musculoskeletal disorders (MSD). While exoskeletons have been proposed as a means of reducing MSDs, few studies have investigated their impact on productivity, physical discomfort, and cognitive states during masonry tasks. To close this gap, the current study looks into the effects of active and passive exoskeletons on productivity, physical discomfort, and cognitive states while performing masonry tasks. The study consists of three rounds of masonry tasks performed by 19 participants, both with and without exoskeleton support, to determine the effects of exoskeletons on productivity and perceived discomfort. Using subjective and objective measures, the study found that active exoskeletons increase productivity during masonry tasks by 15.3% and 16.2%, respectively, compared to non-exoskeleton and passive exoskeleton conditions. In terms of physical discomfort, the findings revealed that both active and passive exoskeletons reduced low back discomfort while causing discomfort in the upper extremities during masonry tasks. The cognitive state analysis also revealed that active exoskeletons increased participants' levels of relaxation (58.40%), focus (53.10%), excitement (68.54%), and attention (46.31%) compared to other conditions. Both active and passive exoskeletons reduced stress during masonry tasks. This study provides a novel, multidimensional understanding of human-exoskeleton interaction in the construction industry by integrating productivity metrics, physical discomfort, and neurophysiological indicators (EEG-based cognitive states) to evaluate both the cognitive and emotional well-being of workers. The study assesses the impacts of passive and active exoskeletons on task productivity and perceived discomfort across different body parts using subjective and objective evaluations , offering new insights into the holistic impact of wearable robotics on construction labor. Understanding these may tend to assist construction firms in their selection of exoskeletons for specific construction activities and may also guide exoskeleton manufacturers in providing exoskeletons which are more tailored to the construction industry.

23 September 2025 in International Journal of Building Pathology and Adaptation
Verified
Journal Article
Closed access
JOJoshua Nsiah Addo Ofori
Joshua Nsiah Addo Ofori
AAAmma Kyewaa Agyekum
Amma Kyewaa Agyekum
MKMalik Mansoor Ali Khalfan
Malik Mansoor Ali Khalfan
BENJAMIN BOTCHWAYBENJAMIN BOTCHWAY
BENJAMIN BOTCHWAY
PAPrince Antwi-Afari
Prince Antwi-Afari
Purpose: The construction industry is subject to criticism due to its substantial utilization of resources and generation of waste. The concepts of circular economy (CE) and zero waste (ZW) present viable and sustainable solutions; however, achieving significant waste reduction remains a challenge. This paper investigates the barriers hindering the attainment of ZW production in the construction industry in Ghana. Design/methodology/approach: A comprehensive literature review was conducted, followed by expert assessment, to identify 24 potential barriers to ZW. A survey questionnaire was then used to solicit the views of construction professionals on the barriers to ZW production in the Ghanaian construction industry. Utilizing exploratory factor analysis, the responses were categorized into four barriers: infrastructure and technology, regulation and awareness, management and planning and operational and implementation barriers. The identified barriers were objectively ranked and prioritized through the application of a fuzzy synthetic evaluation. Findings: The findings reveal that the main barriers impacting ZW production are those associated with infrastructure and technology, regulation and awareness, management and planning and operational and implementation issues. The results emphasize the importance of implementing a comprehensive approach that includes advancements in technology, more stringent regulations, increased awareness, strategic planning and improved operations to facilitate the shift toward ZW production. Originality/value: Barriers to integrating CE principles and attaining ZW in the Ghanaian construction sector are presented to assist key stakeholders and policymakers in addressing these challenges while also achieving ZW.

16 September 2025 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
JOJoshua Nsiah Addo Ofori
Joshua Nsiah Addo Ofori
Saeed BanihashemiSaeed Banihashemi
Saeed Banihashemi
AAAmma Kyewaa Agyekum
Amma Kyewaa Agyekum
BENJAMIN BOTCHWAYBENJAMIN BOTCHWAY
BENJAMIN BOTCHWAY
Purpose: Workplace health and safety (WHS) has emerged as a growing concern in the construction industry, particularly in developing economies where competitive pressures and regulatory environments are evolving. Despite a growing awareness of this problem, empirical evidence relating to the integration of WHS-related costs into tendering processes and their subsequent impact on pricing in tender prices remains limited. This study aims to investigate the extent to which Ghanaian contractors consider WHS items when preparing bids and aims to quantify the associated financial costs. Design/methodology/approach: Using a purposive and snowball sampling technique, structured questionnaires were administered to 103 construction professionals from the Ghana Institute of Surveyors, Ghana Institution of Engineers and Ghana Institute of Architects. The questions solicited the views of professionals on the frequency with which they considered WHS items during the tendering process and their associated cost implications. The data were analyzed using both descriptive and inferential statistics. Findings: The findings revealed that WHS items are moderately to widely taken into account during tender pricing, with the majority of professionals indicating a typical cost increase of around 5% when WHS provisions are made. Additionally, significant differences in WHS pricing practices were found among experience levels, types of firms and categories of clients. Originality/value: The study identified how construction professionals in Ghana allocate costs related to WHS during the tendering process and quantifies the average approximate percentage by which tender prices of contractors increase due to the allocation of resources for WHS items.